Cableway Crane Refurbishment

Department of the Interior · Bureau of Reclamation

More open BOR contracts

Save to My bidsFree account. Log in
View on SAM.gov ↗

Key facts

Response due
Due in 24 daysDec 18, 2026, 2:00 PM PST · 5:00 PM EasternAdd deadline to calendar
Place of performance
Hoover Dam Powerplant, about 8 miles northeast of Boulder City, Nevada (Clark County, NV and 1 more place (from the AI summary)
See all placesThe AI summary names these places:Hoover Dam Powerplant, about 8 miles northeast of Boulder City, Nevada (Clark County, NVMohave County, AZ)
Solicitation number
140R3026R0010
NAICS
237990 · Other Heavy and Civil Engineering Construction

Contracting contact

Maxwell Watanga
mwatanga@usbr.gov702-293-8045

Email me about this notice. We'll email you if it's amended or awarded, and send two reminders: one a week before responses are due and one two days before.

No account needed. We'll send a link to confirm, and every email has a one-click stop. Want matches for your business too? Create a free account.

AI summary Beta

Written by AI from the notice and its attachments. Check dates on SAM.gov.

This summary may miss requirements: 2 of 14 attachments weren't read (Sign_In_Sheet_Cableway_Site_Visit_0001.pdf, Attachment_02_-_Drawings_140R3026R0010.pdf). Check the attachments on SAM.gov.

The Bureau of Reclamation (Lower Colorado Region) wants one contractor to refurbish the 150-ton cableway crane at Hoover Dam, near Boulder City, Nevada: replace the main track cables and other wire ropes, refurbish the carriage, replace sheaves, re-tension, then load test and certify the crane. It is a full and open (no set-aside) firm-fixed-price job with an estimated size of $5 million to $10 million, about 850 days of performance, and proposals are now due December 18, 2026.

Who can bid (7)

  • Open to any size business (full and open, no set-aside); size standard for NAICS 237990 is $45M From Solicitation_No__140R3026R0010.pdf
  • Active SAM.gov registration with a UEI and completed online representations and certifications From Solicitation_No__140R3026R0010.pdf
  • Rope access workers at height must hold IRATA or SPRAT certification (Level 1 minimum, Level 3 for the supervisor) From Attachment_01_-_Statement_of_Work__140R3026R0010.pdf
Show all 7Show fewer
  • A licensed Professional Engineer must do the structural analysis of the anchor points and concrete footings From Attachment_01_-_Statement_of_Work__140R3026R0010.pdf
  • Performance and payment bonds (CLIN 001); due within 15 days after notice of award
  • Prime contractor must perform the majority of the on-site work and keep a representative on site if subcontractors are used From Attachment_01_-_Statement_of_Work__140R3026R0010.pdf
  • Relevant experience: at least 3 construction projects at height with fall protection comparable to the roughly 200 ft tower, and at least 3 projects needing concrete footings, anchors and structural analysis; 3 similar past projects within the last 6 years for past performance

How to submit: due December 18, 2026 at 2:00 PM Pacific Time (extended by Amendment 3 from 08/12/2026). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.

Things to watch (9)

From the version posted Aug 11, 2026.

SeriousWorth checkingMinor

  • Serious: Extreme-height, specialized work. Work is done on cables about 600 feet above the canyon floor, with rope access crews, rescue plans and overhead hazards, so you need proven high-risk rigging experience or a strong partner. From Attachment_01_-_Statement_of_Work__140R3026R0010.pdf
  • Serious: Strict experience screens. The top-ranked factor requires several comparable high-elevation and structural projects, with cableway or heavy cable tensioning experience favored, which can knock out newer or smaller firms.
  • Serious: Bonds and large up-front materials buying. You must price and furnish performance and payment bonds and buy and deliver all materials in year one, while payment for those materials only comes after the government accepts the delivery submittal. From Attachment_01_-_Statement_of_Work__140R3026R0010.pdf
Show all 9Show fewer
  • Worth checking: Long schedule with 10% retainage. On-site work is not scheduled until May 2028 because of a power plant outage, and 10% of each line item payment is held until all submittals are accepted.
  • Worth checking: All-or-nothing pricing. You must price every line item; leaving any out can get the proposal thrown out. From Solicitation_No__140R3026R0010.pdf
  • Worth checking: Site visit status unclear. Vendors are expected to inspect the site, but the site visits already held were in July 2026 and a new one is only promised in a later amendment, so check SAM.gov for any new date.
  • Worth checking: Award may come with no discussions. The government may pick a winner from initial proposals, so your first submission has to be your best on both technical and price. From Solicitation_No__140R3026R0010.pdf
  • Minor: Government site safety and security rules. Work follows Reclamation Safety and Health Standards and Hoover Dam security requirements, and workers need protective gear and congested, narrow-road access with limited staging space.
  • Minor: Proposal due date moved several times. The due date went from 07/31/2026 to 08/12/2026 and then to 12/18/2026, so more changes are possible; watch for further amendments.
Read from the notice and 12 attachments. 2 of 14 not read. Show which files.
  • Solicitation_No__140R3026R0010.pdf (read)
  • Sol_140R3026R0010_Amd_0003.pdf (read)
  • Sol_140R3026R0010_Amd_0002.pdf (read)
  • Sol_140R3026R0010_Amd_0001.pdf (read)
  • Sol_140R3026R0010.pdf (read)
  • Attachment_01_-_Statement_of_Work__140R3026R0010.pdf (read)
  • Attachment_07_-_Small-Business-Subcontracting-Plan_140R3026R0010.docx (read)
  • Attachment_04_-_Bid_Bond_SF24_140R3026R0010.pdf (read)
  • Attachment_03a_-_Wage_Determination_AZ20260006.pdf (read)
  • Attachment_03b_-_Wage_Determination_NV20260024.pdf (read)
  • Attachment_05_-_Performance_and_Payment_Bonds.pdf (read)
  • Attachment_06_-_Release_of_Claims_Form_DI-137.pdf (read)
  • Sign_In_Sheet_Cableway_Site_Visit_0001.pdf: not summarized: open it on SAM.gov
  • Attachment_02_-_Drawings_140R3026R0010.pdf: not summarized: open it on SAM.gov
All attachments on SAM.gov
Full summary

What they want

  • Replace the six 3-1/2 inch track wire ropes (track cables), which span about 1,615 feet, mostly above the canyon
  • Replace the two 3/4 inch button line ropes, buttons and button line tensioners; replace the 1-1/8 inch inhaul, outhaul and hoist ropes
  • Refurbish the existing carriage and fall block; redesign, refurbish and install the slack carriers; replace sheaves
  • Re-tension the track cables and replace the hydraulic hand pump, tensioning system and lines on the Nevada side
  • Lubricate all wire ropes and the hoist house mechanical components
  • Provide engineering and safety analysis, including an anchor point and concrete footing report
  • Perform a 125% capacity load test, then an annual inspection and certify the crane
Contract type
Firm-fixed-price, awarded through a negotiated RFP (FAR Part 15); price schedule has 7 lump-sum line items (CLINs 001-007)
Period of performance
850 calendar days after award (listed as 09/30/2026 to 12/29/2028). Materials delivered to site in year 1; on-site work in year 2, scheduled to start May 2028
Place of performance
Hoover Dam Powerplant, about 8 miles northeast of Boulder City, Nevada (Clark County, NV and Mohave County, AZ)
Estimated value
Estimated magnitude between $5,000,000 and $10,000,000
How they'll choose
Best value tradeoff (quality predominance): five technical factors combined are significantly more important than price; award may be made without discussions
Offers due
December 18, 2026 at 2:00 PM Pacific Time (extended by Amendment 3 from 08/12/2026)

What they'll judge offers on

  • 1. Relevant Experience
  • 2. Technical Capability
  • 3. Past Performance
  • 4. Safety Plan
  • 5. Small Business Participation
  • 6. Price (least important)

What to include when you submit

  • Must submit a proposal on all items (all of Price Schedule A); no partial offers
  • Price all seven CLINs, including performance and payment bonds, mobilization, materials, transportation, engineering/safety, on-site construction, and load testing and inspection
  • Technical proposal must address each evaluation factor (relevant experience, technical capability, past performance, safety plan, small business participation)
  • Acknowledge receipt of each amendment (Amendments 0001 to 0003)
  • Written questions go to Max Watanga (maxwell_watanga@ios.doi.gov) and Luis Gallardo (luis_gallardo@ios.doi.gov); the last published question deadline was 07/30/2026
  • Other-than-small offerors may be asked to submit and negotiate a small business subcontracting plan (Attachment 07 form)

Not in the notice text

  • How and where to submit proposals (email, portal or sealed), file format and page limits; the instructions to offerors (Section L) were mostly left out of the files provided
  • Whether a bid guarantee (bid bond, form SF 24 is attached) is required and its amount
  • Whether and when a second site visit will be held
  • Drawings (Attachment 02) were too large to read, so full technical detail is missing
  • Middle sections of the Statement of Work (about sections 3.1 to 3.7, including track cable and material testing requirements) were not read
  • Security requirements and background check details (clause WBR 1452.237-80) were not read
  • Wage rates: Davis-Bacon wage determinations for Arizona and Nevada are attached, but the Arizona one was only partly read

With a free account

  • An AI fit check of this notice against your business
  • Questions about this notice and its files, answered by AI
  • Who won work like this before, and what it paid
Save to My bids

Free account: 1 AI question or fit check a month. Pro: 15.

Notice details

Notice type, codes, versions and files
Posted
Aug 11, 2026
Notice type
Solicitation
Office
Lower Colorado Regional Office, Boulder City, NV
Product/service code
Z1KA · Maintenance of Dams
Business type
Construction & renovation (FedReady's grouping, from NAICS 237990)
Versions

4 versions have been posted, newest first.

  • Aug 11, 2026 · Amendment 0003 (this version)Due Dec 18, 2026 (changed)
  • Jul 20, 2026 · Amendment 0002Due Aug 12, 2026
  • Jul 9, 2026 · Amendment 0001Due Aug 12, 2026 (changed)
  • Jun 17, 2026 · SolicitationDue Jul 31, 2026
Attachments

14 files named in the AI summary, on SAM.gov:

  • Sign_In_Sheet_Cableway_Site_Visit_0001.pdfNot summarized: open it on SAM.gov
  • Attachment_02_-_Drawings_140R3026R0010.pdfNot summarized: open it on SAM.gov
  • Solicitation_No__140R3026R0010.pdfRead by the AI summary
  • Sol_140R3026R0010_Amd_0003.pdfRead by the AI summary
  • Sol_140R3026R0010_Amd_0002.pdfRead by the AI summary
  • Sol_140R3026R0010_Amd_0001.pdfRead by the AI summary
  • Sol_140R3026R0010.pdfRead by the AI summary
  • Attachment_01_-_Statement_of_Work__140R3026R0010.pdfRead by the AI summary
  • Attachment_07_-_Small-Business-Subcontracting-Plan_140R3026R0010.docxRead by the AI summary
  • Attachment_04_-_Bid_Bond_SF24_140R3026R0010.pdfRead by the AI summary
  • Attachment_03a_-_Wage_Determination_AZ20260006.pdfRead by the AI summary
  • Attachment_03b_-_Wage_Determination_NV20260024.pdfRead by the AI summary
  • Attachment_05_-_Performance_and_Payment_Bonds.pdfRead by the AI summary
  • Attachment_06_-_Release_of_Claims_Form_DI-137.pdfRead by the AI summary

See attachments on SAM.gov

Before you respond

  • How to respond to a solicitation (8 steps)
  • How to read a government solicitation
  • How to price a government contract

Terms on this notice: Solicitation

686 more open construction & renovation contracts

See them in the search

Get matched free or get new ones by email each week.

Full notice text from SAM.gov
Cableway Crane Refurbishment - Hoover Dam

Get new contracts like this one by email. Our free weekly contracts email, no account needed: we check SAM.gov every Monday morning (Eastern) and email you only when something new is posted, up to 10 still-open notices with due dates and set-asides.

We'll send a link to confirm first, and every email has a one-click stop.

FedReady

Opportunity data comes from SAM.gov's public Contract Opportunities extract. FedReady is an independent company and is not affiliated with SAM.gov or any government agency. Always confirm details on SAM.gov before responding.

The weekly contracts email sends new federal contracts in your line of work, free, no account needed. Get the weekly contracts email

Follow FedReady: TikTok (opens in a new tab) · YouTube (opens in a new tab) · LinkedIn (opens in a new tab) · X (opens in a new tab) · Instagram (opens in a new tab) · Facebook (opens in a new tab)

FedReady

SearchGuidesHow it worksPricingAboutHow we check our dataCompare with other toolsHelp & contactAccessibilityTermsPrivacySecurityhello@fedready.us

Free tools

NAICS code lookupCAGE code and UEI lookupSBA size standard checkerHUBZone map checkerSAM registration status checkSCA bid price calculatorAll free tools

Browse contracts

Contracts by industry and stateContracts by agencyRecent contract awardsExpiring contractsProcurement forecastsSubcontracting plansSBIR and STTRHUBZones by stateContractorsNAICS codesMonthly set-aside reportsSBA certificationsGlossaryVideos

© 2026 ZohaDigital LLC, the company behind FedReady, in Charlotte, North Carolina. All rights reserved.