Solicitation
B422 Breakroom, B300 Bdoc
Department of Defense · Department of the Army
Small business set-aside · Mansfield, OH
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 18, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 13 of 25 attachments weren't read (Pre-Bid Conference-slides.pptx, Pre-Bid Conference minutes.pdf and 11 more). Check the attachments on SAM.gov.
Solicitation W50S8R27BA002 (sealed bid, called an invitation for bids or IFB): the 179th Cyberspace Wing, Ohio Air National Guard, wants a small business to renovate a second-floor breakroom in Building 422 and a Base Defense Operations Center (BDOC) room in Building 300 at Mansfield, Ohio. It is set aside 100% for small businesses and needs a bid bond with the bid. The response due date is December 10, 2026, 1:00 PM Eastern, on paper only, and the lowest-priced responsive bid wins.
Who can bid
- Small business only: the solicitation is set aside 100% for small businesses under NAICS 236220 (size standard $45,000,000 average annual revenue over three years) From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
- A bid bond (a guarantee from a surety company that you will sign the contract if you win) must be submitted with the bid From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
- Be registered in SAM.gov, the federal contractor database; the awardee, including a joint venture, must be registered
How to submit: Sealed paper bid, hand-delivered or sent by mail or carrier to 179th Cyberspace Wing, Attn: Gordon Strom, 1947 Harrington Memorial Rd., Mansfield, Ohio 44903. Fax and electronic bids are not accepted.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
- Serious: Small business set-aside. Only small businesses under the $45,000,000 average annual revenue size standard can bid; a joint venture must also meet the size standard. From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
- Serious: Bid bond required with the bid. You must get a bid bond on SF 24 from a surety before bid opening; a bid without a proper bond can be rejected. From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
- Worth checking: Paper bids only. Electronic and fax bids are not accepted, and a package that reaches the base after the bid opening time is marked late. From RFI and Response document (as of 18 Nov 26).pdf
Show all 7Show fewer
- Worth checking: The site visit was Nov 17, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
- Minor: Response due date moved to December 10, 2026. Amendment 01 changed the response due date from December 9, 2026 to December 10, 2026; SAM.gov and the amended solicitation now agree. From W50S8R27BA002 0001_Amendment 01.pdf
- Minor: Occupied building. Work is done while people use the buildings, so you must agree a work sequence, access and storage with the Contracting Officer first. From Attachment 01c_B422 Breakroom_Specifications.pdf
- Minor: Envelope marking uses a different IFB number. The envelope marking instruction gives W50S8R-26-B-A002, while the instructions elsewhere give W50S8R-27-B-A002; ask the contracting officer which to write on the envelope. From W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf
Read from the notice and 12 attachments. 13 of 25 not read. Show which files.
- RFI and Response document (as of 18 Nov 26).pdf (read)
- RFI and Response document (as of 13 Nov 26).pdf (read)
- W50S8R27BA002 0003_Amendment 03.pdf (read)
- W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf (read)
- W50S8R27BA002 0002_Amendment 02.pdf (read)
- W50S8R27BA002 0002_Amendment 02 (conformed copy).pdf (read)
- W50S8R27BA002 0001_Amendment 01.pdf (read)
- W50S8R27BA002 0001_Amendment 01 (conformed copy).pdf (read)
- W50S8R27BA002_B422 Breakroom and B300 BDOC.pdf (read)
- Attachment 01c_B422 Breakroom_Specifications.pdf (read)
- Attachment 02c_B300 BDOC_Specifications.pdf (read)
- Pre-Bid attendance.pdf (read)
- Pre-Bid Conference-slides.pptx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Pre-Bid Conference minutes.pdf: not summarized: open it on SAM.gov
- Attachment 02a_B300 BDOC_SOW.pdf: not summarized: open it on SAM.gov
- Attachment 01a_B422 Breakroom_SOW.pdf: not summarized: open it on SAM.gov
- RFI 02 response_attachment_B422 Breakroom 09 65 00.pdf: not summarized: open it on SAM.gov
- RFI 02 response_attachment_B300 BDOC 09 68 00.pdf: not summarized: open it on SAM.gov
- RFI 02 response_attachment_B422 Breakroom 09 51 00.pdf: not summarized: open it on SAM.gov
- RFI 02 response_attachment_B300 BDOC 09 65 00.pdf: not summarized: open it on SAM.gov
- Exhibit B_Checklist for Bid Bonds.pdf: not summarized: open it on SAM.gov
- Exhibit A_Sealed Bid Checklist_Reminders.pdf: not summarized: open it on SAM.gov
- Contractor Access form.pdf: not summarized: open it on SAM.gov
- Attachment 02b_B300 BDOC_Drawings.pdf: not summarized: open it on SAM.gov
- Attachment 01b_B422 Breakroom_Drawings.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Renovate the second-floor breakroom in Building 422 by expanding it (CLIN 0001, project PBXP272018), a CLIN being one priced line of the order
- Renovate the BDOC space inside Building 300 (CLIN 0002, project PBXP272019)
- Option CLIN 0003: lighting upgrades described in section 2.4 of the B300 BDOC statement of work, priced as an option
- Provide all tools, parts, labor, equipment, supervision and expertise for each project
- Supply flooring and ceiling products to the added specification sections (carpet tile 09 68 00, resilient flooring and cove base 09 65 00, acoustical ceilings 09 51 00)
- Coordinate any temporary water shutdowns for the B422 sink removal and replacement
- Provide closeout documents, including DD Form 1354 (the form that transfers renovated property to the Government), valued at 5% of the contract amount
- Attend a pre-construction conference with the Contracting Officer before work starts
- Contract type
- Sealed bid (IFB), firm-fixed-price (FFP: one set price, whatever the work ends up costing); CLIN 0003 is an option
- Place of performance
- 179th Cyberspace Wing, 1947 Harrington Memorial Rd., Mansfield, Ohio 44903 (Buildings 422 and 300)
- Estimated value
- Magnitude of construction is between $0.00 and $150,000.00 (a range given in the notice, not a price)
- How they'll choose
- Sealed bid: award to the responsible bidder with a conforming bid, based only on price and price-related factors
- Offers due
- December 10, 2026, 1:00 PM Eastern (from the version posted Nov 18, 2026; amended since)
- How to submit
- Sealed paper bid, hand-delivered or sent by mail or carrier to 179th Cyberspace Wing, Attn: Gordon Strom, 1947 Harrington Memorial Rd., Mansfield, Ohio 44903. Fax and electronic bids are not accepted.
What they'll judge offers on
- Price (all items must be priced)
What to include when you submit
- Send the Standard Form 1442 (SF 1442, the form you sign and return as your bid), front and back, signed by an official who can bind the company. One copy needs an original signature.
- Price every item in the Section 00 10 00 bid schedule.
- Include a bid bond on SF 24 with a Power of Attorney on the due date.
- Complete Section 00 45 00 (Representations and Certifications), returning only the additional certifications found there, and have current data in SAM.gov Online Representations and Certifications entered within the past year.
- Acknowledge every amendment to the solicitation.
- Mark the front of the envelope with the IFB number and the bidder's name and address. See block 13A of the SF 1442 for the number of copies.
- A joint venture must send an executed joint venture agreement, evidence that each partner's board approved it, and any SBA size determination for the joint venture.
- A bid that reaches the base after the bid opening time is marked late.
Not in the notice text
- The full statements of work, drawings, pre-bid conference minutes, base access form and the sealed bid and bid bond checklists are attached but not read, and the middle of the solicitation and specification files was left out. Check them on SAM.gov.
- The period of performance is not stated in the text read. Amendment 01 changed it, and the SF 1442 calendar day blanks are empty.
- Whether performance and payment bonds are required after award is not stated in the text read.
- Which wage rule applies (a Davis-Bacon wage determination, the federal pay rates for construction workers) is not stated in the text read.
- How many bid copies to send is not stated; see block 13A of the SF 1442.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Solicitation
- Office
- W7NU Uspfo Activity Ohang 179, Mansfield, OH
- Product/service code
- Z2QA · Repair or Alteration of Restoration of Real Property (Public or Private)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
7 versions have been posted, newest first.
- Nov 23, 2026 · AmendmentDue Dec 10, 2026
- Nov 18, 2026 · Amendment 0003 (this version)Due Dec 10, 2026
- Nov 17, 2026 · AmendmentDue Dec 10, 2026
- Nov 13, 2026 · AmendmentDue Dec 10, 2026
- Nov 12, 2026 · AmendmentDue Dec 10, 2026
- Nov 10, 2026 · SolicitationDue Dec 10, 2026 (changed)
- Nov 5, 2026 · PresolicitationDate Dec 8, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside