The U.S. Army Corps of Engineers Middle East District (SAM.gov agency: Department of the Army, W076 ENDIST MIDDLE EAS(PROVIS)) wants a contractor to build the Apache Alert Mission Complex for the Kuwait Air Force at Ali Al Salem Air Base, Kuwait (solicitation W912ER26RA016). It is a full and open (any business may bid) firm-fixed-price (FFP: one set price, whatever the work ends up costing) design-bid-build construction contract. It has 17 base items and 6 options, and work must finish within 1355 calendar days after notice to proceed. The response due date is January 8, 2027, 12:00 PM UTC-4 (11:00 AM Eastern).
Who can bid
- Be registered in the System for Award Management (SAM.gov) with a valid CAGE code and UEI, and list NAICS 236220 in the registration From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Financial standing: a questionnaire completed and stamped by your bank From Att A Financial Standing Questionnaire.pdf
- Do at least 20 percent of the work on site with your own organization From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
How to submit: Electronic submission of two PDF files; questions go through the Bidder Inquiry process in ProjNet. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Nov 17, 2026.
- Serious: Construction in Kuwait: host-country rules fall on the contractor. Visas, local labor and insurance laws, local licenses, customs and taxes are the contractor's job and risk, and must be priced in; a small U.S. business needs a way to meet them. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Serious: Host-country labor and insurance laws. The contractor must follow local labor and insurance rules, including paying the employer's share of contributions, and price that in. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Serious: Performance and payment bonds required. The winner must provide a construction surety (bonds) after award; a business without bonding capacity for a project this size cannot perform. From Solicitation Amendment - W912ER26RA0160001.pdf
Show all 12Show fewer
- Worth checking: Local licenses for tradesmen and drivers. Special licenses from the local government for mechanics, tradesmen and drivers are the contractor's responsibility. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Worth checking: Host-country taxes and duties are in the price. The price includes all applicable taxes and duties unless the two governments agreed they do not apply, so a bidder must price Kuwaiti taxes in. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Worth checking: Defense Base Act insurance required. Overseas defense workers must be covered by Defense Base Act insurance before notice to proceed. From Solicitation Amendment - W912ER26RA0160001.pdf
- Worth checking: Large project with a 1355-day schedule. Seventeen base items and six options must all be finished within 1355 calendar days after notice to proceed, even the options. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Worth checking: Bank-completed financial questionnaire. A bank must stamp or sign the Financial Standing Questionnaire; failing to provide it may make the proposal non-responsible and remove it from competition. From Att A Financial Standing Questionnaire.pdf
- Worth checking: Required own-forces work on site. The prime must do work equal to at least 20 percent of the total with its own organization on site, which limits how much can be subcontracted. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Worth checking: Davis-Bacon wages likely apply (a general rule). This is the general rule, not something the notice says: federal construction over $2,000 in the U.S. pays at least the Davis-Bacon wage rates in the wage determination attached to the solicitation. This summary doesn't name one: find it on SAM.gov and price your labor from it.
- Minor: Personnel tracking and deployment notices. All workers of the prime and subcontractors at every tier must be entered in SPOT, and the contractor must give the Contracting Officer signed travel warnings and a criminal jurisdiction notice. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
- Minor: Two-volume PDF proposal. Pricing must stay out of the technical volume, and pages over each factor's limit are not evaluated. From Solicitation Amendment W912ER26RA0160002 SF 30.pdf
Read from the notice and 12 attachments. 22 of 34 not read. Show which files.
- Solicitation Amendment - W912ER26RA0160001.pdf (read)
- Solicitation Amendment W912ER26RA0160001 SF 30.pdf (read)
- Solicitation Amendment - W912ER26RA0160002.pdf (read)
- Solicitation Amendment W912ER26RA0160002 SF 30.pdf (read)
- CDC SPECIFICATIONS - VOL 2 OF 5 - DIV 01-08 - 5099974 PKG 1 APACHE FACILITIES.pdf (read)
- CDC SPECIFICATIONS - VOL 3 OF 5 - DIV 09-23 - 5099974 PKG 1 APACHE FACILITIES.pdf (read)
- CDC SPECIFICATIONS - VOL 4 OF 5 - DIV 26-34 - 509974 PKG 1 APACHE FACILITIES.pdf (read)
- AttB_KU-509974-COST BREAKDOWN SHEET_ OCT 21 2026.pdf (read)
- AttB_KU-509974-PROPOSAL SCHEDULE_ OCT 21 2026.pdf (read)
- CID PACKAGE 1 - JULY 2026.pdf (read)
- COVER - VOL 1 OF 5 - CONTRACTING - 509974 PKG 1 APACHE FACILITIES.pdf (read)
- Att A Financial Standing Questionnaire.pdf (read)
- CDC SPECIFICATIONS -VOL 5 of 5 - APPENDICES - APACHE PKG 1 509974.pdf: not read (it couldn't be opened): open it on SAM.gov
- Att B KU-509974-COST BREAKDOWN SHEET_ SEPT 15 2026.pdf: not summarized: open it on SAM.gov
- Att BKU-509974-PROPOSAL SCHEDULE_ SEPT 15 2026.pdf: not summarized: open it on SAM.gov
- Att C Past Performance Overview Sheet.pdf: not summarized: open it on SAM.gov
- Att F Corporate Certificate To Bind.pdf: not summarized: open it on SAM.gov
- Att G Performance Distribution Statement.pdf: not summarized: open it on SAM.gov
- VOL 1 OF 14_GENERAL SITE_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 2 OF 14_FACILITY A_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 3 OF 14_FACILITY C_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 4 OF 14_FACILITY D_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 5 OF 14_FACILITY E_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 6 OF 14_FACILITY F_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 7 OF 14_FACILITY G1_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 8 OF 14_FACILITY H_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 9 OF 14_FACILITY J_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 10 OF 14_FACILITY K_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 11 OF 14_FACILITY M_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 12 OF 14_FACILITY N_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 13 OF 14_FACILITY O_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- VOL 14 OF 14_FACILITY STD_DRAWINGS_CDC_JUL 2026.pdf: not summarized: open it on SAM.gov
- Att D Project Summary Form.pdf: not summarized: open it on SAM.gov
- Att E USACE PPQ Form (2011 Sep).pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Build four alert shelters with aprons, a logistics readiness center, a maintenance supply warehouse with storage shade, a guard house and a pilot readiness center
- Build a petroleum oil lubricant (POL) shed, a fire water pump house with water tank, bunkers, three electrical substations, parking and storage sunshades and a wash rack sunshade
- Build a forward arming and refueling point (FARP) with a rocket and missile barricade option, plus a taxiway from the existing maintenance hangar to the new facilities
- Install all site utilities (stormwater, domestic water, fire water, sanitary sewer with lift station and leach field, electrical and communications) and site development
- Six priced options: alert magazine, rehab west side of the diamond, demolish hardened aircraft shelters, FARP expansion, paved access road to the practice runway, and septic tank #2 with leach field
- Mobilization, demobilization and a site survey (QTY 1 Job each)
- Keep every worker entered in the Army's Synchronized Pre-Deployment Operational Tracker (SPOT) and give the Contracting Officer the required employee notices
- Phase the work to keep airfield and squadron alert and training operations running
- Contract type
- Firm-fixed-price (FFP), design-bid-build construction
- Period of performance
- Begin within 15 calendar days after notice to proceed and finish within 1355 calendar days after notice to proceed; options must be completed within the base contract's period
- Place of performance
- Ali Al Salem Air Base, Kuwait
- Estimated value
- Not stated
- How they'll choose
- Proposals are sent in two parts: a non-price (technical) volume and a price volume; the award method and the order of factors are not in the text read
- Offers due
- January 8, 2027, 12:00 PM UTC-4 (11:00 AM Eastern)
- How to submit
- Electronic submission of two PDF files; questions go through the Bidder Inquiry process in ProjNet
- Page limits
- Each evaluation factor has its own page limit; material over the limit is not evaluated (the limits themselves are not in the text read)
What they'll judge offers on
- Non-price (technical) proposal: Volume I
- Price proposal: Volume II
What to include when you submit
- Send two Adobe PDF files: Volume I (non-price proposal only) and Volume II (price proposal only); keep all pricing out of Volume I
- Number every document and make it searchable
- Put a cover page and a table of contents in each volume; the cover page lists the solicitation number, your name, address, phone, email, UEI, CAGE code and tax ID
- Include a completed Corporate Certificate; for a joint venture, one for each member plus a copy of the joint venture agreement
- Fill out all solicitation attachments, including the Financial Standing Questionnaire (completed by your bank) and the Proposal Schedule
- Do not change the solicitation's terms or add conditions to the offer
After award, you must have
- Performance and payment bonds (a construction surety) after award, within 15 calendar days of award per Amendment 0002 (changed from 14) From Solicitation Amendment - W912ER26RA0160001.pdf:
AND PAYMENT BONDS (SEE CONTRACT CLAUSE 52.228-14 AND 52.228-15).
- Defense Base Act (DBA) insurance (workers' compensation for overseas defense work) after award and before notice to proceed From Solicitation Amendment - W912ER26RA0160001.pdf:
INCLUDE BONDING AND DEFENSE BASE ACT (DBA) INSURANCE AFTER THE CONTRACT…
- Have an English-speaking representative at every work site From Solicitation Amendment W912ER26RA0160002 SF 30.pdf:
…site who has the capability of receiving instructions in the English language, fluently speaking the…
Not in the notice text
- Only part of the solicitation was read: the middle of the amendments and specifications was left out, and Attachments C (Past Performance Overview Sheet), D (Project Summary Form), F (Corporate Certificate to Bind), G (Performance Distribution Statement), the 14 drawing volumes and Volume 5 of the specifications are attached on SAM.gov but not read
- The evaluation factors, their order and the award method are not in the text read; Amendment 0002 changed the wording of Section 00 21 00 (Instructions), so the proposal instructions shown here may be out of date
- Past performance and experience requirements, and how many projects to send, are likely in Attachments C and D, which were not read
- The new proposal due date set by Amendment 0001 is not in the text read; SAM.gov gives January 8, 2027, 12:00 PM UTC-4
- Whether there is a site visit or pre-proposal conference, and the deadline for questions, are not in the text read
- Whether an offer guarantee (bid bond) is required is not in the text read; the form's checkboxes could not be read, so check the SF 1442 on SAM.gov
- Whether a local Kuwaiti office or agent is required, and the currency offers must use, are not in the text read
- No contract value or Government estimate is given
- The SAM.gov set-aside field is blank; the text says full and open
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- W076 ENDIST Middle Eas(PROVIS), Winchester, VA
- Product/service code
- Y1BZ · Construction of Other Airfield Structures
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
8 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0005 (this version)Due Jan 8, 2027
- Nov 17, 2026 · Amendment 0004Due Jan 8, 2027
- Oct 23, 2026 · Amendment 0003Due Jan 8, 2027 (changed)
- Oct 1, 2026 · Amendment 0002Due Oct 30, 2026
- Sep 29, 2026 · Amendment 0001Due Oct 30, 2026
- Sep 29, 2026 · SolicitationDue Oct 30, 2026
- Aug 18, 2026 · Amendment 0001No date on SAM.gov
- Aug 18, 2026 · PresolicitationNo date on SAM.gov
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North DakotaThis is a sources sought (market research, not a request for offers) from the Army Corps of Engineers Omaha District for two projects at Minot Air Force Base, North Dakota:…
- ACC003 Weapons Generation Complex and Northern FlightlineThe U.S. Army Corps of Engineers (USACE), Alaska District, is seeking a design-build team or design-builder for ACC003 Weapons Generation Complex and Northern Flightline at Joint…
- The Mission and Installation Contracting Command (MICC), Fort Campbell, KY, is issuing this Special Notice to identify small business concerns interested in receiving future request for quotations for various construction and related facility-support.