Combined Synopsis/Solicitation
South Fork Bunkhouse Well Abandonment Project
Department of Agriculture · Forest Service
AI summary Beta
This summary may miss requirements: 7 of 11 attachments weren't read (C4_Attach 1_SOI_S. Fork Bunkhouse Well.xlsx, C4_Attach 3_Maps and Pics.pdf and 5 more). Check the attachments on SAM.gov.
The USDA Forest Service (Rio Grande National Forest) wants a licensed Colorado well driller to plug and abandon a roughly 101-foot well in South Fork, Colorado (solicitation 1240LT27Q0032). Quotes go by email and are due December 9, 2026, 9:00 AM Mountain. A bid guarantee is required with the quote, and work must finish by March 31, 2027.
Who can bid (5)
- Small business: the solicitation incorporates the Total Small Business Aside notice (SAM.gov's set-aside field is blank) From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Current Well Driller's and Pump Installer's License issued by the State of Colorado, submitted with the quote From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Bid guarantee (bid bond) on SF 24 submitted with the quote From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
Show all 5Show fewer
- Licensed water well construction contractor authorized to plug, seal and abandon all types of wells, plus a foreman with the needed expertise From C4_Attach 2_SOW_S. Fork Bunkhouse Well.pdf
- Active SAM.gov registration From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
How to submit: Email to Janice King (janice.king@usda.gov) and Lucas Dahlman (lucas.dahlman@usda.gov), with the solicitation name and number as the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 10, 2026.
- Serious: Bid bond due with the quote. Quotes without a bid guarantee on SF 24 are rejected; the amount is 20% of the total offer price, up to $3 million. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Serious: Performance and payment bonds after award. A payment bond at 100% of the contract price is required within 10 days of award, using SF 25 (performance) and SF 25A (payment); substitute forms are not accepted. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Serious: Colorado well driller license required with the quote. The license must show the driller can operate state-wide; a business without one cannot send a responsive quote. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
Show all 8Show fewer
- Worth checking: Small business set-aside shown in the solicitation, not on SAM.gov. SAM.gov's set-aside field is blank, but the solicitation checks the Total Small Business Aside clause; confirm with the contracting officer that only small businesses may bid. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Worth checking: The site visit was Nov 17, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Worth checking: Davis-Bacon construction wage rules apply. Pay must meet the posted wage determination, with payroll records. The wage determination files (CO20260003 and a service contract one) are attached but were not read. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
- Minor: State approval of the abandonment report takes time. Proof the state accepted the Well Abandonment Report is a deliverable, and the state can take about 4 weeks to process it. From C4_Attach 2_SOW_S. Fork Bunkhouse Well.pdf
- Minor: Questions were due Nov 19, 2026. Check the amendments for the agency's answers. From C4_1240LT27Q0032_S Fork Well Abandonment.pdf
Read from the notice and 4 attachments. 7 of 11 not read. Show which files.
- C4_1240LT27Q0032_S Fork Well Abandonment.pdf (read)
- C4_Attach 2_SOW_S. Fork Bunkhouse Well.pdf (read)
- C4_Attach 5_DWR 4467977_Look at Rule 16.pdf (read)
- C4_Attach 7_DWR_GWS_44_Copy of Original Well Permit Application.pdf (read)
- C4_Attach 1_SOI_S. Fork Bunkhouse Well.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C4_Attach 3_Maps and Pics.pdf: not summarized: open it on SAM.gov
- C4_Attach 4__Well Log_Permit 22197.pdf: not summarized: open it on SAM.gov
- C4_Attach 6__DWR_GWS_44_Copy of New Well Permit Application.pdf: not summarized: open it on SAM.gov
- C4_Attach 8_Guide to Filling the Well Abandonment Report eForm.pdf: not summarized: open it on SAM.gov
- C4_Attach 9_SCA_WD 2015-5433_08.22.2026.pdf: not summarized: open it on SAM.gov
- C4_Attach 10_WD CO20260003_05.18.2026.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Plug, seal and abandon the existing well (about 101 feet deep) to Colorado Division of Water Resources Rule 16 standards
- Fill the well to the static water level with clean sand, clean gravel, approved grout or coated granular bentonite, then fill to the surface with clay, grout, cuttings or bentonite
- Fill the top five feet of casing with approved grout, or install a permanent watertight cover
- Salvage the submersible pump and give it to the Contracting Officer Representative (COR); dispose of the drop pipe
- File the Well Abandonment Report with the state and later send proof the state accepted it
- Provide a project schedule or timeline
- Contract type
- Firm-fixed-price (FFP): one set price for the work. One award; pricing is required for all items
- Period of performance
- Start within 10 calendar days after receiving the notice to proceed; finish by March 31, 2027, including final cleanup
- Place of performance
- Beaver Mountain Trailhead, South Fork, CO 81154
- Estimated value
- Disclosure of magnitude: $25,000 - $100,000 (a stated range, not a Government estimate)
- How they'll choose
- Best value to the Government, based on a technical approach rating and price; formal trade-off procedures will not be conducted
- Offers due
- December 9, 2026, 9:00 AM Mountain
- How to submit
- Email to Janice King (janice.king@usda.gov) and Lucas Dahlman (lucas.dahlman@usda.gov), with the solicitation name and number as the subject line
- Page limits
- Technical approach explanation: 1-2 pages (the construction schedule does not count toward it)
What they'll judge offers on
- Factor 1 - Technical Approach: 1-2 page approach with execution plan, a current Colorado Well Driller's and Pump Installer's License, and a construction schedule (such as a Gantt chart); rated High, Some, Low or Neutral Confidence
- Factor 2 - Price: all items priced on the Schedule of Items spreadsheet; base period total evaluated for fairness and reasonableness
What to include when you submit
- Send a detailed 1-2 page approach with an execution plan for plugging the well under the regulations and the statement of work
- Include a current Well Driller's and Pump Installer's License issued by the State of Colorado, verifying the driller may operate state-wide
- Include a construction schedule (such as a Gantt chart) showing key tasks and their order within the performance period
- Price every item on the Excel Schedule of Items (C4_Attachment 1 - SOI), not in Adobe format; round line items up to whole dollars; add company name and UEI in the yellow block
- Submit a bid bond or other offer guarantee on Standard Form 24 (SF 24) with the quote: 20% of the total offer price, up to $3 million
- Hold prices firm for 60 calendar days after the due date
- Questions go by email to the same two contacts by November 19, 2026, 9:00 AM Mountain
After award, you must have
- Performance bond (SF 25) and payment bond (SF 25A) due within 10 calendar days after award, before work begins From C4_1240LT27Q0032_S Fork Well Abandonment.pdf:
Bonds are due no later than 10 calendar days after award and must be submitted to the Contracting Officer, Lucas Dahlman, at lucas.dahlman@usda.gov and Contract Specialist, Janice King, at…
Not in the notice text
- The Schedule of Items spreadsheet, maps and pictures, well log, new well permit application, the abandonment report guide and both wage determinations are attached but not read, so the line items and wage rates are unknown
- The optional item for abandonment deeper than the estimated depth is mentioned in the statement of work, but its quantity or price basis is not given in the text read
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA Forest Service-Spoc Im, Washington, DC
- Product/service code
- Y1NE · Construction of Water Supply Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- 550-26-121 FY27 NRM Emergent Repairs North Water Tower 71 & South Water Tower 94 CONThe Department of Veterans Affairs (VA) wants emergent repairs to the North Water Tower 71 and South Water Tower 94 in Danville, Illinois.
- Or-Malheur NWR-Domestic WellThe U.S. Fish and Wildlife Service (Department of the Interior) wants a contractor to drill a new 8-inch by 100-foot deep domestic/public well at Malheur National Wildlife Refuge…
- Whiteface Campground Well ReplacementThe U.S. Forest Service is asking for quotes (a request for quotation, RFQ) to upgrade the well equipment at Whiteface Campground near Makinen, MN. It is a total small business…