Solicitation 1305M327Q0022: the National Oceanic and Atmospheric Administration (NOAA) wants a small business to paint about 9000 sqft, replace about 2,300 sqft of carpet and renovate two restrooms at the National Weather Service (NWS) office in Slidell, LA. The solicitation says it is set aside 100% for small businesses (SAM.gov does not state a set-aside). One firm-fixed-price (FFP: one set price, whatever the work costs) order will be awarded. The response due date is December 9, 2026, 12:00 PM CT, by email to two addresses.
Who can bid
- Small business set-aside: only small businesses can bid, and the firm must meet the NAICS 238330 size standard of $19.0M when quotes are due From Sol_1305M327Q0022.pdf
- At least three completed renovation projects of similar size and scope in the last three years, as prime contractor (a subcontractor's projects may be used if it does a major part of the work) From Sol_1305M327Q0022.pdf
- Active registration in the System for Award Management (SAM) with a CAGE code and UEI number, shown in the quote From Sol_1305M327Q0022.pdf
How to submit: Email to both sara.brunstetter@noaa.gov and jenna.taulman@noaa.gov, with "RFQ 1305M327Q0022" in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 19, 2026.
- Serious: Small business set-aside stated in the solicitation, not on SAM.gov. Only small businesses under the $19.0M size standard may bid; SAM.gov's fields say the set-aside is not stated, so confirm with the contracting officer if unsure. From Sol_1305M327Q0022.pdf
- Serious: Payment bond or letter of credit for 100% of the price. Within 10 days of award you must post a payment bond or irrevocable letter of credit for the full contract price, which needs bonding capacity or bank credit. From Sol_1305M327Q0022.pdf
- Serious: Quote sent to both email addresses or it is non-compliant. The quote must go to both named contracting staff by the response due date; the Government is not responsible if it is not received. From Sol_1305M327Q0022.pdf
Show all 11Show fewer
- Worth checking: Three similar renovation projects as prime needed. Experience is scored, and the solicitation asks for at least three completed similar projects from the last three years, with the prime role stated. From Sol_1305M327Q0022.pdf
- Worth checking: Payments only on completed, verified milestones. You may bill only after a milestone is 100% done and accepted, so you carry costs until then; milestones must be at least 30 days apart. From Sol_1305M327Q0022.pdf
- Worth checking: Site visits on November 23, November 24 and November 30. Visits are strongly encouraged, not mandatory: November 23 and 24 at 9 AM CT and November 30 at 12 PM CT; call the Facilities Engineering Technician to attend one. From Sol_1305M327Q0022.pdf
- Worth checking: Davis-Bacon wage rates apply. Construction wage rates (wage determination LA20260044) apply, so labor costs and weekly payroll records must follow them. From Sol_1305M327Q0022.pdf
- Worth checking: Submittals due within 10 days of award. A work schedule, material samples, safety data sheets, a safety and emergency plan and the payment protection are all due within 10 days of award. From 1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx
- Minor: Work in an occupied weather forecast office. Work must minimize disruption to normal operations, with weekday daytime hours only, and the contractor must provide four ADA portable restrooms during the restroom task. From 1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx
- Minor: Questions due December 2, 2026. Questions go by email to both addresses by 12:00 PM CT on December 2, 2026; answers come as an amendment on SAM.gov. From Sol_1305M327Q0022.pdf
- Minor: Amendment 0001 changed the posting. Amendment 0001 only corrected the SAM.gov title, description and state; offers must acknowledge each amendment. From Sol_1305M327Q0022_Amd_0001.pdf
Read from the notice and 4 attachments. Show which files.
- Sol_1305M327Q0022_Amd_0001.pdf (read)
- Sol_1305M327Q0022.pdf (read)
- 1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx (read)
- DBA_WD_LA20260044_Rev_2_5_18_2026.pdf (read)
Full summary
What they want
- Task 1: repair drywall and repaint the whole interior, about 9000 sqft, with at least 2 coats
- Task 2: remove old carpet and adhesive and install new carpet tiles, cove base and transitions, about 2,300 sqft
- Task 3: renovate two restrooms: new epoxy floors (about 168 sqft each), four toilets and four faucets, plus four ADA portable restrooms
- Finish within 120 days of notice to proceed, working Monday to Friday, 7:00 AM to 5:00 PM local time
- Provide a Project Manager and an Onsite Manager, plus a safety plan and an emergency plan
- Email progress updates to NWS leadership every other day
- Give a one-year written warranty on materials and workmanship, plus manufacturer warranties
- Pay rates under the Davis-Bacon Act (federal construction wage rules): wage determination LA20260044
- Contract type
- Firm-fixed-price (FFP) purchase order, one line item (CLIN 0001, 1 Job)
- Period of performance
- 120 days from notice to proceed
- Place of performance
- National Weather Service Forecast Office, 62300 Airport Rd., Slidell, LA 70460-5243
- Estimated value
- Government's estimate: total estimated price range for CLIN 0001 is $116,000.00 to $157,500.00; the Government may award above or below it
- How they'll choose
- Best value based on price and non-price factors; technical factors get confidence ratings (Confident, Some Confidence, Low Confidence); price is evaluated but not rated
- Offers due
- December 9, 2026, 12:00 PM CT
- How to submit
- Email to both sara.brunstetter@noaa.gov and jenna.taulman@noaa.gov, with "RFQ 1305M327Q0022" in the subject line
What they'll judge offers on
- Factor 1, Relevant Experience and Capability: similar renovation work in the last three years, a subcontractor's experience may count
- Factor 2, Management and Project Schedule: (a) project schedule (Gantt chart) with milestone payment values and no front loading, (b) management plan for people and subcontractors
- Price: firm-fixed price for CLIN 0001, checked for completeness, fairness and reasonableness
What to include when you submit
- Send the quote to both email addresses; a quote sent to only one is non-compliant. The Government does not accept responsibility for non-receipt, so ask for a receipt confirmation
- Technical and price quotes are separate documents: Volume 1 (Technical) and Volume 2 (Price)
- Files must be Adobe PDF, 8.5 by 11-inch pages, Times New Roman size 12 or larger; no zip files; no more than 25MB per email; an 11x17 Gantt chart must be exported natively at 11x17
- Factor 1: send at least three fully completed renovation projects of similar size and scope, done in the last three years from the solicitation's issue date
- For each project give: contract number and title, agency or company name with a point of contact (name, email, phone), a statement that you were the prime contractor, final contract dollar value, size of areas worked if known, period of performance, and a short description of the work
- A proposed subcontractor's projects may be used only if it will do a major or critical part of the physical work; name it, give its role, scope and level of effort, its project references, and its licenses and certifications
- Named subcontractors become part of the award; replacing one later needs the Contracting Officer's written approval
- Factor 2: send a management plan and a tentative project schedule (Gantt chart) from notice to proceed through closeout, with a Milestone Payment Value column labeled by CLIN, milestones at least 30 days apart, each tied to a physically verifiable completion event; milestone amounts must add up to the CLIN price
- Factor 2 management plan: name one on-site point of contact with full authority over subcontractors, describe how Government directions and deficiencies reach subcontractors and get fixed within 24 hours, and give a plan to manage or replace non-performing subcontractors
- Volume 2: firm-fixed price for CLIN 0001, LIX WFO Renovations, 1 Job; pricing may be on the SF 1449 or on company letterhead
- Entity information: point of contact name, phone and email; CAGE and UEI numbers; acknowledgement of SAM registration; acknowledgement of each SF 30 amendment; authorized negotiators; certification that representations and certifications were signed by someone who can bind the firm
- The quote must be valid for at least 90 days; the acceptance period on the SF 1449 must run 90 days from the response due date
- The person signing must have authority to commit the firm to all provisions of the quote
After award, you must have
- Payment bond or irrevocable letter of credit for 100% of the contract price, due within 10 days of award; no bid bond is needed From Sol_1305M327Q0022.pdf:
The Contractor shall submit one of the following payment protections: Payment Bond or Irrevocable Letter of Credit.
- A Project Manager and an Onsite Manager named before the project starts (one person may hold both roles) From 1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx:
The contractor will provide the following Key Personnel positions prior to the start of the project.
- Registration in FedConnect (the Department of Commerce web portal used to administer the award) From Sol_1305M327Q0022.pdf:
The contractor must be registered in FedConnect…
- Obtain all licenses, permits and fees needed to do the work From 1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx:
Obtain all licenses, permits, and fees required for completing work…
Not in the notice text
- The wage determination LA20260044 pay rates are in an attached file; confirm the trades and rates that apply to your crew
- Photos of the current state of the restrooms are in the statement of work as images that could not be read; check the attachment on SAM.gov
More to check before you bid
- The notice names requirements:
- The AI summary says this is set aside for small businesses, but SAM.gov lists no set-aside. Check the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- Dept of Commerce NOAA, Seattle, WA
- Product/service code
- S214 · Housekeeping – Carpet Laying/Cleaning
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238330)
- Versions
2 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0001 (this version)Due Dec 9, 2026
- Nov 18, 2026 · SolicitationDue Dec 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- MSB Lab Floor Coating RepairsThe USDA Agricultural Research Service wants the damaged epoxy floor coating repaired and recoated in a second-floor biosafety level 2 (BSL-2) lab at the Eastern Regional…
- JAX and TBW WFO CARPET REPLACEMENT
- Grout Maintenance for the Puget Sound VAThe Department of Veterans Affairs (VA), Network Contracting Office 20, wants quarterly grout and tile floor maintenance, sealing and restoration for about 40,000 square feet of…
- USCG Station Saginaw River Galley FlooringOnly small businesses can bid. The Coast Guard (Base Cleveland) wants old tile removed and new flooring installed in the galley (kitchen) at USCG Station Saginaw River in…
- Flooring Requirement Contract SolicitationSolicitation FA465927Q0001: the Air Force's 319th Contracting Squadron seeks one small business for a firm-fixed-price (FFP) flooring contract at Grand Forks AFB, ND, with a…