Solicitation
Facility 30011 - Facility Signage Update
Department of Defense · Department of the Air Force
Small business set-aside · Wright Patterson AFB, OH
AI summary Beta
This summary may miss requirements: 1 of 7 attachments weren't read (Atch 4 Project Finishes List.pdf). Check the attachments on SAM.gov.
The Air Force (AFLCMC, Wright-Patterson Air Force Base) wants a small business to remove old signs and supply and install new modular signs in Facility 30011, Ohio. Only small businesses can quote. The response due date is December 4, 2026, 4:00 PM Eastern. This request for quote (RFQ: the buyer asks for prices) goes to the lowest-priced quote that passes the technical check, and work must finish within 120 days of award.
Who can bid (5)
- Small business set-aside under NAICS 339950 (size standard 500 employees): the prime must qualify as a small business From Quest_Answ.pdf
- Active SAM registration at quote submission and at award, kept current through final payment
- Cybersecurity Maturity Model Certification (CMMC) Level 1 (a self-check of 15 basic safeguards, entered in the Supplier Performance Risk System) complete before award; the CMMC UID goes on the Required Information Sheet From Quest_Answ.pdf
Show all 5Show fewer
- Prime must be the authorized dealer of the proposed sign manufacturer; a project-specific letter from the manufacturer is acceptable From SOW - F30011 Facility Signage Update -rv1 .pdf
- Project Manager with at least 3 years of experience installing the company's product; resumes on request From SOW - F30011 Facility Signage Update -rv1 .pdf
How to submit: Email to the Contract Specialist (christopher.hall.113@us.af.mil) and the Contracting Officer (jessica.stamper.2@us.af.mil), subject line "FA860127Q0018, Facility 30011 – Facility Signage Update". What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 24, 2026.
- Serious: Small business set-aside only. Only businesses that are small under NAICS 339950 (500 employees) can quote; larger firms cannot.
- Serious: CMMC Level 1 must be complete before award. Not needed when you quote, but a firm without it done is dropped from award; the CMMC UID also goes on the Required Information Sheet. From Quest_Answ.pdf
- Worth checking: Renderings and price breakdown due with the quote. You must produce 3D colored renderings of each sign type before award, which adds design work and cost to bid. From Quest_Answ.pdf
Show all 8Show fewer
- Worth checking: No floor plans or site visit before award. Plans and the signage schedule come after award and the site visit is after award, so you price from the sign list alone and carry the risk. From SOW - F30011 Facility Signage Update -rv1 .pdf
- Worth checking: 120-day completion includes lead time. The 120 days run from award and cover the site visit, finish selection, product lead time and installation. From SOW - F30011 Facility Signage Update -rv1 .pdf
- Worth checking: Dealer authorization and certified installer. You must be the manufacturer's authorized dealer (a project letter is accepted) and a manufacturer-certified installer must oversee the install. From SOW - F30011 Facility Signage Update -rv1 .pdf
- Worth checking: Buy American rules apply to the signs. You must state the country of manufacture for each sign product at quote time, and foreign-made signs may not qualify. From Quest_Answ.pdf
- Minor: Base access and background checks for workers. Every worker and driver needs a REAL ID-compliant ID, a background check and a visitor pass, and non-US citizens need separate clearance from the base. From Quest_Answ.pdf
Read from the notice and 6 attachments. 1 of 7 not read. Show which files.
- Solicitation Amendment FA860127Q00180001 SF 30.pdf (read)
- Solicitation FA8601Q0018.pdf (read)
- SOW - F30011 Facility Signage Update -rv1 .pdf (read)
- Quest_Answ.pdf (read)
- Atch 3 Clin Structure.pdf (read)
- Atch 5 Required Info.pdf (read)
- Atch 4 Project Finishes List.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Supply and install new modular wall signs (2/90 Sign System slide-insert style, or an equal) with raised tactile letters and Grade 2 Braille
- Sign types and quantities: room ID signs (QTY 44 and QTY 17), conference room (QTY 6), restroom (QTY 8), staircase ID (QTY 10), exit (QTY 5), level indicator (QTY 10), directory (QTY 1), shelter in place (QTY 4), notice holders (QTY 3 and QTY 12)
- Design services (CLIN 0012, 1 Unit): 3D colored renderings of each sign type and a final install drawing
- Remove existing signs one for one, patch and touch up paint where needed, then install (CLIN 0013, 1 Unit)
- Meet the Interior Design Specialist and end user after award to finalize finishes
- Provide up to 30 days of storage, a project manager, and a manufacturer warranty on parts and labor
- Finish everything no later than 120 days after award
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work costs) purchase order, 13 contract line item numbers (CLINs: priced lines of the order)
- Period of performance
- To be completed no later than 120 days from contract award, including the post-award site visit, finish selection, product lead time and installation
- Place of performance
- Building 11, Area A, 5151 Wright Ave, Wright-Patterson Air Force Base, Ohio (Facility 30011)
- Estimated value
- Not stated
- How they'll choose
- Lowest-price technically acceptable (LPTA): quotes are passed or failed on technical points, then the lowest-priced acceptable quote wins; no tradeoff
- Offers due
- December 4, 2026, 4:00 PM Eastern
- How to submit
- Email to the Contract Specialist (christopher.hall.113@us.af.mil) and the Contracting Officer (jessica.stamper.2@us.af.mil), subject line "FA860127Q0018, Facility 30011 – Facility Signage Update"
What they'll judge offers on
- Technical acceptability (pass/fail): complete pricing schedule, completed Required Information Sheet, manufacturer and part number for each sign type, product literature and cutsheets, proof for any 'or equal' product, statement that prices cover all work, completion date within 120 calendar days of award, warranty statement
- Price: total of all CLINs, checked for completeness, math accuracy and reasonableness; lowest evaluated price among acceptable quotes
What to include when you submit
- Send the whole quote in one email under 5 megabytes; no zip or compressed files; only .pdf, .doc, .docx, .xls or .xlsx attachments
- If you need a DoDSafe drop off, tell the contract specialist or contracting officer at least 48 hours before quotes are due
- Price every CLIN (0001 to 0013) with unit and extended prices in whole dollars on the CLIN structure sheet
- Complete and return the Required Information Sheet: country of origin, payment terms, delivery date, company name, UEI, CAGE, CMMC unique identifier (UID), contact and warranty information
- Give the manufacturer and part number for each sign type, plus product literature and cutsheets showing the sizes, materials, finishes, colors, tactile characters, Braille, inserts and mounting
- For any 'or equal' product, show it meets or exceeds all stated characteristics; if proposing a printed (additive-manufactured) sign, also provide the insert changeable tile
- Include 3D colored renderings of each typical sign and a price breakdown with the quote
- State the country of manufacture for each proposed sign product (Buy American, DFARS 252.225-7001)
- Include a statement that prices cover all supervision, labor, materials, equipment, field verification, fabrication, delivery, removal and disposal of old signs, patching, painting, hardware, installation, cleanup and warranty
- State a completion date not later than 120 calendar days after award and a warranty statement; give proof of the manufacturer warranty (a project-specific dealer letter is acceptable)
- Hold prices firm for 60 calendar days from the date offers are due
- Acknowledge Amendment 0001 (due date changed to December 4, 2026)
After award, you must have
- Installation under the oversight of an onsite manufacturer-certified installer From SOW - F30011 Facility Signage Update -rv1 .pdf:
Installation of specified product must be under the oversight of an onsite…
- Basic background check and REAL ID-compliant ID for anyone coming on base From Quest_Answ.pdf:
Yes, a basic background check for anyone coming on base.
Not in the notice text
- Attached but not read: Atch 4 Project Finishes List.pdf (a scanned PDF with no text); the finishes, colors and cutsheet details in it are not in this brief.
- Q&A 16 says CLIN 0011 (horizontal notice holder) was revised, but the revised size is in a picture that was not read; check the Q&A on SAM.gov.
- The signage schedule and floor plans are given out after award; Q&A 4 says the schedule comes after award while Q&A 20 says quantities are in the SOW.
- No Government estimate is given.
- No prevailing wage, construction wage determination or bonding requirement applies, per the Q&A; any change would come by amendment.
More to check before you bid
- The notice names requirements:
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 24, 2026
- Notice type
- Solicitation
- Office
- FA8601 AFLCMC PZIO, Wright Patterson AFB, OH
- Product/service code
- 9905 · Signs, Advertising Displays, and Identification Plates
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 339950)
- Versions
8 versions have been posted, newest first.
- Nov 24, 2026 · Amendment 0007 (this version)Due Dec 4, 2026
- Nov 23, 2026 · Amendment 0006Due Dec 4, 2026
- Nov 17, 2026 · Amendment 0005Due Dec 4, 2026
- Nov 12, 2026 · Amendment 0004Due Dec 4, 2026
- Nov 12, 2026 · Amendment 0003Due Dec 4, 2026 (changed)
- Nov 9, 2026 · Amendment 0002Due Nov 25, 2026
- Nov 5, 2026 · Amendment 0001Due Nov 25, 2026
- Nov 2, 2026 · SolicitationDue Nov 25, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- USDA Forest Service Boundary/Survey MarkersOnly small businesses can bid: the USDA Forest Service wants 5,000 fiberglass boundary/survey markers with a Forest Service decal applied to each, delivered to Boise, Idaho…
- Equipment - Main Lobby Wayfinding Signage - Source Sought NoticeThe Department of Veterans Affairs (VA) New Jersey Health Care System, through Network Contracting Office 2, is doing market research (a sources sought notice, not a…
- Wayfinding Signage SystemThe U.S. Embassy Vienna (Department of State) wants a contractor to make, deliver and install a complete wayfinding and emergency signage system at the embassy compound in…
- Arrow Canyon Kiosks Design and InstallationSolicitation 140LL027Q0032 is a total small business set-aside from the Bureau of Land Management (BLM), Nevada State Office, for the Arrow Canyon kiosks.
- Avery Dennison Brand Reflective ProductsUNICOR (Federal Prison Industries) wants name-brand Avery Dennison reflective sheeting and application tape under a two-year, firm-fixed-price (FFP: one set price, whatever the…