Combined Synopsis/Solicitation
GAOA Star Meadows MEP Repairs Utility Installations Flathead NF
Department of Agriculture · Forest Service
Small business set-aside · Whitefish, MT
AI summary Beta
This summary may miss requirements: 4 of 13 attachments weren't read (C05c Updated SOI 1240BH27Q0001.xlsx, C05b Updated Specifications.doc and 2 more). Check the attachments on SAM.gov.
Solicitation 1240BH27Q0001: the USDA Forest Service wants heating, propane, well water and sewer work done at the Star Meadows rental cabin, Flathead National Forest, Whitefish, Montana. Only small businesses can quote, and a bid guarantee of 20 percent of the bid price must come with the quote. The response due date is December 8, 2026, 3:00 PM Mountain. Award goes to the lowest price quote that is technically acceptable, for one firm-fixed-price purchase order.
Who can bid (7)
- Small business. This is a total small business set-aside under NAICS 238220, so only small businesses can quote. From C04 SF1442 1240BH27Q0001.pdf
- Bid guarantee of 20 percent of the bid price with the quote, such as a bid bond backed by a surety the Government accepts. From C04 SF1442 1240BH27Q0001.pdf
- Active SAM.gov entity registration to submit a quote. From C04 SF1442 1240BH27Q0001.pdf
Show all 7Show fewer
- Past performance: list of three similar-size projects completed in the last three years. From C04 SF1442 1240BH27Q0001.pdf
- Boiler heating and hot water system design must go to a Montana certified licensed boiler operator or HVAC professional; the contractor needs at least 5 years of design service experience. From C04d Attachment 4 Drawings 1240BH27Q0001.pdf
- Lead-based paint abatement must be done by contractors specialized or certified under Montana law. From C05a RFI Response 1240BH27Q0001.docx
- The contractor gets all required licenses and permits at its own expense. From C05a RFI Response 1240BH27Q0001.docx
How to submit: Email to the Contracting Specialist at PPS.proposals@usda.gov, with "1240BH27Q0001 1173844 GAOA Star Meadows MEP Repairs Utility Installations at Flathead NF" in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 17, 2026.
- Serious: Total small business set-aside. Only small businesses can quote; the NAICS code 238220 is shown with a $19 million size standard. From C04 SF1442 1240BH27Q0001.pdf
- Serious: Bid guarantee of 20 percent due with the quote. A quote without a proper bid guarantee may be rejected, and performance and payment bonds are also required, so check bonding capacity first. From C04 SF1442 1240BH27Q0001.pdf
- Serious: Price every line or the quote may be rejected. Quotes must price all items, base and option; option items 11, 12 and 13 are lump sums, and the Government decides later whether to use the radiant floor option. From C04 SF1442 1240BH27Q0001.pdf
Show all 11Show fewer
- Worth checking: Same project solicited before with quotes found non-responsive. The Forest Service says earlier quotes for this requirement did not respond to what was asked, so follow the instructions and use only the current documents. From C05a RFI Response 1240BH27Q0001.docx
- Worth checking: Contractor supplies the heating design and licensed designer. Boiler size and heat loads are left to the contractor as a deferred submittal for a turnkey system, which needs a Montana licensed designer. From C05a RFI Response 1240BH27Q0001.docx
- Worth checking: Lead-based paint assumed, abatement in scope. The 1940s cabin is assumed to contain lead-based paint, and abatement and disposal fall to the contractor under EPA and Montana rules. From C05a RFI Response 1240BH27Q0001.docx
- Worth checking: Amendment 0001 must be acknowledged with the quote. Acknowledgment of the amendment must be included with the quote.
- Worth checking: Performance period stated two ways. The statement of work estimates March 2027 through June 29, 2027, while the solicitation gives 10 calendar days to start and 120 calendar days after notice to proceed; ask which governs. From C04b Attachment 2 SOW 1240BH27Q0001.docx
- Minor: Site access and fire restrictions. The access road or cabin driveway may not be passable for extended periods in December, and Hoot Owl fire rules may restrict work. From C05a RFI Response 1240BH27Q0001.docx
- Minor: Davis-Bacon wage rates apply; wage determination not read. Davis-Bacon wage rates must be paid under wage determination MT20260032, whose file is a scanned PDF that could not be read here; check it on SAM.gov. From C04 SF1442 1240BH27Q0001.pdf
- Minor: The site visit was Oct 27, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From C05a RFI Response 1240BH27Q0001.docx
Read from the notice and 9 attachments. 4 of 13 not read. Show which files.
- C05a RFI Response 1240BH27Q0001.docx (read)
- C04 SF1442 1240BH27Q0001.pdf (read)
- C05 SF30 1240BH27Q0001-0001.pdf (read)
- C04b Attachment 2 SOW 1240BH27Q0001.docx (read)
- C05e Star Meadows Site Visit.pdf (read)
- C04g Attachment 7 Site Visit Info 1240BH27Q0001.docx (read)
- C04e Attachment 5 RFI Form 1240BH27Q0001.docx (read)
- C05d StarMeadow Cabin Asbestos Report.pdf (read)
- C04d Attachment 4 Drawings 1240BH27Q0001.pdf (read)
- C05c Updated SOI 1240BH27Q0001.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C05b Updated Specifications.doc: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04c Attachment 3 Specifications 1240BH27Q0001.doc: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04f Attachment 6 General Decision MT20260032.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Hydronic heating (hot-water boiler heat): boiler, pumps, piping and radiant floor loops, with a heating design the contractor submits
- Air heating and distribution: air handler, ducts, grills, sensors and controls
- Propane service: concrete pad, yard lines and piping from a Government-supplied 500-gallon tank, which the contractor moves and connects, plus two new propane fireplaces
- Water supply: sanitary well development, submersible pump, pitless unit (well-casing connector), pipeline and pump controls
- Sewer drain: new drains for a toilet, shower and vanity tied to the existing septic system, with concrete saw-cutting and patching
- Selective demolition, including lead-based paint abatement, new walls, insulation and electrical load center upgrades
- Close-out work: submittals, startup, testing and training listed in specification sections, and final cleanup
- Move and place the Government-furnished crushed aggregate from the Star-Logan quarry
- Contract type
- Firm-fixed-price (one set price, whatever the work ends up costing) purchase order, with base items and option items (radiant floor heat, wall and floor insulation)
- Period of performance
- Start work within 10 calendar days after notice to proceed; work ready for use no later than 120 calendar days after notice to proceed. The statement of work estimates March 2027 through June 29, 2027
- Place of performance
- Star Meadows Rental Cabin and adjacent site and Bunkhouse building, 5250 Star Meadows Road, Whitefish, MT 59937 (not the barn)
- Estimated value
- The SF 1442 gives the magnitude of the requirement as between $100,000 and $250,000
- How they'll choose
- Lowest price technically acceptable (LPTA): only the lowest priced quote is checked for technical acceptability, then the next lowest, until one is acceptable
- Offers due
- December 8, 2026, 3:00 PM Mountain Time
- How to submit
- Email to the Contracting Specialist at PPS.proposals@usda.gov, with "1240BH27Q0001 1173844 GAOA Star Meadows MEP Repairs Utility Installations at Flathead NF" in the subject line
What they'll judge offers on
- Technical Approach (rated acceptable or unacceptable): how you will do all the work, work you plan to subcontract, planned sequencing with major tasks and timelines, and personnel and equipment available
- Past Performance (rated acceptable, neutral or unacceptable): three projects of similar magnitude completed within the last three years
- Price: fair and reasonable, evaluated as total cost of base items plus option items
What to include when you submit
- Send four documents, each as a separate Adobe PDF (the schedule of items can be Excel or PDF)
- Document 1: signed Standard Form 1442 (SF 1442, the form you sign and return as your offer), blocks 14, 15, 16, 17, 20a, 20b and 20c, signed by a person who can bind the firm
- Acknowledge amendment 0001 on the SF 1442 (blocks 19, 20a, 20b, 20c) or in a separate acknowledgment
- Document 2: price proposal on the Schedule of Items (SOI, the priced list of work lines) with offeror name, UEI, date, point of contact name and email filled in
- Price every SOI line; option items 11, 12 and 13 are lump sums with one price each
- Document 3: technical proposal covering technical approach and past performance
- Technical approach: explain how you will do all the work, any work you will subcontract with the subcontractors' experience, planned sequencing with tasks and timelines, and personnel and equipment and their availability
- Past performance: list three projects of similar magnitude finished within the last three years; for each give name and location, point of contact name, phone and email, total cost, and a short narrative with size and start and completion dates
- Document 4: scanned copy of the fully executed bid guarantee, Standard Form 24 with power of attorney, for 20 percent of the bid price
- Hold your prices firm for 90 calendar days from the response due date
- Have an active SAM.gov entity registration to submit a quote
After award, you must have
- Performance and payment bonds are required for the project. From C04 SF1442 1240BH27Q0001.pdf:
BID GUARANTEE, PERFORMANCE AND PAYMENT BONDS ARE REQUIRED FOR THIS PROJECT…
Current contractor
No incumbent is named. The same project was solicited under 1240LU26Q0011 and 1240BH26Q0050, and the Forest Service says the quotes were found non-responsive.
Not in the notice text
- Some documents were attached but not read: the updated Schedule of Items spreadsheet, the updated specifications, the original specifications (Word .doc files), and the Davis-Bacon wage determination MT20260032 (a scanned PDF). Quantities, specification details and wage rates are missing from this brief.
- The middle of the SF 1442 file was not read, so some clauses may be missing here.
- The expected notice to proceed date: the answer points to page 25 of the solicitation, which does not give one.
- The updated Schedule of Items units and quantities for each line, including what each option adds.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA Forest Service, Washington, DC
- Product/service code
- Z2FB · Repair or Alteration of Recreational Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238220)
- Versions
2 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0001 (this version)Due Dec 8, 2026
- Oct 1, 2026 · Combined Synopsis/SolicitationDue Dec 8, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov