The U.S. Army Corps of Engineers (Alaska district) wants a contractor to dredge a new deepwater basin and expand the outer basin at the Port of Nome, Alaska. This is Phase 2 of the project, bid as an invitation for bid (sealed bids, award mainly on price) under full and open competition. The response due date is December 17, 2026, 2:00 PM Alaska time.
Who can bid
- Meet the definitive responsibility criteria stated for this invitation for bid; the criteria themselves are not in the notice text
Things to watch (4)
From the version posted Nov 17, 2026.
- Serious: Definitive responsibility criteria. Bidders must meet specific stated criteria, such as dredging experience or equipment, that are not listed in the notice text; check the solicitation.
- Worth checking: Davis-Bacon wages likely apply (a general rule). This is the general rule, not something the notice says: federal construction over $2,000 in the U.S. pays at least the Davis-Bacon wage rates in the wage determination attached to the solicitation. This summary doesn't name one: find it on SAM.gov and price your labor from it.
- Minor: Priority-rated order (DPAS DO-C2). The work carries a Defense Priority and Allocation System rating, which gives it priority over other orders.
Show all 4Show fewer
- Minor: SAM.gov set-aside not stated. SAM.gov does not state a set-aside, and the text says full and open competition.
Read from the notice text only.
Full summary
What they want
- Base item: dredge about 578,000 cubic yards to a design depth of -40 feet MLLW (mean lower low water)
- Option item: dredge about 346,000 cubic yards to a design depth of -28 feet MLLW
- Dredge directly against the newly constructed Opencell sheet pile docks
- Place all dredged material in a designated nearshore placement area
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work costs); invitation for bid
- Place of performance
- Nome, Alaska
- Estimated value
- Not stated
- Offers due
- December 17, 2026, 2:00 PM Alaska time
Not in the notice text
- Whether there is a site visit is not stated
- The definitive responsibility criteria are not listed in the notice text
- How to submit a bid, and the performance period, are not stated
- Bonding requirements are not stated
- Whether the Phase 1 work has any effect on who may bid is not stated
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- W2SN ENDIST Alaska, Anchorage, AK
- Product/service code
- Y1KF · Construction of Dredging Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
3 versions have been posted, newest first.
- Nov 17, 2026 · Solicitation (this version)Due Dec 17, 2026
- Nov 2, 2026 · Amendment 0001No date on SAM.gov
- Nov 2, 2026 · PresolicitationNo date on SAM.gov
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Project Title: Port of Nome Modification - Phase 2 Project Location: Nome, Alaska NAICS: 237990, Size Standard: $37,000,000 Full and Open Competition Invitation for Bid with Definitive Responsibility Criteria DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements Description of Work: The Port of Nome Modification - Phase 2 project consists of unclassified dredging to establish a new deepwater basin and expand the existing outer basin at the Port of Nome. The base item includes dredging approximately 578,000 cubic yards of material at a design depth of -40 feet MLLW with a 2.0-foot allowable dredging tolerance (overdepth) establishing a maximum pay line of -42.0 feet MLLW. The option item includes dredging approximately 346,000 cubic yards to a design depth of -28 feet MLLW, with a 1.0-foot allowable dredging tolerance establishing a maximum pay line of -29.0 feet MLLW. Dredging will occur directly against the newly constructed Opencell sheet pile docks. All dredged material will be placed in a designated nearshore placement area. The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and local laws, regulations, and procedures. The type of contract shall be firm-fixed price. Construction Wage Rates (formerly Davis-Bacon Act wage rates) shall apply.