Presolicitation
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Department of Defense · Department of the Air Force
Response due Jan 15, 2027 · No set-aside · San Antonio, TX
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Air Force's list before the solicitation is posted. See the contact
AI summary Beta
The notice looks incomplete: Key rules are in the MACH1 Umbrella Program Notice (FA8903-OT-MACH1), posted separately on SAM.gov and not read, including data rights and sharing terms. Check the attachments on SAM.gov.
Phase 1 Solution Briefs (five-page white papers) are due January 15, 2027, 10:00 AM Central. Only firms the Air Force advances after Phase 1 go on to Phase 2 oral presentations or Phase 3 proposals. This is FA8903-27-OT-001, the MACH1 area of interest (AOI, a call for solutions) for horizontal airfield infrastructure. The 772nd Enterprise Sourcing Squadron (772 ESS), for the Air Force Civil Engineer Center (AFCEC), wants a partner for airfield pavement design and construction. Any award would be an Other Transaction Agreement (OTA, a flexible deal outside standard contract rules). SAM.gov lists San Antonio, TX.
Who can bid
- At least three completed airfield pavement projects on Department of War installations or FAA Part 139 commercial airports (airports certified by the FAA for scheduled passenger service), done within the past 10 years, each over $10M From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Company in good standing and not on the federal excluded parties list From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
How to submit: Email to 772ESS.PKA.MACH1@us.af.mil, with the notice ID "FA8903-27-OT-001 Horizontal Airfield Infrastructure" in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Nov 17, 2026.
- Serious: Phase 1 of a multi-phase process; later phases may be invitation only. This notice covers Phase 1 (solution brief, due January 15, 2027). The Government decides who advances to Phase 2 (oral presentation) or Phase 3 (full proposal), and may limit how many are invited; a firm not advanced is shut out. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Serious: Specific projects go only to pre-qualified firms or one respondent. No new AOI is issued for each project; a request goes to one firm judged uniquely advantageous, or to three or more pre-qualified firms in the Solutions Repository, so only repository firms can compete for specific projects. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Serious: Three airfield projects over $10M required in the brief. The brief must show at least three completed airfield pavement projects on military bases or FAA Part 139 airports in the last 10 years, each over $10M, which many small firms may not have. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
Show all 6Show fewer
- Worth checking: Other Transaction Agreement, not a standard contract. An award would be an OTA, so the usual Federal Acquisition Regulation (FAR) terms may not apply; the terms are in the MACH1 umbrella notice, which was not read here. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Worth checking: Briefs are kept for 12 months and shared under umbrella terms. Your brief goes into a Solutions Repository for 12 months, and the umbrella notice sets sharing and data rights terms (Paragraphs 3.3 and 3.4) that were not read here. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Worth checking: Open-book Guaranteed Maximum Price and design-plus-build scope. The partner must produce design, an open-book price cap and a schedule, then build within that cap, so cost and design risk sit largely with the firm. From MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
Read from the notice and 2 attachments. Show which files.
- MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx (read)
- ATTACHMENT_1__PROJECT_LISTINGS.docx (read)
Full summary
What they want
- Line of Effort 1 (LOE 1), Design and Planning: a site-specific design package advanced to about 35% to 65% design completion, with constructability reviews and phasing studies
- Open-book Guaranteed Maximum Price (GMP, a price cap) package with quantity takeoffs and cost backup, plus a baseline schedule
- A risk plan covering supply chain, site access, geotechnical and environmental conditions, utility conflicts and unforeseen site conditions
- LOE 2, Final Design and Physical Construction: 100% stamped and sealed drawings and specifications, phased Issued for Construction (IFC) packages, and construction within the negotiated GMP ceiling
- Work on airfield pavements, lighting and electrical systems, drainage and safety infrastructure, and utility corridors; the lists are illustrative, not complete
- Designs must follow Unified Facilities Criteria (UFC, Department of Defense design standards), Air Force policy, and anti-terrorism and force protection (AT/FP) and flightline access rules
- Attachment 1 lists sample projects at Davis-Monthan, Kirtland, Laughlin, Tinker, Vance, Eareckson Air Station and Wake Island, and is not all-inclusive
- Contract type
- Other Transaction Agreement (OTA) under 10 U.S.C. 2808a, with an open-book Guaranteed Maximum Price (GMP) expected
- Place of performance
- San Antonio, TX, USA per SAM.gov; the AOI names no specific site, and Attachment 1 lists sample projects at other Air Force installations
- Estimated value
- Not stated
- Contract vehicle
- MACH1 (Modernized Agile Construction Horizons) umbrella program, notice FA8903-OT-MACH1; later project requests go to firms in the MACH1 Solutions Repository
- How they'll choose
- Phase 1 briefs are judged on their own merit against four criteria; the Government then decides which firms go to Phase 2 (oral presentation) or straight to Phase 3. No price is requested in Phase 1
- Offers due
- January 15, 2027, 10:00 AM Central (CST)
- How to submit
- Email to 772ESS.PKA.MACH1@us.af.mil, with the notice ID "FA8903-27-OT-001 Horizontal Airfield Infrastructure" in the subject line
- Page limits
- Solution Brief (white paper): 5 pages, not counting the title page; Executive Summary: 1 page maximum
What they'll judge offers on
- Relevance to AOI: does the executive summary target the problem; if irrelevant, evaluation stops
- Merit of Constructability Concept: is the method technically reasonable and credible
- Company Viability: experience to do the work and good standing, including not being on the federal excluded parties list; extra consideration for pavement projects at or near the project sites
- Schedule and Execution Risk: confidence in the schedule for the LOE 1 design package, pre-construction, mobilization, execution and closeout, including risk mitigation
What to include when you submit
- Title page: company name, title, date, point of contact (name, email, phone) and address, and say which AOI it answers
- Executive Summary (1 page maximum): a short overview of the team's approach to the LOE 1 design and planning objectives
- Core Concept: describe the method for the site-specific design and the strategy for reaching a firm GMP and schedule, with a high-level milestone schedule for the LOE 1 design effort
- Credentials: a brief company overview, top-line gross sales or revenues, and go-to-market strategy
- Include examples of at least three completed airfield pavement projects on DoW installations or commercial FAA Part 139 airport projects, within the past 10 years and each with a value over $10M
- Under MACH1 rules, Phase 1 briefs go into a Solutions Repository and stay valid for 12 months
Not in the notice text
- Key rules are in the MACH1 Umbrella Program Notice (FA8903-OT-MACH1), posted separately on SAM.gov and not read, including data rights and sharing terms
- Dates for Phase 2 and Phase 3 are not given
- The AOI names no specific project site, size or budget; Attachment 1 only lists sample projects
- Whether a site visit applies, and whether a Davis-Bacon wage determination (federal construction wage rule) applies to this work, is not stated
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Presolicitation
- Office
- FA8903 772 Ess PK, JBSA Lackland, TX
- Product/service code
- Y1BD · Construction of Airport Runways and Taxiways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Attachments
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction ContractThe Navy (NAVFAC Northwest) is seeking multiple-award construction contracts (MACC: several firms hold a shared contract and compete for task orders) for the Shipyard…
- Department of Energy, AT Courtyard Construction and Site Utility InfrastructureOnly small businesses can bid on this presolicitation (advance notice, not the request for proposals itself), solicitation W911WN27R0005, from the U.S. Army Corps of Engineers…