Solicitation
Solicitation S-280C/G Vehicle Mounted Shelter
Department of Defense · Department of the Army
AI summaryThe U.S. Army (Army Contracting Command - Detroit Arsenal) wants small businesses to propose on one five-year indefinite delivery/indefinite quantity (IDIQ: orders placed as needed) contract for S-280C/G Vehicle Mounted Shelters, tactical shelters that house electronic equipment. Prices are firm-fixed-price (FFP: one set price per unit); the minimum guarantee is $100,000.00 and the ceiling is $4,000,000.00. Proposals are due on the response due date of October 30, 2026 (an amendment moved it to Nov 13, 2026, 3:30 PM EST), 3:30 PM Eastern (Amendment 0002 moved it from October 9, 2026 (passed)). Building the shelters needs the export-controlled technical data package (TDP, the Government's drawings and specifications), which requires a DD Form 2345 certification. More in the summary
A newer version of this notice was posted Oct 29, 2026. It moves the due date from Oct 30, 2026 to Nov 13, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 13, 2026. The notice was amended Oct 29, 2026. The due date moved from Oct 30, 2026 to Nov 13, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 7 attachments weren't read (Attachment 0001_TDP_S-280 Shelters.zip). Check the attachments on SAM.gov.
The U.S. Army (Army Contracting Command - Detroit Arsenal) wants small businesses to propose on one five-year indefinite delivery/indefinite quantity (IDIQ: orders placed as needed) contract for S-280C/G Vehicle Mounted Shelters, tactical shelters that house electronic equipment. Prices are firm-fixed-price (FFP: one set price per unit); the minimum guarantee is $100,000.00 and the ceiling is $4,000,000.00. Proposals are due on the response due date of October 30, 2026 (passed), 3:30 PM Eastern (Amendment 0002 moved it from October 9, 2026 (passed)). Building the shelters needs the export-controlled technical data package (TDP, the Government's drawings and specifications), which requires a DD Form 2345 certification.
Who can bid
- Small business: the buy is a 100% small business set-aside under NAICS 332311 (size standard 750 employees)
- Registered in the System for Award Management (SAM) for NAICS 332311 before you submit a proposal
- A current DD Form 2345 (Militarily Critical Technical Data Agreement) certification on file, needed to get the export-controlled TDP through SAM.gov
How to submit: Email to Nicholas A. Lang, Contract Specialist (nicholas.a.lang.civ@army.mil), copying Daniel J. Gibson, Contracting Officer (daniel.j.gibson43.civ@army.mil), with the subject header: Proposal Submission W912CH-26-R-A096 (company name), due October 30, 2026, 3:30 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Small business set-aside. Only small businesses can win. The size standard for NAICS code 332311 (prefabricated metal building and component manufacturing) is 750 employees.
- Serious: Export-controlled drawings need a DD Form 2345 on file first. The TDP (drawings and specifications) is released only to firms with a DD Form 2345 certification, which takes time to get; the TDP zip is access-controlled on SAM.gov and was not read.
- Serious: All or none: offer on every item. An offer that leaves out any item or quantity is deemed nonresponsive, so you must price all four variants for all five ordering periods.
Show all 8Show fewer
- Worth checking: First article testing before production. You build 3 test shelters and the Government tests 2 of them; production units in ordering period 1 are due after the first article test (FAT) report is approved, and a waiver is not assured.
- Worth checking: Partial first article waiver: documents disagree. A note says partial waivers are not being considered, while paragraph L.5.1.4 says an offeror may request a waiver for only part of the test; ask the Contracting Officer.
- Worth checking: About a quarter of deliveries go overseas. Prices must cover delivery to any U.S. or overseas location, so shipping and export handling costs go into your fixed prices.
- Minor: Technical data must be destroyed after use. You and every subcontractor must destroy the export-controlled data and all copies when finished with it, and share it only with eligible parties.
- Minor: Offer validity: 120 days versus the form's 60-day default. Section A.2.3 requires proposals to stay valid at least 120 calendar days, while the offer form's block 12 says 60 calendar days unless a different period is inserted.
Read from the notice and 6 attachments. 1 of 7 not read. Show which files.
- Solicitation - W912CH26RA096.pdf (read)
- AMD 0002_W912CH26RA096.pdf (read)
- AMD 0001_W912CH26RA096.pdf (read)
- Attachment 0003 - S280C Technical PUBS SOW.pdf (read)
- Attachment 0004 - Provisioning SOW.pdf (read)
- Attachment 0002 - Additional Guidelines for CUI.pdf (read)
- Attachment 0001_TDP_S-280 Shelters.zip: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Manufacture and deliver four shelter variants to the Government's TDP and ASTM E1975-22: shielded and unshielded, each with or without a Mobilizer Adapter Kit (contract line item numbers, CLINs, 0021 to 0055)
- Estimated quantities by ordering period 1 to 5: shielded without kit 1, 3, 3, 3, 3 Each; unshielded without kit 1 Each in every period; shielded with kit 9, 3, 3, 3, 3 Each; unshielded with kit 1 Each in every period
- First article testing (FAT, tests on sample units before production): build 3 shielded test units, test 2 chosen by the Government, then deliver a First Article Test Report. CLIN 0011 is priced as 1 Lot
- Update and deliver the technical manual (TM 10-5411-207-13&P), a validation plan and report, provisioning data such as parts lists and a maintenance allocation chart, and logistics and packaging data (contract data requirements list items A001 to A016, CLIN 0061, 1 Lot, not separately priced)
- Deliver free on board (FOB) destination, meaning the seller pays delivery: about 75% to a U.S. destination (Sierra Army Depot, 74 Currant Street, Herlong, CA 96113, for planning) and about 25% outside the continental U.S. (for example Germany, Korea, Japan)
- Delivery times (Amendment 0001): FAT units no later than 240 calendar days after order; ordering period 1 production units 90 calendar days after the Government approves the FAT report or 120 calendar days after order, whichever is later; periods 2 to 5, 120 calendar days after order
- The contractor is not required to exceed 20 shelters per month unless the Contracting Officer agrees in writing to a higher rate
- After award: host a post award conference at the contractor's facility within 30 calendar days of award, and protect controlled unclassified information (CUI) under the Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012
- Contract type
- Single-award firm-fixed-price (FFP) indefinite delivery/indefinite quantity (IDIQ) contract; non-commercial requirement; best value tradeoff
- Period of performance
- Five one-year ordering periods starting at contract award (period 1 runs from award through 364 calendar days after; period 5 runs 1,460 through 1,824 calendar days after award)
- Place of performance
- SAM.gov lists USA. Deliveries are FOB destination, about 75% to a U.S. destination (Sierra Army Depot, Herlong, CA, for planning) and about 25% outside the continental U.S.
- Estimated value
- Minimum guarantee $100,000.00; maximum ceiling $4,000,000.00 for all delivery orders combined
- How they'll choose
- Best value tradeoff under FAR Part 15. Technical and price are of approximately equal importance. Delivery schedule is not scored. The Government intends to award without discussions but may hold them.
- Offers due
- October 30, 2026, 3:30 PM Eastern (from the version posted Oct 13, 2026; amended since)
- How to submit
- Email to Nicholas A. Lang, Contract Specialist (nicholas.a.lang.civ@army.mil), copying Daniel J. Gibson, Contracting Officer (daniel.j.gibson43.civ@army.mil), with the subject header: Proposal Submission W912CH-26-R-A096 (company name)
What they'll judge offers on
- Technical Factor: Subfactor 1, electromagnetic interference (EMI) shielding design (technical maturity, door seals, penetration treatments, validation data); Subfactor 2, manufacturing processes (assembly and welding methods, facility capacity). The two subfactors are equal weight
- Price Factor: total evaluated price (each CLIN unit price times its estimated quantity), checked for price reasonableness and unbalanced pricing
What to include when you submit
- Offer on the total quantity of all items; an offer for less than all items is treated as nonresponsive, and only one award will be made
- Acknowledge Amendment 0001 and Amendment 0002 before the response due date
- Fill in a unit price for every CLIN, including the separately priced first article CLIN 0011 (1 Lot)
- Include a brief price narrative: how you estimated the price, the major cost drivers and any relevant pricing history; certified cost or pricing data is not required
- Keep the proposal valid for at least 120 calendar days
- To ask for a first article waiver, send the First Article Waiver Worksheet (Section J) with supporting documents, such as an approved First Article Test Report, on company letterhead signed by a company agent
- To object to release of your unit prices under a Freedom of Information Act request, tell the Contracting Officer in writing before the response due date, with your reasons
After award, you must have
- Complete DoD Mandatory CUI training, sign a CUI non-disclosure agreement and handle CUI as DFARS 252.204-7012 requires From Attachment 0002 - Additional Guidelines for CUI.pdf:
…contractors supporting this contract who receive, store, or generate CUI are required to take the DoD Mandatory…
Current contractor
No incumbent is named. The notice says this establishes a new five-year contract built to a Government-owned technical data package.
Not in the notice text
- Part of the solicitation (the middle, covering sections D through L, including the contract clauses and the Section L proposal instructions) was left out of the text read, and the technical data package (Attachment 0001_TDP_S-280 Shelters.zip) is access-controlled on SAM.gov. Check both on SAM.gov before bidding.
- Proposal format, volumes and page limits are in Section L, which was not read.
- The Provisioning SOW (Attachment 0004 - Provisioning SOW.pdf) was only partly read.
- Whether a firm without TDP access by the response due date can still send a proposal isn't stated in the text read.
Eligibility and how to respond
- Set aside for small businesses: only a business that counts as small under this notice's NAICS code can bid as the prime contractor. The notice also names requirements: More open small business set-asides under NAICS 332311
- The notice mentions export-controlled data. You may need a Joint Certification Program (DD Form 2345) approval to see the drawings.
- How to submit, from the AI summary: Email to Nicholas A. Lang, Contract Specialist (nicholas.a.lang.civ@army.mil), copying Daniel J. Gibson, Contracting Officer (daniel.j.gibson43.civ@army.mil), with the subject header: Proposal Submission W912CH-26-R-A096 (company name). Check it in the notice before you send anything.
Notice details
- Posted
- Oct 13, 2026
- Notice type
- Solicitation
- Office
- W6QK ACC- DTA, Warren, MI
- Product/service code
- 5411 · Rigid Wall Shelters
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 332311)
- Versions
5 versions have been posted, newest first.
- Oct 29, 2026 · Amendment 0004Due Nov 13, 2026 (changed)
- Oct 20, 2026 · Amendment 0003Due Oct 30, 2026
- Oct 13, 2026 · Amendment 0002 (this version)Due Oct 30, 2026 (changed)
- Sep 10, 2026 · Amendment 0001Due Oct 9, 2026
- Sep 8, 2026 · SolicitationDue Oct 9, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside