Solicitation
Fort Eustis Dredge Material Management Area (FEDMMA)
Department of Defense · Department of the Army
Small business set-aside · Fort Eustis, VA
A newer version of this notice was posted Nov 18, 2026. It moves the due date from Oct 6, 2026 to Jan 12, 2027, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. The notice looks incomplete: Only the text of Amendment 0007 was available; the full solicitation (SF 1442, specifications, Attachment 3 Bid Schedule and drawings) is not in the text read. Check the attachments on SAM.gov.
Solicitation W9123626BA008: the Army Corps of Engineers, Norfolk District, is taking sealed bids (an invitation for bids) from small businesses only to raise and regrade disposal site berms at the Fort Eustis Dredge Material Management Area in Virginia. The work is design-bid-build construction, with the Government's cost range at $5,000,000 to $10,000,000. Bids are due January 12, 2027, 2:00 PM Eastern in PIEE (the Government's electronic bid system); the public bid opening is January 13, 2027, 10:00 AM Eastern. Amendment 0007 moved both dates.
Who can bid (6)
- Small business set-aside: only small businesses can bid, and must represent in SAM.gov that they are small under NAICS 237990 From Solicitation Amendment W9123626BA008_0007.pdf
- Bid guarantee (bid bond) with the bid, per RFO clause 52.228-1; the percentage is not given in the text read From Solicitation Amendment W9123626BA008_0007.pdf
- Prime contract experience on a military installation or Corps of Engineers construction contract in the continental United States, completed since June 18, 2016, worth at least $1 million From Solicitation Amendment W9123626BA008_0007.pdf
Show all 6Show fewer
- Prime contract experience in marshy or wet environments in the continental United States, completed since June 18, 2016, worth at least $1 million From Solicitation Amendment W9123626BA008_0007.pdf
- Federal construction contract that moved, placed and compacted more than 6000 cubic yards of fill, worth at least $1,000,000, completed since June 18, 2016 (prime or subcontractor) From Solicitation Amendment W9123626BA008_0007.pdf
- Current SAM.gov registration with a CAGE code listed in Block 14 of the SF 1442 From Solicitation Amendment W9123626BA008_0007.pdf
How to submit: Electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/; no mail, hand-carry or courier bids. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 18, 2026.
- Serious: Small business set-aside. Only small businesses can bid, and the Government checks small business status in SAM.gov under NAICS 237990. From Solicitation Amendment W9123626BA008_0007.pdf
- Serious: Bid guarantee required with the bid. You need a surety to issue a bid bond before the bid is due, and a sealed physical copy is due within 72 hours if you are the apparent low bidder. From Solicitation Amendment W9123626BA008_0007.pdf
- Serious: Required past work for the low bidder. The low bidder must show three kinds of past construction work, each worth at least $1 million, or lose the award. These do not affect whether the bid is responsive. From Solicitation Amendment W9123626BA008_0007.pdf
Show all 8Show fewer
- Serious: Electronic bids only through PIEE. Bids by mail, hand-carry or courier are not accepted, and a late or failed upload can make the bid late. From Solicitation Amendment W9123626BA008_0007.pdf
- Serious: Every CLIN must be priced. A bid that leaves a line blank is not responsive; show a zero as $0.00. Materially unbalanced bids may be rejected. From Solicitation Amendment W9123626BA008_0007.pdf
- Worth checking: Question system is closed. Bidders cannot ask new questions in ProjNet, so unclear points in the specifications cannot be raised there. From Solicitation Amendment W9123626BA008_0007.pdf
- Minor: Site visit is invited; details are in another section. The notice invites bidders to visit the site; the text read does not say the visit is required or give its date. From Solicitation Amendment W9123626BA008_0007.pdf
- Minor: Pre-award safety conference possible. The low bidder may be asked to meet the contracting officer about past accidents or safety compliance before award. From Solicitation Amendment W9123626BA008_0007.pdf
Read from the notice and 1 attachment. Show which files.
- Solicitation Amendment W9123626BA008_0007.pdf (read)
Full summary
What they want
- Regrade and raise the disposal site berms to an elevation of 36 ft; they are now at 34 ft and have settled below 34 ft in a few places
- Relocate two existing spill boxes 50 to 60 feet into the disposal site
- Regrade the existing dirt and stone access ramp to meet the new top-of-berm elevation
- Contract type
- Planned firm-fixed-price, design-bid-build construction contract awarded by sealed bid (invitation for bids); single award
- Place of performance
- Fort Eustis, VA, USA (the notice says the Dredge Material Management Area is located at JBLE - Eustis)
- Estimated value
- Magnitude of construction cost between $5,000,000 and $10,000,000 (the Government's range)
- How they'll choose
- Lowest responsive bid from a responsible bidder: single award on the lowest total bid price, which is the sum of contract line item numbers (CLINs, the priced lines) 0001 through 0005
- Offers due
- January 12, 2027, 2:00 PM Eastern
- How to submit
- Electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/; no mail, hand-carry or courier bids
- Page limits
- Definitive responsibility criteria narrative (requested from the apparent low bidder after bid opening): 5 single-sided pages
What they'll judge offers on
- Price: total bid price, the sum of CLINs 0001 through 0005
- Responsibility: the apparent low bidder must show financial resources, a satisfactory record, equipment and the experience described in the definitive responsibility criteria
What to include when you submit
- Submit a filled-in and signed Standard Form 1442 (SF 1442, the solicitation and offer form), pages 1 and 2, with your CAGE code in Block 14
- Submit signed SF 30s acknowledging every amendment, and a signed bid letter that includes the SF 1442 and SF 30 acknowledgment of all amendments
- Fill in the Attachment 3 Bid Schedule: every CLIN must be priced, write $0.00 for a zero, and round unit prices and net amounts to the nearest whole dollar
- Include the bid guarantee (a bid bond signed by the bidder and its surety) in the attachment labeled "Bid.26BA2008_Bidder Name"; a physical copy with a raised seal is due within 72 hours if the Government asks the apparent low bidder
- Include a copy of the joint venture agreement, if you bid as a joint venture, and evidence of authority to sign if the signer is not a corporate officer, partner or owner
- Responsibility documents are optional but highly recommended with the bid: a signed bank reference, three years of financial statements, and all pages of Section 00 45 00 Representations and Certifications
- Definitive responsibility criteria, requested from the apparent low bidder within 3 business days: at least one prime construction contract on a military installation or for the Corps of Engineers in the continental United States, completed on or after June 18, 2016
- Also at least one prime contract with work in marshy or wet environments in the continental United States, completed on or after June 18, 2016
- Also at least one prime or subcontract federal construction contract that moved, placed and compacted more than 6000 cubic yards of fill, worth at least $1,000,000, completed on or after June 18, 2016
- Subcontractor experience counts for the fill criterion only, with a letter of commitment from the subcontractor
- Send narrative parts as searchable PDF files compatible with Adobe Acrobat Reader 11 and Microsoft Office 2016, with no embedded sound or video and no personal data in the file description
- The PIEE user's email address must match the one on file in SAM.gov, and the Proposal Manager role is needed to submit
Not in the notice text
- Only the text of Amendment 0007 was available; the full solicitation (SF 1442, specifications, Attachment 3 Bid Schedule and drawings) is not in the text read
- The performance period and the required completion time are not given
- Whether the site visit is required, and its date, are in the Instructions section "SITE VISIT (CONSTRUCTION)", which is not in the text read
- Which wage rule applies, such as a Davis-Bacon wage determination, is not stated in the text read
- The bid guarantee amount or percentage, and any performance and payment bond requirements, are not stated in the text read
Notice details
Notice type, codes, versions and files
- Posted
- Sep 9, 2026
- Notice type
- Solicitation
- Office
- W2SD ENDIST Norfolk, VA
- Product/service code
- Z2KF · Repair or Alteration of Dredging Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
9 versions have been posted, newest first.
- Nov 18, 2026 · AmendmentDue Jan 12, 2027 (changed)
- Sep 23, 2026 · AmendmentDue Dec 1, 2026 (changed)
- Sep 9, 2026 · Amendment 0007 (this version)Due Oct 6, 2026 (changed)
- Aug 11, 2026 · AmendmentDue Sep 15, 2026 (changed)
- Jul 27, 2026 · AmendmentDue Aug 18, 2026 (changed)
- Jul 17, 2026 · AmendmentDue Jul 23, 2026 (changed)
- Jul 2, 2026 · AmendmentDue Aug 4, 2026 (changed)
- Jun 18, 2026 · AmendmentDue Jul 23, 2026
- Jun 18, 2026 · SolicitationDue Jul 23, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Latest amendment note (Amendment 7) from SAM.gov
Similar open opportunities
- Fort Eustis Dredge Material Management Area Construction in Newport News, VirginiaThe Army Corps of Engineers Norfolk District is gathering information on companies that could build maintenance work at the Fort Eustis Dredge Material Management Area in Virginia.
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 2-2025 (OM25276)The Army Corps of Engineers New Orleans District plans to solicit a fully crewed cutterhead dredge to do maintenance dredging in the Mississippi River Southwest Pass.
- Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 3-2025, Cameron Parish, Louisiana. Specification Nos. OM25127The Army Corps of Engineers New Orleans District plans an unrestricted sealed-bid contract for one fully crewed hopper dredge to remove shoal material from the Calcasieu River…
- Calcasieu River and Pass, Bar Channel Hopper Dredge Rental Contract No. 4-2025, Cameron Parish, Louisiana. Specification Nos. OM25128The U.S. Army Corps of Engineers, New Orleans District, wants to rent one fully crewed self-propelled hopper dredge (a ship that sucks up and carries away sand and silt) to clear…
- Calcasieu River and Pass, Bar Channel Hopper Dredge Rental Contract No. 2-2025, Cameron Parish, Louisiana. Specification Nos. OM25126The U.S. Army Corps of Engineers, New Orleans District wants to rent one fully crewed hopper dredge (a self-propelled ship that sucks up sand and silt and carries it away) to…