Solicitation
B304 Drive Fan Replacement
Department of Defense · Department of the Air Force
Small business set-aside · Offutt AFB, NE
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov.
Only small businesses can bid: the Air Force's 55th Contracting Squadron at Offutt AFB, NE wants a new fan drive (gearbox) for cooling tower #3 at Building 304, plus new motor wiring and conduit repair (solicitation FA460027Q0009). The response due date is December 14, 2026, 10:00 AM Central. It is a firm-fixed-price (FFP: one set price) job with work from December 21, 2026 to March 22, 2027. A base entry form is due before the site visit.
Who can bid (4)
- Small business under NAICS 561210 (total small business set-aside): only small businesses can bid From Solicitation - FA460027Q0009.pdf
- Small business size standard of $25,000,000 for NAICS 561210, as the solicitation form gives it From Solicitation - FA460027Q0009.pdf
- Registered in the System for Award Management (SAM.gov), the federal contractor database
Show all 4Show fewer
- Base access for work at Offutt AFB: an entry authority list form for the site visit; access is not guaranteed
How to submit: Sent to the Contracting Office. The notice lists email contacts: joshua.peters.17@us.af.mil (Contract Specialist) and casey.hupton.1@us.af.mil (Contracting Officer); it does not name a separate submission address. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Total small business set-aside: only small businesses can bid. Firms that are not small under NAICS 561210 are not eligible. From Solicitation - FA460027Q0009.pdf
- Worth checking: Site visit on December 1, 2026, with an entry list form due November 24, 2026. The site visit is Tuesday, December 1, 2026, 1:00 PM CST. The attached Entry Authority Listing (EAL) form, which lists each visitor's personal details, is due by close of business November 24, 2026. Base access is not guaranteed. The text does not call the visit required.
- Worth checking: Work must be coordinated with another contractor. A different contractor supplies and installs the new motor. You must align the gearbox to its shaft and connect the wiring with them, so delays on their side can affect your schedule. From Attachment 1 - PWS - 11.19.2026.pdf
Show all 9Show fewer
- Worth checking: Scope is wider than the notice summary. The notice describes only the fan drive, but the PWS also requires replacing the motor wiring, repairing conduit and megger testing, which adds electrical work to price. From Attachment 1 - PWS - 11.19.2026.pdf
- Minor: Questions are due December 7, 2026. Questions go in writing to the Contracting Office by 10:00 AM CST on December 7, 2026; answers are posted as an amendment.
- Minor: Crane use needs FAA and airfield coordination. Any crane use on the base must follow Federal Aviation Administration notice and airfield coordination rules. From Attachment 1 - PWS - 11.19.2026.pdf
- Minor: Two weeks' notice for outages. The tower must be shut down for the work, and the Government needs two weeks' notice to allow an outage. From Attachment 1 - PWS - 11.19.2026.pdf
- Minor: Solicitation number is written two ways. The notice heading says FA460026Q0009, while SAM.gov and the form give FA460027Q0009 (also written FA4600-27-Q-0009). Ask the contracting officer if unsure which to cite.
- Minor: Service Contract Act wage rules apply. The Service Contract Labor Standards apply, with wage determination 2015-5005, Revision 30, so your labor price must meet those minimum wages.
Read from the notice and 4 attachments. Show which files.
- Solicitation - FA460027Q0009.pdf (read)
- Attachment 1 - PWS - 11.19.2026.pdf (read)
- Attachment 3 - EAL - 11.19.2026.pdf (read)
- Attachment 2 - Wage Determination 2015-5005 V30 - 08.27.2026.pdf (read)
Full summary
What they want
- Buy and supply a new fan drive like-for-like in fit, form and function, matching the cooling tower #3 fan and motor (an Amarillo model F110 right-angle drive is installed now)
- Remove the fan guard and fan blade, replace the fan drive and gearbox with its shaft, coupling and mounting parts, then align and balance the fan and put the guard back
- Replace the wiring and repair or replace the conduit and connectors from the fan motor to the tower enclosure boundary; test the wiring with a megger (an insulation tester)
- Work with the separate contractor that is supplying and installing the new motor, so the tower is fully working
- Provide all lock-out/tag-out, start-up testing and at least a 1-year warranty on all labor and new materials
- Clean up and dispose of removed equipment and waste off base
- Contract type
- Firm-fixed-price (FFP: one set price); two lines: labor and materials, each QTY 1 Each
- Period of performance
- December 21, 2026 to March 22, 2027 (no options stated)
- Place of performance
- Offutt AFB, NE (Building 304, cooling tower #3)
- Estimated value
- Not stated
- How they'll choose
- Quotes are ranked by total evaluated price, lowest first. The Government checks them in order until three are technically acceptable, and may award without discussions.
- Offers due
- December 14, 2026, 10:00 AM Central (CST) (from the version posted Nov 19, 2026; amended since)
- How to submit
- Sent to the Contracting Office. The notice lists email contacts: joshua.peters.17@us.af.mil (Contract Specialist) and casey.hupton.1@us.af.mil (Contracting Officer); it does not name a separate submission address
- Page limits
- Plan: no more than 10 pages (extra pages are discarded and not reviewed)
What they'll judge offers on
- Price: total evaluated price, the sum of the line item prices; checked for price reasonableness
- Technical: a plan of no more than 10 pages on how the PWS will be met, with all parts and equipment specifications; rated acceptable or not acceptable
What to include when you submit
- Send a signed and dated offer showing the solicitation number, the company name, address and telephone number, and its Unique Entity Identifier (UEI)
- Send one electronic copy of the completed pricing in the line item structure on page 3 of the solicitation, with every line filled in
- Include a plan of up to 10 pages describing how each PWS requirement will be met, with all specifications of parts and equipment needed
- Include answers to provisions that need the offeror's input (other than those already in SAM.gov) and a statement of how far you agree with all terms and any amendments
- Fill in blocks 12, 17, 23, 24 and 30 of the Standard Form 1449 (the commercial offer form)
- Keep prices firm for 60 calendar days after the response due date
Not in the notice text
- The Government's estimated value is not given.
- Whether the site visit is required for a quote is not stated; the PWS separately says the contractor must visit the site before starting any work.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- FA4600 55 CONS PKP, Offutt AFB, NE
- Product/service code
- J041 · Maint/Repair/Rebuild of Equipment – Refrigeration, Air Conditioning, and Air Circulating Equipment
- Business type
- Facilities, janitorial & grounds (FedReady's grouping, from NAICS 561210)
- Versions
3 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0002Due Dec 14, 2026
- Nov 23, 2026 · Amendment 0001Due Dec 14, 2026
- Nov 19, 2026 · Solicitation (this version)Due Dec 14, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside