The Federal Aviation Administration (FAA) wants an engineering firm to produce permit-ready mechanical, electrical, plumbing, fire protection and life safety drawings for renovating a leased building at 3551 Combine St., Paso Robles, California (solicitation 697DCK-27-R-00022A, a small business set-aside). Offers go by email and the response due date is December 2, 2026, 5:00 PM Eastern. The period of performance is 130 days from notice to proceed.
Who can bid
- Small business under NAICS 541330 (SAM.gov set-aside: Small Business Set Aside - Total); the SIR gives the size standard as annual average receipts not exceeding $25.5 From 06 SIR 697DCK-27-R-00022A.pdf
- Active registration in the System for Award Management (SAM.gov) with a Unique Entity Identifier
- Be the Architect of Record for California if your own architect is not licensed in California; the FAA confirmed this in an answer to a bidder question From 21 Amendment 0004 697DCK-27-R-00022A.pdf
How to submit: Email to Linda.Hennequant@faa.gov, with the solicitation number in the subject line; Word or PDF files, not zipped, each email under 10MB. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
- Serious: Small business set-aside. Only firms that are small under the engineering services size standard can win; larger firms are shut out.
- Worth checking: Basis of award differs between documents. The notice text says award goes to the lowest priced, responsible offer, while Section M says best value considering price and other SIR criteria; ask the contracting officer which governs. From 06 SIR 697DCK-27-R-00022A.pdf
- Worth checking: California licensing and city approval. Drawings must be stamped and approved by the City of Paso Robles, and the FAA says you need to be the Architect of Record if your architect is not California-licensed. From 06a A01 SOW Design_Paso Robles SSC.pdf
Show all 6Show fewer
- Worth checking: Short design schedule. The statement of work sets a site survey within 7 days, 50% drawings within 4 weeks and final drawings within 10 weeks of notice to proceed, while the amendment gives 130 days overall; ask how they fit together. From 06a A01 SOW Design_Paso Robles SSC.pdf
- Minor: Response due date moved several times. Amendment 0004 moves the response due date to December 2, 2026 from November 30, 2026; earlier amendments moved it from November 12 to November 16 and then to November 30. From 21 Amendment 0004 697DCK-27-R-00022A.pdf
- Minor: Code edition differs from the statement of work. The statement of work lists the 2022 California codes, but the FAA answered that bidders should design to the 2025 California Building Code. From 06a A01 SOW Design_Paso Robles SSC.pdf
Read from the notice and 8 attachments. Show which files.
- 21 Amendment 0004 697DCK-27-R-00022A.pdf (read)
- 21 Amendment 0003 697DCK-27-R-00022A.pdf (read)
- 21 Amendment 0002 697DCK-27-R-00022A.pdf (read)
- 06 SIR 697DCK-27-R-00022A.pdf (read)
- 06a A01 SOW Design_Paso Robles SSC.pdf (read)
- 21 Amendment 0001 697DCK-27-R-00022.pdf (read)
- 06a A02 SOWa A01 DID-Paso Robles SSC DID 60226.pdf (read)
- 06a A03 Form Past Performance_Experience Info.pdf (read)
Full summary
What they want
- Use the FAA's Design Intent Drawings to produce permit-ready mechanical (HVAC), electrical, plumbing, life safety and fire protection (sprinkler) drawings
- Submit final drawings to the City of Paso Robles, fix any city corrections and obtain final city approval of the stamped design drawings
- Deliver three full-size ANSI D (22 inch by 34 inch) sets of MEP/FP drawings approved for construction permit, plus a life safety sheet and hydraulic and electrical load calculations
- Meet the schedule: site survey within 7 days, 50% drawings within 4 weeks, 90% drawings within 3 weeks of the FAA's return of comments, final drawings within 10 weeks of notice to proceed
- Design to the 2025 California Building Code (the FAA's answer to a bidder question), including shades or blinds on windows and doors
- Contract type
- Single lump-sum line (1 LS) for engineering services; priced as one total; the FAA calls the document a Screening Information Request (SIR, the FAA's name for a solicitation)
- Period of performance
- 130 days from issuance of the notice to proceed, which takes effect upon award (final permit drawings due within 10 weeks of notice to proceed)
- Place of performance
- 3551 Combine St., Paso Robles, CA 93446
- Estimated value
- Not stated
- How they'll choose
- Documents differ: the notice text says lowest priced, responsible offer; the SIR's Section M says best value considering price and other SIR criteria. Award follows successful negotiation of price.
- Offers due
- December 2, 2026, 5:00 PM Eastern (from the version posted Nov 13, 2026; amended since)
- How to submit
- Email to Linda.Hennequant@faa.gov, with the solicitation number in the subject line; Word or PDF files, not zipped, each email under 10MB
What they'll judge offers on
- Price: fairness and reasonableness of the proposed price
- Past performance and experience information (form required with the offer; no scoring criteria are given)
What to include when you submit
- Complete Blocks 16a, 22, 23 and 28 of the SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS form (the cover form of the solicitation) and return any signed amendment forms
- Return Section K, Representations, Certifications and Other Statements of Offerors
- Return the Past Performance / Experience Information form: list at least three projects of the same or similar size and scope completed within the last 5 years; a mix of prime and subcontractor experience is allowed
- Include a statement of how far you agree with the FAA's terms, conditions and provisions; the FAA may decline offers that reject any of them
- Register in SAM.gov (System for Award Management) with a Unique Entity Identifier and keep your representations current
Current contractor
No incumbent is named. The FAA says a prior firm produced only the Design Intent Drawings and was not contracted to create a permit set.
Not in the notice text
- The government's estimate or budget for this design work is not stated.
- The Section K representations form and the middle part of the solicitation document were cut for length and not fully read.
- How past performance is scored is not given; the solicitation only asks for the form.
- Whether a bid or professional liability insurance is required is not stated in the text read.
More to check before you bid
- Architect-engineer services tied to buildings or construction are usually bought under the Brooks Act: the agency ranks firms on qualifications from an SF 330 first, then negotiates a price with the top firm. How A/E contracts work.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Solicitation
- Office
- 697DCK Regional Acquisitions SVCS, Fort Worth, TX
- Product/service code
- C215 · Architect and Engineering – General: Production Engineering
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541330)
- Versions
7 versions have been posted, newest first.
- Nov 23, 2026 · AmendmentDue Dec 2, 2026
- Nov 16, 2026 · AmendmentDue Dec 2, 2026
- Nov 13, 2026 · Amendment 0006 (this version)Due Dec 2, 2026 (changed)
- Nov 5, 2026 · AmendmentDue Nov 30, 2026 (changed)
- Nov 3, 2026 · AmendmentDue Nov 16, 2026 (changed)
- Oct 28, 2026 · AmendmentDue Nov 12, 2026
- Oct 26, 2026 · SolicitationDue Nov 12, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside