Combined Synopsis/Solicitation
Fiber Rope Assembly, Single Leg
Department of Defense · Defense Logistics Agency
AI summary Beta
The notice looks incomplete: Part of the SF 1449 text (about 155,860 characters, mostly clauses in the middle) was left out of what was read, and the solicitation itself, the technical data package drawings and DLA's master list of technical and quality requirements (R and I numbers) are on DIBBS and DLA's website; key requirements may be there. Check the attachments on SAM.gov.
DLA Troop Support (part of the Defense Logistics Agency) wants fiber rope assemblies, single leg, national stock number (NSN) 4020-00-881-8736, under solicitation SPE8EE27R0003, as an unrestricted buy. Contract line item number (CLIN) 0001 is QTY 900 EA, and the response due date is December 20, 2026, 3:00 PM Eastern. The notice text says the request for proposals will be posted on DLA's bid board (DIBBS) after that date, while the attached Standard Form 1449 (SF 1449) uses December 20, 2026 as the offer due date. The firm-fixed-price, indefinite-delivery/indefinite-quantity (IDIQ) contract runs one base year plus four option years, and the winner must pass first article testing (FAT) before production.
Who can bid (4)
- Open to all businesses: the buy is unrestricted (full and open competition), with no set-aside From SF1449_SPE8EE27R0003.PDF
- Cybersecurity Maturity Model Certification (CMMC) Level 2 self-assessment, and handling of covered defense information From SF1449_SPE8EE27R0003.PDF
- Active System for Award Management (SAM.gov) registration From SF1449_SPE8EE27R0003.PDF
Show all 4Show fewer
- Past performance is an evaluation factor From SF1449_SPE8EE27R0003.PDF
How to submit: Email to Kyle.Barner@dla.mil; proposed unit prices are also entered in DIBBS. Fax, hand-carried and mailed offers are not accepted. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 19, 2026.
- Serious: First article test first, then production, with 821 days to deliver. Two sample assemblies are tested before production, the government has up to 90 days to approve or disapprove, and buying materials before approval is at your own risk. From SF1449_SPE8EE27R0003.PDF
- Serious: Production before first article approval is at the contractor's risk. Materials bought or production started before approval cannot be billed through progress payments or termination settlements, and a disapproved sample means more tests at your cost. From SF1449_SPE8EE27R0003.PDF
- Worth checking: First article quantity conflict: 1 EA or 2. The schedule line for CLIN 0002 shows 1.000 EA, but the first article remarks and clause 52.209-4 say 2 units; pricing is per unit, so ask which is right. From SF1449_SPE8EE27R0003.PDF
Show all 8Show fewer
- Worth checking: Drawings come only with the open solicitation, and covered defense information applies. The technical data package drawings are available from DLA only while the solicitation is open, and the solicitation says covered defense information applies, so you may need to meet handling rules before you can price. From SF1449_SPE8EE27R0003.PDF
- Worth checking: Cybersecurity Maturity Model Certification Level 2 self-assessment listed. A Level 2 self-assessment is listed as a requirement; a business without a current assessment may need time to complete one. From SF1449_SPE8EE27R0003.PDF
- Worth checking: Quantities are estimates, not guaranteed. The order quantities are only an annual estimate, so volume and revenue are not guaranteed beyond the contract minimum, which this text does not state. From SF1449_SPE8EE27R0003.PDF
- Minor: Option-year pricing follows a price index with a blank cap. Option-year prices adjust with a government price index (Producer Price Index for cordage, rope and twine), and the percentage ceiling in the posted text is blank. From SF1449_SPE8EE27R0003.PDF
- Minor: Email offers only. Offers must be emailed and unit prices entered in DIBBS; fax, hand-carried and mailed offers are rejected. From SF1449_SPE8EE27R0003.PDF
Read from the notice and 1 attachment. Show which files.
- SF1449_SPE8EE27R0003.PDF (read)
Full summary
What they want
- CLIN 0001: Fiber Rope Assembly, Single Leg, NSN 4020-00-881-8736, QTY 900 EA (the solicitation calls this an annual estimated quantity, not a guarantee)
- CLIN 0002: first article test units. The schedule line shows QTY 1.000 EA, but the first article remarks and clause 52.209-4 say 2 units, so the quantity is unclear (1 EA in the schedule, 2 each in the remarks)
- Pass Government first article testing before regular production; two preproduction sample assemblies are tested, and the test units are expected to be destroyed in testing
- Production lot testing (PLT): required for the production quantity
- Deliver 821 days after date of order (ADO) with first article testing, or 536 days ADO if the first article requirement is waived
- Ship FOB origin (the buyer takes over at your plant), with inspection and acceptance at origin, to DLA depot stock in the continental U.S. only
- Keep material certification records for the material used in the end item
- Follow the technical data package drawings and military packaging and marking standards (MIL-STD-2073-1E, MIL-STD-129, MIL-STD-130N)
- Contract type
- Firm-fixed-price with economic price adjustment (EPA) for option years, indefinite-delivery/indefinite-quantity (IDIQ) long-term contract; single award intended
- Period of performance
- 1 base year + 4 one-year options (5 years total); delivery 821 days after date of order including first article testing
- Place of performance
- Philadelphia, PA, USA as listed on SAM.gov; the form asks each bidder to give its own place of performance. Material is DLA Direct (depot stock), continental U.S. only
- Estimated value
- Government's estimate: $450,000.00 per year and $2,250,000.00 over five years; maximum that may be ordered is $5,000,000.00
- How they'll choose
- Lowest price technically acceptable: award goes to the responsible bidder with the lowest price that meets the acceptability standards
- Offers due
- December 20, 2026, 3:00 PM Eastern
- How to submit
- Email to Kyle.Barner@dla.mil; proposed unit prices are also entered in DIBBS. Fax, hand-carried and mailed offers are not accepted
What they'll judge offers on
- Price (lowest price among acceptable offers wins; the total award price includes the first article line when it is not waived)
- Technical acceptability
- Past performance
What to include when you submit
- Send a signed and dated proposal with every page of the solicitation completed, including pricing in the schedule of supplies
- Enter unit prices in DIBBS and also email them to the two DLA contacts named in the solicitation
- Price CLIN 0001 for 900 each and CLIN 0002 (first article) for 2 each; the schedule line for CLIN 0002 shows 1.000 EA, so confirm with the contracting officer
- Include completed copies of FAR 52.212-3 (representations and certifications)
- Include Standard Form LLL (disclosure of lobbying activities) because the purchase exceeds $200,000
- Large businesses must submit a subcontracting plan
- Proposals must stay valid for 120 days after the solicitation close date
- Give your place of performance (name, CAGE code, address) and your remittance address
- An alternative offer needs a technical data package, and the solicitation says an alternative offer will not be considered for this award
After award, you must have
- Pass Government first article testing before further production From SF1449_SPE8EE27R0003.PDF:
Government First Article Testing (FAT) is required.
- Material certification records for the material used in the end item From SF1449_SPE8EE27R0003.PDF:
…a. Material certification shall be required.
Not in the notice text
- Part of the SF 1449 text (about 155,860 characters, mostly clauses in the middle) was left out of what was read, and the solicitation itself, the technical data package drawings and DLA's master list of technical and quality requirements (R and I numbers) are on DIBBS and DLA's website; key requirements may be there.
- The guaranteed minimum order value is referred to as stated below, but the posted text does not give it.
- The delivery schedule is referred to as shown below, but the posted text gives only the 821-day (with first article testing) and 536-day (if waived) figures.
- Which CLIN 0002 quantity is right: 1 EA in the schedule or 2 each in the first article remarks.
- What the CMMC Level 2 self-assessment and covered defense information handling require of a bidder before pricing.
- The percentage ceiling on option-year price increases is blank in the posted text.
- Whether the first article requirement may be waived for a bidder is decided by the contracting officer during evaluation.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- DLA Troop Support, Philadelphia, PA
- Product/service code
- 4020 · Fiber Rope, Cordage, and Twine
- Business type
- Clothing & textiles (FedReady's grouping, from NAICS 314994)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation