Solicitation
Enhanced Use Lease for Commercial Power Generation Facility
Department of Defense · Department of the Army
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 20, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 14 attachments weren't read (Attachment L Joint Base Lewis McChord.pdf, Attachment M NEPA Implementing Procedures.pdf). Check the attachments on SAM.gov.
The Department of the Army (DA) is asking private, public or nonprofit entities to lease Army land and build and run a commercial power plant, optionally with a data center, under a 25-year enhanced use lease (EUL: a long-term lease of Army land). The response due date is January 18, 2027, 5:00 PM EST. Land is offered at nine installations, and the lessee must give the Army backup power in return.
Who can bid (5)
- Proposal must include contingency power for the Army: within 1 hour of a grid outage and for at least 14 continuous days; the Army will not evaluate proposals without it From RFP No. DACA27-1-27-0015900.pdf
- Company may not be owned or controlled by, or do business with, a Restricted Entity (debarred parties, sanctioned parties, foreign entities of concern, China and other listed countries); closing is also conditioned on a foreign ownership review From Attachment B Term Sheet (Sample).pdf
- Financial capability, bonding capacity and institutional relationships to finance and build a project of this size; the Army may also require financial and performance guarantees From RFP No. DACA27-1-27-0015900.pdf
Show all 5Show fewer
- Experience performing similar projects and understanding of building on Army land From RFP No. DACA27-1-27-0015900.pdf
- Agree to the sample term sheet and lease terms, which are not open to substantive negotiation From RFP No. DACA27-1-27-0015900.pdf
Things to watch (10)
- Serious: Large infrastructure project, not a typical small business buy. The lessee must finance, build, own and run a power plant on its own money, with no Army contribution, and prove it can fund and bond a project of this size. From RFP No. DACA27-1-27-0015900.pdf
- Serious: Backup power for the Army is mandatory. Proposals without resilient power within 1 hour of an outage for at least 14 days will not be evaluated, and the bidder must also fund any needed utility upgrades. From RFP No. DACA27-1-27-0015900.pdf
- Serious: Data center alone not accepted. A bid must include power generation; the Army prefers power plus a data center and ranks Top Secret-grade campuses first.
Show all 10Show fewer
- Serious: Lease terms are not negotiable. Bidders accept the sample term sheet and lease as written, including decommissioning, insurance and default terms, so review them with a lawyer before bidding. From RFP No. DACA27-1-27-0015900.pdf
- Serious: Restricted-entity ownership ban and foreign ownership review. Companies owned or controlled by listed foreign or sanctioned parties cannot take part, and closing depends on a foreign ownership, control or influence review. From Attachment B Term Sheet (Sample).pdf
- Worth checking: Bidder must find buyers for the power. The Army expects all power and data center capacity to be sold to third parties, and the selected bidder must secure those buyers and follow state utility rules. From RFP No. DACA27-1-27-0015900.pdf
- Worth checking: Strict water limits. Projects may not draw on aquifers and must use non-potable sources, with water use net-neutral or better, at the bidder's expense.
- Worth checking: Environmental review and site conditions. The Blue Grass parcel has karst limestone, possible wetlands, bat habitat limits, and an eastern half never surveyed for archaeology, which can delay building. From Attachment D Blue Grass Army Depot.pdf
- Minor: Exclusive federal jurisdiction at Blue Grass. Because civil law may be unclear on the Kentucky parcel, bidders should plan how contract disputes will be handled. From Attachment D Blue Grass Army Depot.pdf
- Minor: Place of performance differs from the SAM.gov field. SAM.gov lists Richmond, KY, but the RFP offers land at nine installations in nine states.
Read from the notice and 12 attachments. 2 of 14 not read. Show which files.
- RFP No. DACA27-1-27-0015900.pdf (read)
- Attachment A 10 USC 2667.pdf (read)
- Attachment B Term Sheet (Sample).pdf (read)
- Attachment C EUL (Sample).pdf (read)
- Attachment D Blue Grass Army Depot.pdf (read)
- Attachment E Pine Bluff Arsenal.pdf (read)
- Attachment F Tooele Army Depot.pdf (read)
- Attachment G Sierra Army Depot.pdf (read)
- Attachment H Fort McCoy.pdf (read)
- Attachment I Fort Bragg.pdf (read)
- Attachment J Fort Hood.pdf (read)
- Attachment K Fort Rucker.pdf (read)
- Attachment L Joint Base Lewis McChord.pdf: not summarized: open it on SAM.gov
- Attachment M NEPA Implementing Procedures.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Lease Army land at one or more of nine installations and design, finance, permit, build, own, operate and later decommission a commercial power generation facility
- Optionally add a data center on the same campus; proposals for a data center alone will not be considered
- Give the Army resilient power within 1 hour of a grid outage, for at least 14 continuous days, plus any utility upgrades needed to receive it
- Pay rent in cash, in kind, or both, at no less than the fair market value of the lease interest, as set by an Army appraisal
- Find and sign up the buyers (off-takers) for all power and data center capacity
- Meet water rules: avoid aquifer draws, use non-potable sources, and keep water use net-neutral or better
- Restore the land to its prior condition before the lease ends and fund the environmental review (NEPA) work
- Sign a term sheet with a milestone timetable within 90 days of the Army's selection notice
- Contract type
- Enhanced use lease (EUL) of non-excess Army land under 10 U.S.C. 2667; a lease, not a purchase of goods or services
- Period of performance
- Initial term of 25 years; the Army may add a renewal option only if the bidder proposes one
- Place of performance
- Nine installations: Blue Grass Army Depot (Kentucky, about 358 acres), Pine Bluff Arsenal (Arkansas, 607), Tooele Army Depot (Utah, 632), Sierra Army Depot (California, 445), Fort McCoy (Wisconsin, 1,000), Fort Bragg (North Carolina, 385), Fort Hood (Texas, 406), Fort Rucker (Alabama, 903) and Joint Base Lewis-McChord (Washington). SAM.gov lists Richmond, KY.
- Estimated value
- Not stated
- How they'll choose
- Five equally weighted factors, each rated Exceptional, Acceptable or Unacceptable; the Army may award on initial proposals or hold discussions and ask for final revised proposals
- Offers due
- January 18, 2027, 5:00 PM EST (from the version posted Nov 20, 2026; amended since)
What they'll judge offers on
- Project Description: (a) feasibility and funding plan, (b) fit with installation mission and risks, (c) best use of the tracts and acreage, (d) impact on environment and community, (e) data center preference for Top Secret campuses first, then large AI and high-performance computing facilities
- Project Plan: plan for utilities, access, police and fire protection and waste removal, and the milestone timetable; carrier-neutral data centers preferred
- Financial Capability: strategy and ability to fund and manage financing, plus financial capability, bonding capacity and institutional relationships
- Organizational Structure, Experience, and Past Performance: confidence in the plan, experience with similar projects, and willingness to follow rules unique to Army land
- EUL Consideration (Rent): cash or in-kind payment of at least fair market rental value over 25 years, including contingency power; longer resilience up to 90 days is preferred
What to include when you submit
- Send questions by email to DLL-usarmy.rfp.question@usace.army.mil with the subject line the RFP gives; questions may not be considered after January 6, 2027
- Name the tract(s) and acreage you propose to lease at each installation
- Say whether your proposal is power generation only or power generation plus a data center
- Include your proposed milestone timetable, which later becomes part of the term sheet
- Include cash, in-kind or combined rent, and the contingency power the Army must receive within 1 hour of an outage for at least 14 continuous days
- Joint ventures and special purpose entities may submit a proposal; the Army will not help find partners
- Proposal components are listed as sections 6.1 to 6.5: project description, project plan, financial capability, organizational structure and experience, and rent
After award, you must have
- Sign the term sheet with an agreed milestone timetable within 90 days of the selection notice From RFP No. DACA27-1-27-0015900.pdf:
…no later than ninety (90) days from the date of the Selection Notice…
Not in the notice text
- Part of the RFP was not read here: sections 2.2.3 to 7.1, which hold the submission instructions (section 4), proposal contents (section 6), prevailing wage and other development rules. Check the full RFP on SAM.gov.
- How and where to submit the proposal, file format and page limits are in the RFP sections that were not read.
- Whether a site visit is offered is not stated in the text read.
- Attachment L (Joint Base Lewis-McChord site information) and Attachment M (Department of War NEPA procedures) are attached but not read.
- The middle parts of the term sheet (Attachment B) and the sample lease (Attachment C), including rent payment, insurance amounts and the decommissioning financial assurance, were not read.
- The rent amount is not set; the Army will appraise fair market value.
- Set-aside is not stated on SAM.gov and none appears in the text read.
- Attachment A's page footer shows RFP number DACA27-9-26-0038000, different from this RFP's DACA27-1-27-0015900; ask the contracting office if it matters.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- W072 ENDIST Louisville, KY
- Product/service code
- X1PC · Lease/Rental of Unimproved Real Property (LAND)
- Business type
- Real estate, rentals & leasing (FedReady's grouping, from NAICS 531120)
- Versions
2 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0001Due Jan 18, 2027
- Nov 20, 2026 · Solicitation (this version)Due Jan 18, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- U.S. Government Seeks to Lease Office and Related Space in Lexington, KYThe General Services Administration (GSA) Public Buildings Service seeks expressions of interest from building owners to lease 40,120 to 42,126 ABOA square feet (ANSI/BOMA office…
- US Government seeks to Lease Office Space in Holtsville, NYGSA is asking building owners for expressions of interest to lease 9,999 to 10,499 square feet of office space in Holtsville, New York, for a 10-year term with a 5-year firm term.
- Retail Space to Lease - Delano, CASolicitation DACA095220056500: the Los Angeles District of the U.S. Army Corps of Engineers wants to lease existing retail space in Delano, CA, for an Armed Forces Career Center…
- The government seeks expression of interest from lessors to lease office space in Portland, MaineThe General Services Administration (GSA) Public Buildings Service wants expressions of interest from building owners or their representatives for 5,298 to 5,509 ABOA square feet…
- U.S. Department of Agriculture Seeks to Lease Office and Related Space in Springfield, GAThe U.S. Department of Agriculture (USDA) wants to lease 1,100 to 1,155 usable square feet of office space in Springfield, GA; initial offers are due November 28, 2026, and only…