Solicitation
iHouse Apartment Construction
Department of Health and Human Services · Indian Health Service
AI summaryOnly small businesses that qualify as an Indian Small Business Economic Enterprise (ISBEE) can bid: the Indian Health Service (Division of Engineering Services, Seattle) wants a 19-unit apartment building built at Tonalea, Arizona, for its Inscription House Health Center. The work is one firm-fixed-price (FFP: one set price, whatever the work ends up costing) contract of 365 calendar days after notice to proceed, in the $5,000,000 to $10,000,000 range. Award goes to the lowest-priced offer rated acceptable; the response due date is November 12, 2026, 2:00 PM Pacific. More in the summary
A newer version of this notice was posted Oct 14, 2026. It moves the due date from Oct 8, 2026 to Nov 12, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 8 of 20 attachments weren't read (A01 Sign-In Sheet Site Visit iHouse.pdf, J08 Release of Claims iHouse.docx and 6 more). Check the attachments on SAM.gov.
Only small businesses that qualify as an Indian Small Business Economic Enterprise (ISBEE) can bid: the Indian Health Service (Division of Engineering Services, Seattle) wants a 19-unit apartment building built at Tonalea, Arizona, for its Inscription House Health Center. The work is one firm-fixed-price (FFP: one set price, whatever the work ends up costing) contract of 365 calendar days after notice to proceed, in the $5,000,000 to $10,000,000 range. Award goes to the lowest-priced offer rated acceptable; the response due date is November 12, 2026, 2:00 PM Pacific.
Who can bid (7)
- Indian Small Business Economic Enterprise (ISBEE) set-aside: the offeror must represent that it meets the ISBEE definition and intends to keep meeting it throughout the contract
- Small business under NAICS 236220 (size standard $45 million), self-certified in SAM.gov before the response due date
- Submit the ISBEE representation form (J07) with the offer
Show all 7Show fewer
- Bid guarantee (bid bond) of 20 percent of the bid price or $3 million, whichever is less, with the offer
- SAM.gov registration current before the response due date
- Perform at least 15 percent of the contract cost, not counting materials, with your own employees (limit on subcontracting)
- Joint ventures must include the joint venture agreement showing each member's identity, relationship, ownership and limits on authority
Things to watch (10)
From the version posted Oct 14, 2026.
- Serious: Only ISBEE small businesses can bid. The job is set aside for Indian Small Business Economic Enterprises that are also small under NAICS 236220; other firms cannot win.
- Serious: Bid bond due with the offer. A bid guarantee of 20 percent of the price or $3 million, whichever is less, must come with the offer; leaving it out may get the offer rejected.
- Worth checking: Joint venture and mentor-protege SBA proof. Joint ventures and teams must send SBA approval of small business status with the offer, or the offer may be rejected.
Show all 10Show fewer
- Worth checking: Navajo Nation licensing and employment rules. The site is on the Navajo Nation; the Government told bidders to contact its business licensing and employment offices, though the notice says TERO (Tribal Employment Rights Office rules) does not apply.
- Worth checking: At least 15 percent must be self-performed. The prime contractor must do 15 percent of the cost, not counting materials, with its own employees, and must send the J06 calculation sheet.
- Worth checking: Some questions still unanswered. Several Q&A answers are blank, and the Government may post more answers and updated attachments, which could change the price.
- Worth checking: Date passed (Sep 10, 2024): Final geotechnical report replaces the draft. The draft soils report in the basis of design was posted by mistake; price the work from the final report dated September 10, 2024, which calls for chemical treatment of reused soil.
- Worth checking: Solar canopy is a delegated design. The covered parking is a solar canopy designed by its manufacturer, with panels and inverter, so a small builder needs a canopy supplier.
- Minor: Response due date moved by Amendment A04. Amendment A04 extends the response due date to November 12, 2026, from October 22, 2026 set by Amendment A03.
- Minor: Limited work hours at an occupied site. Site work is limited to set hours, the owner stays in the adjacent rooms, and the Contracting Officer must approve extra costs for work outside those hours.
Read from the notice and 12 attachments. 8 of 20 not read. Show which files.
- B01 RFP 75H70126R00026 iHouse.pdf (read)
- J04 iHouse Apt 03 Phase 4 Specifications.pdf (read)
- J01 SOW iHouse.pdf (read)
- J01a GeoTech 10Sep2024.pdf (read)
- A04 SF-30 QA-GeoTech iHouse Apartment Construction.pdf (read)
- QA iHouse Apartment Construction Answers 14Oct2026.pdf (read)
- A03 SF-30 Ext Offers Due iHouse Apartment Construction.pdf (read)
- A02 SF-30 Ext Offers Due iHouse Apartment Construction.pdf (read)
- A01 SF-30 QA iHouse Apartment Construction.pdf (read)
- A01 QA iHouse Apartment Construction 18Aug2026.pdf (read)
- J02 iHouse Apt 01 Phase 4 BOD.pdf (read)
- J09 WH 347 Payroll Exp.pdf (read)
- A01 Sign-In Sheet Site Visit iHouse.pdf: not summarized: open it on SAM.gov
- J08 Release of Claims iHouse.docx: not summarized: open it on SAM.gov
- J05 Wage Det AZ20260043 18May2026.pdf: not summarized: open it on SAM.gov
- J06 Self Performed Calculation Sheet iHouse.docx: not summarized: open it on SAM.gov
- A01 GeoTech Report iHouse.pdf: not summarized: open it on SAM.gov
- J03 iHouse Apt 02 Phase 4 Drawings.pdf: not summarized: open it on SAM.gov
- J07 IHS IEE Representation Form iHouse.pdf: not summarized: open it on SAM.gov
- J99 Optional Form PPQ.docx: not summarized: open it on SAM.gov
Full summary
What they want
- Construct a 19-unit apartment building, adapting an existing design to the Tonalea site, with architectural, structural, mechanical, electrical, plumbing, landscaping and parking work
- Build a solar canopy that doubles as covered parking, as a delegated design by the canopy manufacturer, including panels and inverter, as a complete working system
- Do site work, earthwork and utility trenching from the drawings and the final geotechnical report dated September 10, 2024; bidders work out their own quantities
- Install snow and ice melt systems at both main entrances and heat tracing on all gutters and downspouts
- Work 8:00 AM to 4:30 PM, Monday through Friday, while the owner stays in the adjacent facility
- At completion: train Government staff, give two copies of the operation and maintenance manuals, and provide as-built drawings (red-line documents, two hard copies, one CD in AutoCAD)
- Contract type
- Firm-fixed-price, one contract; one lump sum price for the whole job
- Period of performance
- Start within 10 calendar days and finish within 365 calendar days after receiving the notice to proceed
- Place of performance
- Indian Route 6290, Tonalea, AZ 86044, Coconino County (Kayenta Service Unit); the Q&A says the site is within the Navajo Nation
- Estimated value
- Construction magnitude anticipated between $5,000,000 and $10,000,000 (Government's stated range)
- How they'll choose
- Lowest price technically acceptable (LPTA): offers are sorted by price and checked lowest first, and the first acceptable one wins. The Government intends to award without negotiations.
- Offers due
- November 12, 2026, 2:00 PM Pacific (5:00 PM Eastern)
What they'll judge offers on
- Factor 1, Technical (acceptable or unacceptable): at least one recent and relevant project similar in size, scope and complexity, plus a narrative with a summary schedule showing an appropriate technical approach
- Factor 2, Past Performance (acceptable or unacceptable): optional to submit; firms with no record are rated unknown, which counts as acceptable
- Factor 3, Price: the amount in block 17 of the SF 1442
What to include when you submit
- Send two volumes: Volume I, Technical Proposal, and Volume II, Price Proposal (firm-fixed price)
- Technical: show at least one recent and relevant project similar in size, scope and complexity, and include a narrative with a summary schedule showing your technical approach
- Past performance is optional; if sent, give projects at least 75% complete or completed within five years before the response due date
- Price: fill out and sign the Standard Form 1442 (SF 1442) blocks 14 to 20c, and acknowledge every amendment in block 19
- Attach J07, the ISBEE representation form, and send a copy of the bid bond (a scanned copy is accepted)
- Fill out J06, the self-performed calculation sheet, for the limit on subcontracting
- Send Section K (representations and certifications) in full, or a SAM.gov profile printout
- Joint ventures and teams: state each firm's role, include the joint venture agreement and SBA approval of small business status; mentor-protege joint ventures need SBA approval by the response due date
After award, you must have
- Any licenses and permits needed to work on the Navajo Nation and in Arizona; the winner is responsible for getting them From QA iHouse Apartment Construction Answers 14Oct2026.pdf:
…successful offeror is solely responsible for obtaining any necessary licenses and permits,…
Current contractor
No incumbent is named; this is a new construction project. The design is described as an existing design moved to a new location.
Not in the notice text
- Parts of the solicitation are attached but not read: most of the RFP's Sections G to L (including how and where to send offers, bonding and site visit information), the drawings (J03), wage determination (J05), ISBEE form (J07), self-performed sheet (J06) and the full Q&A answers and basis of design
- Where and how to submit offers: the RFP says to see Section L, which was not read in full
- Site visit: Amendment A01 posted a site visit sign-in sheet (a scan that could not be read), but the visit's date and whether it was required are not in the text read
- Wage rule: the RFP cites FAR 52.222-6 Construction Wage Rate Requirements (Davis-Bacon wage rates) and lists wage determination AZ20260043 as J05, which was not read
- Whether performance and payment bonds are required after award: the form's checkboxes could not be read; check the SF 1442 on SAM.gov
- Deadline for questions is not in the text read
- Answers to Q&A items left blank, and any later Q&A postings or updated attachments
Eligibility and how to respond
- Set aside for Indian small business economic enterprises: only those can bid as the prime contractor. More open indian economic enterprise set-asides under NAICS 236220
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Sep 17, 2026
- Notice type
- Solicitation
- Office
- Div of Engineering SVCS - Seattle, WA
- Product/service code
- Y1FA · Construction of Family Housing Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
5 versions have been posted, newest first.
- Oct 14, 2026 · Amendment 0004Due Nov 12, 2026 (changed)
- Oct 1, 2026 · Amendment 0003Due Oct 22, 2026 (changed)
- Sep 17, 2026 · Amendment 0002 (this version)Due Oct 8, 2026 (changed)
- Aug 19, 2026 · Amendment 0001Due Sep 24, 2026 (changed)
- Jul 15, 2026 · SolicitationDue Aug 24, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Limitations on subcontracting
Terms on this notice: Solicitation, Set-aside