Combined Synopsis/Solicitation
30 RS Mission Planning Software Tool (MPST)
Department of Defense · Department of the Air Force
Small business set-aside · NV
A newer version of this notice was posted Nov 20, 2026. It moves the due date from Nov 20, 2026 to Nov 30, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 9, 2026. The notice was amended Nov 20, 2026. The due date moved from Nov 20, 2026 to Nov 30, 2026. Check what else changed on SAM.gov. The notice looks incomplete: The draft DD Form 254 (dd0254 Draft.pdf: the contract's security classification specification) couldn't be read; check it on SAM.gov for the security requirements. Check the attachments on SAM.gov.
The Air Force's 99th Contracting Squadron wants a small business to maintain the Mission Planning Support Tools (MPST) software and its link to the Advanced Framework for Simulation, Integration and Modeling (AFSIM) for the 30th Reconnaissance Squadron (30 RS) at Creech AFB, Nevada (solicitation F3G1EB6257AG01). Work is mostly at the contractor's facility with periodic classified on-site visits, and on-site staff need Top Secret/SCI clearances and Special Access Program (SAP) eligibility. The contract is one base year plus four option years starting November 30, 2026.
Who can bid (4)
- Total small business set-aside: only small businesses under NAICS 541511 may quote From 30 RS MPST Combo - Revised - General.pdf
- Active System for Award Management (SAM) registration when quoting and at award From 30 RS MPST Combo - Revised - General.pdf
- Staff on government sites must be U.S. citizens with Top Secret/SCI (Sensitive Compartmented Information) clearances and SAP eligibility From MPST AFSIM PWS.pdf
Show all 4Show fewer
- Staff must know MPST programming, the RQ-170's AFSIM version, RQ-170 survivability and threat systems, and Suppressor modeling
How to submit: Email to Capt Taylor Peeples (taylor.peeples.1@us.af.mil) and TSgt Jeffrey Perkins (jeffrey.perkins.4@us.af.mil), due November 20, 2026, 10:00 AM PT. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Small business set-aside. Only businesses that are small under NAICS 541511 can quote. From 30 RS MPST Combo - Revised - General.pdf
- Serious: Top Secret/SCI/SAP clearances and facility clearance. A firm without cleared staff and a Top Secret facility clearance faces long security processing before it can start work. From MPST AFSIM PWS.pdf
- Serious: MPST is a contractor's proprietary software. The PWS calls MPST the contractor's proprietary software, so a new firm may not have rights to the code it must maintain; ask the contracting officer. From MPST AFSIM PWS.pdf
Show all 8Show fewer
- Worth checking: Place of performance names one city. The PWS says the primary place of performance is the contractor's facility in Rapid City, SD, as listed in the DD254, while SAM.gov lists Nevada. From MPST AFSIM PWS.pdf
- Worth checking: Modification turnaround: 14 days or 15 business days. The PWS gives 14 days, 14 business days and 15 business days for standard modifications in different places. From MPST AFSIM PWS.pdf
- Worth checking: Funds not yet available. The award depends on funds being made available, so the contract may be delayed or not awarded. From 30 RS MPST Combo - Revised - General.pdf
- Minor: Monthly report: 5th or 15th workday. The deliverables table says the 15th workday of each month, while section 6.1 says the fifth working day. From MPST AFSIM PWS.pdf
- Minor: One-business-day response. Support requests must be acknowledged within one business day, which needs staff on call. From MPST AFSIM PWS.pdf
Read from the notice and 3 attachments. Show which files.
- MPST AFSIM PWS.pdf (read)
- 30 RS MPST Combo - Revised - General.pdf (read)
- dd0254 Draft.pdf (read)
Full summary
What they want
- Maintain the MPST software and custom databases, keeping them compatible with RQ-170 mission planning system upgrades
- Create and maintain an AFSIM-usable threat database and threat library, updated twice a year
- Fix bugs and limitations and reflect new aircraft capabilities; standard modification time of 14 or 15 business days (see red flags)
- Respond to support requests by phone or email within one business day
- Two AFSIM training sessions a year for groups of ten, plus up-to-date documentation and training materials
- Two working groups and two technical interchange meetings a year; two trips a year to Creech AFB (2 travelers, 3 days each)
- Monthly status reports, trip reports and a quality control plan (QCP) within 30 calendar days after award
- A transition-out plan and hand-over of the government-owned threat database, AFSIM source code and documentation at contract end
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing), with five contract line items (CLINs: priced lines), base year plus four option years
- Period of performance
- 1 base year + 4 option years, beginning November 30, 2026
- Place of performance
- Contractor's facility (the PWS names Rapid City, SD, as listed in the DD254), with periodic on-site visits to Creech AFB, NV and other classified locations
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest-priced quote rated acceptable wins, with price judged on the total of the base year and all options
- Offers due
- November 20, 2026, 10:00 AM PT (from the version posted Nov 9, 2026; amended since)
- How to submit
- Email to Capt Taylor Peeples (taylor.peeples.1@us.af.mil) and TSgt Jeffrey Perkins (jeffrey.perkins.4@us.af.mil)
What they'll judge offers on
- Price: total evaluated price of all line items, base and options, found fair and reasonable
- Technical: acceptable or unacceptable, based on following the instructions and meeting the PWS and attachments
What to include when you submit
- Price every line item (CLINs 0001 through 0005); a missing price may make the quote unacceptable
- Include the solicitation number, company name, address and phone, Unique Entity ID (UEI) and Commercial and Government Entity (CAGE) code
- Include product specifications, payment terms, discount terms, point of contact, phone, fax, email and proposed delivery schedule
- State how far you agree with all terms, conditions and provisions, including any amendments
- Hold prices firm for 60 calendar days after the response due date
- Contact the Government to confirm your quote was received before the response due date
After award, you must have
- A Top Secret facility security clearance before performing work (the Government will request one if the contractor doesn't have it) From MPST AFSIM PWS.pdf:
…obtain a facility security clearance at the level of Top Secret prior to performing contract work.
Current contractor
No incumbent is named. The PWS cover shows contract number FA486121C0028, calls MPST the contractor's proprietary software, and names a contractor facility in Rapid City, SD.
Not in the notice text
- The draft DD Form 254 (dd0254 Draft.pdf: the contract's security classification specification) couldn't be read; check it on SAM.gov for the security requirements
- No price schedule or estimated value is given
- Whether a new contractor gets rights to the MPST source code
- How the technical part of the quote should be written or how long it may be
More to check before you bid
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 9, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- FA4861 99 CONS LGC, Nellis AFB, NV
- Product/service code
- DA10 · IT and Telecom – Business Application/Application Development Software as a Service
- Business type
- IT, software & telecom (FedReady's grouping, from NAICS 541511)
- Versions
6 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0005Due Nov 30, 2026
- Nov 17, 2026 · Amendment 0004Due Nov 30, 2026 (changed)
- Nov 9, 2026 · Amendment 0003 (this version)Due Nov 20, 2026
- Nov 9, 2026 · Amendment 0002Due Nov 20, 2026
- Nov 6, 2026 · Amendment 0001Due Nov 20, 2026
- Nov 6, 2026 · Combined Synopsis/SolicitationDue Nov 20, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- IMT HDB Service IDIQ ContractSolicitation 140R4026R0021: Hydrological Database (HDB) Support Services, a Bureau of Reclamation (Interior) request for quotations open only to small businesses (100% total…
- N6852027R1003: Naval Air Systems Command (NAVAIR) Depot Maintenance System (NDMS) IT Program/Project Functional Requirements and Software Lifecycle Support (ITPSS) Request for Proposal (RFP)
- Open Source Software: MOOSE: The Multiphysics Simulation Powerhouse
- Radiology and Cardiology Foundational Enterprise Imaging SystemCombined synopsis/solicitation 36C10B27R0003: the Department of Veterans Affairs (VA) Technology Acquisition Center in New Jersey wants one vendor to supply, install and run a…
- Update for the Pre-Solicitation Notice GPO Production Environment Track and Trace PlatformThe U.S. Government Publishing Office (GPO) plans to buy a track-and-trace software platform that follows materials through its print production process, with work at its…