Combined Synopsis/Solicitation
CGC Oak Dockside Repairs
Department of Homeland Security · U.S. Coast Guard
Small business set-aside · At the homeport: 1406 Quay Wall, Naval Station Newport, RI. The SAM.gov place… (from the AI summary)
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 1 of 6 attachments weren't read (ATTACHMENT 4 Request for Clarification Form -CGC OAK FY27.docx). Check the attachments on SAM.gov.
Only small businesses can bid on solicitation 70ZU0227QIBCT0004, the U.S. Coast Guard's dockside repairs to cutter OAK (a 225-foot buoy tender) at its homeport, Naval Station Newport, RI. The response due date is December 10, 2026, 2:00 PM Eastern Time, by email. Work runs from about March 24, 2027 to about June 2, 2027.
Who can bid (7)
- Small business set-aside: only small businesses can bid. The NAICS size standard is 1,300 employees. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Joint Certification Program (JCP) certification and number, needed to obtain export-controlled drawings and references From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Past performance: one to three relevant ship repair contracts completed in the last three years as prime contractor From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
Show all 7Show fewer
- Welding certifications and qualifications for welding work items From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Certified technical representatives (such as NACE-certified coating inspectors, nondestructive test inspectors, weld examiners, marine chemists), your own or a subcontractor's From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Proof of enrollment in E-Verify From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Proof of insurance (statement of coverage from current carrier) From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
How to submit: Email to Sandra.a.martinez@uscg.mil and arlene.d.wright@uscg.mil. Each email must stay under 10 MB.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 18, 2026.
- Serious: Small business set-aside. Only small businesses under the 1,300-employee size standard can bid, and the contract lists the limitations on subcontracting clause, which limits how much work you can pass to subcontractors. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Serious: Drawings need Joint Certification Program (JCP) status. Export-controlled drawings and references go only to JCP-certified vendors, so a firm without JCP status may not be able to see the full specification. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Worth checking: Questions strongly encouraged by December 7, 2026, 2:00 PM EST. Questions go on Attachment 4 (Request for Clarification) to the Contracting Officer and contract specialist; later requests may not be accepted. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
Show all 11Show fewer
- Worth checking: Site visit and ship check no later than December 1, 2026. Quoters are urged and expected to inspect the site; the text does not make it mandatory, so a visit is strongly encouraged. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Worth checking: Documents mix cutter OAK with cutter ELM and fiscal year 2026. The site visit table names USCGC ELM, the specification and pricing sheet say FY2026, and the title of this notice says FY27. Ask the contracting officer which vessel and year apply. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Worth checking: Critical inspection reports due in the first 25% of the work period. Work items 14 to 22 (chain stoppers, winches, capstan, davits, hoist, crane) need Critical Inspection Reports early, so schedule those items first. From ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf
- Worth checking: Work is aboard the cutter at Newport, RI, with temporary crew berthing. You must provide duty section berthing close to the vessel, which adds cost and logistics if you are not based near Newport. From ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf
- Minor: Response due date text has a stray fragment. SAM.gov and the notice give December 10, 2026, 2:00 PM Eastern, but the RFQ text shows the date followed by a stray "3/2026"; confirm the date with the contracting officer. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
- Minor: Lay day rate and mark-up percentage not on the pricing sheet read. The evaluation rates the lay day rate, hourly composite rate and mark-up percentage, but the pricing sheet shows only job lines and the composite labor rate line. From ATTACHMENT 1 PRICING OAK (WLB 225B) BLANK.pdf
- Minor: Two NAICS codes in the documents. The RFQ and SAM.gov use 336611 (ship repair), while the schedule line in the SF 1449 continuation shows 488330. From 70ZU0227QIBCT0004_OAK.pdf
- Minor: Payment by percent complete, 25 percent minimum per line. You cannot bill a contract line item (CLIN, one priced line of the order) until it is 25 percent complete, which affects cash flow. From 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf
Read from the notice and 5 attachments. 1 of 6 not read. Show which files.
- 70ZU0227QIBCT0004_OAK.pdf (read)
- 70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf (read)
- ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf (read)
- ATTACHMENT 1 PRICING OAK (WLB 225B) BLANK.pdf (read)
- ATTACHMENT 3 Past Performance Information Form.docx (read)
- ATTACHMENT 4 Request for Clarification Form -CGC OAK FY27.docx: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Clean and inspect tanks (main propulsion fuel service, hydraulic oil, potable water, potable water pneumatic tanks), grey water and sewage piping
- Commercially clean engine and generator exhaust piping and all vent ducts (engine and motor room, galley and pantry, laundry exhaust, all other)
- Inspect and service buoy-handling and deck machinery: hydraulic and mechanical chain stoppers, crossdeck winches, inhaul winch, warping capstan, single-point and dual-point davits, commissary hoist, buoy crane, cargo hatch
- Clean, inspect, hydrostatically test and lift compressed air receivers and system valves
- Renew items: LED flood lights, weathertight door and watertight hatch, galley supply fan and pre-heater, weather deck kickpipes, mast guardline staples, gooseneck ventilation
- Renew or seal interior deck coverings (wet-area covering, carpeting, polymeric passageway decks) and preserve compartment decks
- Provide fire prevention measures and temporary services, including duty section berthing for 2 male and 2 female crew
- Send a Condition Found Report (CFR) for abnormal conditions, and quote additional work using the composite labor rate (one all-in hourly rate; pricing sheet estimate 1050 hours)
- Contract type
- Indefinite delivery requirements contract (IDR): the Coast Guard issues task orders, expected to be firm-fixed-price (one set price, whatever the work costs). Task Order One is evaluated with the contract.
- Period of performance
- Starts on or about March 24, 2027 and ends on or about June 2, 2027. Anticipated award on or by January 10, 2027.
- Place of performance
- At the homeport: 1406 Quay Wall, Naval Station Newport, RI. The SAM.gov place of performance field is blank.
- Estimated value
- Not stated
- How they'll choose
- Best value tradeoff (the Government weighs quality against price, not lowest price alone). Technical Capability counts more than Past Performance, and the two together count more than Price.
- Offers due
- December 10, 2026, 2:00 PM Eastern Time
- How to submit
- Email to Sandra.a.martinez@uscg.mil and arlene.d.wright@uscg.mil. Each email must stay under 10 MB.
What they'll judge offers on
- Technical Capability: graphical planning document (period of performance for each work item and sub-task, Critical Inspection Report (CIR) dates, Coast Guard Inspector dates, technical representative and subcontractor dates, critical path, float, task dependencies)
- Past Performance: relevant ship repair work as prime contractor, rated on Quality of Services, Schedule and Management
- Price: total price for the work items plus foreseeable costs, plus the lay day rate, hourly composite rate and mark-up percentage
What to include when you submit
- Send price, technical capability and past performance information in separate emails
- Fill out Attachment 1 (the pricing sheet) and send an electronically signed PDF plus an Excel (.xlsx) copy
- Send a graphical planning document (such as a Gantt chart) for the dockside work
- Identify at least one but not more than three relevant ship repair contracts completed in the last three years as prime contractor, each on Attachment 3 (Past Performance Information Form); if you have none, explain why
- If a subcontractor will do 25% or more of the total evaluated price, send the same past performance data for the subcontractor; for a team or joint effort, send enough to judge the team
- Sign Standard Form 1449 (SF 1449: the form you sign and return as your offer): complete blocks 12, 17a, and 30a, 30b and 30c
- Send any signed solicitation amendments (Standard Form 30)
- Send proof of enrollment in E-Verify (the federal employment eligibility system)
- Send proof of insurance (a statement of coverage from your current carrier)
- List all planned subcontractors with name, address, contact, work item, and percentage of work; confirm in writing that any subcontractor meets technical representative requirements (certified coating inspectors, nondestructive test inspectors, weld examiners, marine chemists)
- Send the welding certifications and qualifications the specification requires for any welding work items
- Number all pages and label them USCGC Oak Dockside Repairs FY27, RFQ 70ZU0227QIBCT0004, with the quote date; quotes must stay valid for 120 days
Not in the notice text
- About 30,000 characters from the middle of the RFQ and about 228,000 characters from the middle of the specification were left out of the text, so some clauses, drawing request terms and work item details were not seen.
- Attachment 4, the Request for Clarification Form, could not be opened.
- The deadline to request drawings and the Arrival Conference date are not in the text read.
- The Government's estimate and the contract's dollar value are not given in the text read.
- Whether a lay day rate or mark-up percentage must be quoted is unclear, because the pricing sheet read shows neither.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- CG-Sea-C22, Alameda, CA
- Product/service code
- J998 · Non-Nuclear Ship Repair (EAST)
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336611)
- Versions
4 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0003Due Dec 10, 2026
- Nov 18, 2026 · Amendment 0002Due Dec 10, 2026
- Nov 17, 2026 · Amendment 0001 (this version)Due Dec 10, 2026
- Nov 16, 2026 · Combined Synopsis/SolicitationDue Dec 10, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Uscgc Maria Bray (WLM 562) Dockside Repair FY27Only small businesses can bid: the U.S. Coast Guard wants a ship repair yard to do dockside repairs on the cutter MARIA BRAY at its homeport in Atlantic Beach, FL, solicitation…
- Dockside (DS) – USCGC STORIS Fiscal Year 2027
- Uscgc Hammer (Wlic 75302) USCG 68A Barge (68014) Drydock Repairs FY2027Only small businesses can send quotes for drydock repairs of the Coast Guard cutter HAMMER (WLIC 75302) and its 68-foot barge (68014), under solicitation 70ZU0127QPBPL0001.
- Nonskid for Naval Ships/VesselsOnly small businesses can bid on solicitation N4002727R0004, a total small business set-aside from the Navy's Southeast Regional Maintenance Center.
- CGC Manta DD FY27The U.S. Coast Guard wants a shipyard to drydock and repair the cutter USCGC MANTA (WPB 87320), request for quotations 70ZU0127QPBPL0006, with work running April 27, 2027 to July…