Solicitation
AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)
Department of Defense · Department of the Air Force
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Air Force Research Laboratory (AFRL) wants a contractor to redo the 2nd Floor hallway of Building 556 at Wright-Patterson Air Force Base, Ohio, with bomber-themed wall graphics, heraldry shields, scale models, painting and finishes. The whole project must finish within 90 calendar days of award. The response due date is December 4, 2026, 11:59 PM Eastern, and no set-aside is used.
Things to watch
From the version posted Nov 23, 2026.
- Serious: Submission rules and assessment criteria are in attachments. The notice text does not give how to submit, page limits or how offers are judged; all of that is in the AOI document.
- Worth checking: Whole project within 90 days of award. Design, sourcing, fabrication and installation all fit in 90 calendar days, with on-site work capped at 30 days.
- Minor: Restroom access limit during installation. Work on the active hallway must not block the 2nd Floor restrooms for more than 30 contiguous minutes.
Read from the notice text only.
Full summary
What they want
- Stage 1 Design Plan: 30 days
- Stage 2 Sourcing and Fabrication: 60 days
- Stage 3 Physical Implementation and Closeout: 90 days from award
- Bomber-specific wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes and decals
- On-site installation of no more than 30 calendar days from site start, without blocking the 2nd Floor restrooms for more than 30 contiguous minutes
- Period of performance
- 90 calendar days from award, in three stages
- Place of performance
- Wright-Patterson Air Force Base, Ohio (Building 556, 2nd Floor)
- Estimated value
- Not stated
- Contract vehicle
- Area of Interest (AOI) under the AFRL Rapid Infrastructure for Science and Experimentation (RISE) parent notice FA8652279-RISE, under 10 U.S.C. 2808a
- Offers due
- December 4, 2026, 11:59 PM Eastern
What to include when you submit
- Follow the submission instructions in the attached AOI document and attachments
Not in the notice text
- The AOI document and attachments hold the submission method, technical requirements and assessment criteria and were not in the text
- Contract type, estimated value and wage rule are not stated
- Whether there is a site visit is not stated
- Which wage rule applies (such as a Davis-Bacon wage determination) is not stated
Notice details
Notice type, codes, versions and files
- Posted
- Nov 23, 2026
- Notice type
- Solicitation
- Office
- FA8652 AFRL HQ AFRL/PK, Wright Patterson AFB, OH
- Product/service code
- Z1JZ · Maintenance of Miscellaneous Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Related notices
Other notices that name this solicitation, or that this one names.
- AFRL Rapid Infrastructure for Science and Experimentation (RISE) · FA8652279-RISEPosted later Nov 23, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria. To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures. Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.
Similar open opportunities
- MACH1 AOI Military Working Dog Facility Vandenberg Space Force LOE 1 and LOE 2Phase 1 solution briefs (short white papers) are due November 30, 2026, 12:00 PM CST; only firms the Government finds capable move on to a Phase 2 pitch session.
- $95M Tenant Renovation of Secure Spaces (TRSS) Multiple Award Task Order Contract (MATOC)The U.S. Army Corps of Engineers (USACE) Omaha District is running a sources sought (market research, not a request for offers) for a $95M Tenant Renovation of Secure Spaces…
- FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John CochranOnly certified service-disabled veteran-owned small businesses (SDVOSBs) can bid on solicitation 36C77627B0001, a sealed-bid (invitation for bids) construction job at the St.
- Repair Auto Maintenance Facility Bldg 575 (230040)Only the seven General MACC (multiple award construction contract) holders listed in the RFP can bid on this Camp Lejeune project to repair Auto Maintenance Facility Building 575.