Solicitation
CGR Interior Painting and Repairs
Department of State
AI summary Beta
Solicitation 19M03027Q0004: the U.S. Consulate General in Casablanca, Morocco wants interior painting, plaster and surface repairs, and wood and metal restoration at the Consul General's residence (Villa Mirador), finished within 60 calendar days of a notice to proceed. No set-aside is used; one firm-fixed-price (FFP: one set price, whatever the work costs) purchase order goes to the lowest-priced quote that passes a pass/fail technical check. A site visit on November 30 or December 2, 2026 is mandatory, with registration due November 24, 2026 (passed). The response due date is December 7, 2026, 16:00 Casablanca local time.
Who can bid (7)
- Registered, licensed construction company in good standing under Moroccan law From SOW CGR Maintenace Repair.docx
- A business with a permanent address and telephone listing in Morocco, or a plan to open an office there within 30 days of award From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Attend the mandatory site visit (November 30 or December 2, 2026) after registering by November 24, 2026 From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
Show all 7Show fewer
- Proof of SAM.gov registration, including the Unique Entity Identifier From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- At least two projects in the past five years in painting, plaster or surface repair, or wood or metal finish restoration From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Full-time on-site supervisor who speaks English, treated as key personnel From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Bank letter, two years of financial statements and proof of working capital, from the apparent successful quoter only, within 5 business days of request From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
How to submit: Email in English to CasablancaProc@state.gov, then send a separate email saying it was sent; the Consulate's acknowledgment confirms receipt. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Nov 17, 2026.
- Serious: Mandatory site visit in Casablanca on November 30 or December 2, 2026. Quotes from firms that did not attend are not evaluated, so you must be in Casablanca on one of the two dates. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Serious: The site visit was Nov 24, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Serious: Moroccan company license and local office. The work is outside the United States: you need to be a registered, licensed Moroccan construction company, with a Morocco office now or within 30 days of award, and must follow local labor laws, permits and insurance rules. From SOW CGR Maintenace Repair.docx
Show all 9Show fewer
- Serious: Heritage entry door plan can fail the whole quote. The two-page plan for the main entry door and grating must cover all six listed elements, or the quote is rated unacceptable. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Worth checking: Past work required: two projects in five years. You need two finished painting, plaster or finish restoration projects with reachable references and photos, or the quote is technically unacceptable. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Worth checking: Working hours differ between documents. The RFQ sets Monday to Friday, 8:00 a.m. to 5:00 p.m., while the statement of work sets 08:00 to 11:30 and 13:30 to 17:00 and allows after-hours, night and weekend work at no extra cost. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Worth checking: Late finish costs $200 a day. Work must finish within 60 calendar days of the notice to proceed, which comes only after insurance and the worker list are accepted, and delay brings liquidated damages (daily penalty). From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Worth checking: Value added tax shown separately but may count in the evaluated price. Section A totals price without VAT, yet the evaluation says it includes separately shown VAT; prices must be in U.S. dollars and VAT must be its own invoice line. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
- Worth checking: Working capital proof wording is inconsistent. The winning quoter must show cash or credit for the first stretch of work without Government payment; the text says thirty (15) days and equates 30 days with 25% of the price, so ask which applies. From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf
Read from the notice and 4 attachments. Show which files.
- 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf (read)
- SF18.pdf (read)
- SOW CGR Maintenace Repair.docx (read)
- Appendix 1 - Architectural Plans 1 (1).pdf (read)
Full summary
What they want
- Protect floors, fixtures and furnishings, and patch and repair walls, ceilings and cracks: SM 200 of patching, SM 3500 of sanding and spot priming
- Prime, seal and paint two coats on all interior walls and ceilings: SM 3500 each step
- Wood work: replace rotted wood and refinish 32 EA exterior wood items and 32 EA window frames, 18 EA terrace and balcony doors, repaint 63 EA interior doors, varnish SM 70, install 5 EA access panels
- Metal repair, sandblasting off site and repainting of 19 EA metal items; restore the heritage main entry metal door and grating (1 EA) under a restoration plan
- Repair or replace 21 EA first-floor roll-down shutters, with new motors and a one-year warranty on new parts
- Scaffolding for exterior work (SM 250), weekly debris removal and final cleaning
- Get materials, samples and data sheets approved by the contracting officer's representative (COR: the Government's on-site inspector) before ordering
- Provide an English-speaking supervisor on site at all times
- Contract type
- Firm-fixed-price (FFP) purchase order for construction
- Period of performance
- Start within 7 calendar days of the notice to proceed; finish within 60 calendar days after the notice to proceed
- Place of performance
- Villa Mirador, the Consul General's residence, Anfa, Casablanca 20250, Morocco
- Estimated value
- Between $100,000 and $250,000 (the solicitation's anticipated price range)
- How they'll choose
- Lowest price technically acceptable: the lowest-priced quote that passes the pass/fail technical review and a responsibility check wins; no discussions
- Offers due
- December 7, 2026, 16:00 Casablanca local time (SAM.gov lists 4:00 PM UTC)
- How to submit
- Email in English to CasablancaProc@state.gov, then send a separate email saying it was sent; the Consulate's acknowledgment confirms receipt
- Page limits
- Heritage entry door restoration plan: 2 pages. Total submission: 30 MB or less per email, in Word, Excel or PDF
What they'll judge offers on
- Price: total firm-fixed price in Section A, including any separately shown value added tax (VAT: Moroccan sales tax)
- Technical acceptability (pass/fail): site visit attendance, performance schedule (bar chart showing completion within 60 days), business management and technical proposal, relevant experience and past performance, compliance with solicitation requirements, heritage entry door restoration plan
- Responsibility check before award: financial capability, schedule, local licensing, permits and insurance
What to include when you submit
- Volume I: Standard Form 18 (SF-18: the request for quotation form you sign and return), completed and signed, with the Section A pricing and the breakdown of price by divisions of specifications
- Volume I also needs a Measurement Verification Sheet listing, for each Section A line, the Government's quantity, your field-verified quantity and any difference
- Volume II: a bar-chart performance schedule and a business management and technical proposal listing owners, partners and principal officers; the name and address of your field superintendent; and subcontractors and principal suppliers with the work each will do
- Volume II: the heritage entry door restoration plan covering on-site or off-site restoration and protection, surface preparation, metal and welding repair, primer and finish system, who does the work, and sequencing
- Volume III: list contracts held over the past five years for the same or similar work, with at least two projects finished in the past five years in painting, plaster or surface repair, or wood or metal finish restoration, and at least one in an occupied residence, hotel, office or historic building
- For each project give the customer contact, contract number and type, award and completion dates and place, dollar value, a description of your role, 3 to 6 labeled photos, a reference contact (name, title, phone, email) and any default termination or litigation in the last five years
- Include the Unique Entity Identifier (UEI) and SAM registration proof, the Section L representations and certifications, and any exceptions to the solicitation
- Name the person who attended the site visit for your firm
- Show prices in U.S. dollars, with VAT as a separate line
After award, you must have
- General liability insurance of $50,000 per occurrence and $100,000 cumulative for bodily injury and for property damage, plus any insurance local law requires; proof is needed before the notice to proceed From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf:
…at its own expense provide and maintain during the entire performance period the following…
- List of workers and supervisors for security checks, due 10 calendar days after award From 19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf:
After award, the Contractor has ten calendar days to submit to the Contracting Officer a…
Not in the notice text
- The question deadline is referred to as C.1(d) but no date is given.
- The statement of work refers to a Contractor Safety Policy as Appendix 1, but the Appendix 1 file holds architectural plans.
- The breakdown of price form is Attachment 3 in the attachment list and Attachment 4 in Section J, and is not among the files in this text.
More to check before you bid
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- American Consulate Casablanca
- Product/service code
- Y1FA · Construction of Family Housing Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 23611)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- AFHC Repair Quarters 82 and 86, Camp Zama, JapanThe Department of the Army (W2SN ENDIST JAPAN, its engineer district in Japan) is buying repairs to nine 3-bedroom or 4-bedroom family housing units in buildings 82 and 86 at…
- Renovate Military Family Housing Tower 4511, Camp CourtneyThe Army Corps of Engineers Japan District wants a contractor to renovate Military Family Housing Tower 4511 at Camp Courtney, Okinawa, Japan (invitation for bid W912HV26BA009).
- iHouse Apartment ConstructionOnly Indian Small Business Economic Enterprises (ISBEEs: small businesses that meet the Indian Economic Enterprise definition in the federal health rules) can bid on solicitation…
- GAOA Powell Duplex Improvements, Nez Perce - Clearwater National ForestThe Forest Service wants a small business to replace the roof and water-damaged structural insulated panels (SIP) and some roof and wall framing on a residential duplex in the…
- Loxahatchee NWR Multi-Container Quarters ProjectOnly small businesses can bid: the U.S. Fish and Wildlife Service (FWS) plans to buy one multi-container living quarters building at Loxahatchee National Wildlife Refuge (NWR),…