Solicitation
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Department of Homeland Security · U.S. Coast Guard
A newer version of this notice was posted Nov 19, 2026. It moves the due date from Aug 17, 2026 to Dec 1, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 6 of 18 attachments weren't read (ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev2 11-18-2026.xlsx, ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev.1dated 12AUG2026.xlsx and 4 more). Check the attachments on SAM.gov.
Sole source: the Coast Guard (Surface Forces Logistics Center) intends to award solicitation 70Z08526RRJ001B00 to Northern Defense Industries, LLC (NDI), the only authorized U.S. repair vendor for this radar; other firms may still send proposals by the response due date of December 1, 2026, 12:00 PM Eastern. The work is open, inspect and repair services for AN/SPS-75 (TRS-3D) air search radar components used on the National Security Cutter fleet. The contract is a requirements contract: no work happens until an order is issued, with three one-year ordering periods.
Who can bid (5)
- Be the OEM's authorized U.S. repair vendor for this radar; the Government says NDI is the only one
- Active registration in the System for Award Management (SAM) to receive award From Solicitation_70Z08526RRJ001B00.pdf
- Proof of enrollment in E-Verify with the offer From Solicitation_70Z08526RRJ001B00.pdf
Show all 5Show fewer
- One to three relevant past contracts as the prime contractor, completed within the last three years From Solicitation_70Z08526RRJ001B00.pdf
- A project manager (key personnel) who reads, writes and speaks English, with a named alternate, listed in the proposal From ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf
How to submit: Email to Contracting Officer Mark Cap (Mark.Cap@uscg.mil) and Contract Specialist Tatiana Sher (Tatiana.Sher1@uscg.mil); email size limit 5 MB. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 19, 2026.
- Serious: Sole source to Northern Defense Industries, LLC (NDI). The Government says only NDI, the OEM's designated U.S. repair vendor, can do this work, so a small business without that status has little chance of award.
- Serious: Award on other than full and open competition. The Government says it will award to the authorized repair provider, NDI, and the justification says it does not intend to pursue competition. From ATTACHMENT 5_JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION.pdf
- Serious: Only new original OEM parts; no substitutes or drawings. Repairs must use OEM parts and data that the OEM releases only to NDI, so other firms cannot show they can do the work. From Solicitation_70Z08526RRJ001B00.pdf
Show all 10Show fewer
- Worth checking: Ordering period dates differ between documents. The solicitation gives the first ordering period as 10/27/2026 to 10/28/2027, while the statement of work gives Nov 24, 2026 through Nov 23, 2027. Ask the contracting officer which governs. From Solicitation_70Z08526RRJ001B00.pdf
- Worth checking: Past performance window: three years in one place, five in another. Section L asks for contracts completed within three years; Section M says references completed within the last five years. Ask the contracting officer which applies. From Solicitation_70Z08526RRJ001B00.pdf
- Worth checking: Repair price is set after the inspection report. Work on repairs may not start until a firm fixed price and delivery schedule are negotiated; items found beyond economical repair (over 65% of a new item's cost) may be bought new instead. From ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf
- Worth checking: Long delivery times. The statement of work lists 18 to 25 months after receipt of order (ARO) for each item, so cash tied up in repairs and parts may be needed for a long time. From ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf
- Worth checking: Employees must be eligible for a Secret clearance. No clearance is needed now, but the Government may require Secret clearances for all contractor employees later. From ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf
- Worth checking: Date passed (Nov 18, 2026): Latest amendment goes back to earlier document versions. Amendment A00005 replaces the November 18, 2026 statement of work (Rev. 4) with the August 12, 2026 version (Rev. 3) and removes one schedule item. Check which versions apply. From 70Z08526RRJ001B00 Amendment A00005.pdf
- Minor: Response due date was extended earlier. Amendment A00004 moved the response due date from September 17, 2026 to December 1, 2026; Amendment A00005 says it has not changed. From 70Z08526RRJ001B00 Amendment A00005.pdf
Read from the notice and 12 attachments. 6 of 18 not read. Show which files.
- Solicitation_70Z08526RRJ001B00.pdf (read)
- 70Z08526RRJ001B00 Amendment A00005.pdf (read)
- 70Z08526RRJ001B00 Amendment A00004.pdf (read)
- 70Z08526RRJ001B00 Amendment A00003_12AUG2026.pdf (read)
- 70Z08526RRJ001B00 Amendment A00002.pdf (read)
- 70Z08526RRJ001B00 Amendment A00001.pdf (read)
- ATTACHMENT 2_ STATEMENT OF WORK_NDI PROPOSED REV4_18NOV2026.pdf (read)
- ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf (read)
- ATTACHMENT 2_ STATEMENT OF WORK.pdf (read)
- Atttachment 7 - Responses to Questions_12AUG2026.pdf (read)
- ATTACHMENT 5_JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION.pdf (read)
- Attachment 8 Example OpenandInspectionReport sanitized.pdf (read)
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev2 11-18-2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev.1dated 12AUG2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- ATTACHMENT 4_PAST PERFORMANCE INFORMATION FORM.docx: not summarized: open it on SAM.gov
- ATTACHMENT 3_REQUEST FOR CLARIFICATION FORM.pdf: not summarized: open it on SAM.gov
- ATTACHMENT 6_WAGE DETERMINATION.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Open, inspect and report on each radar component sent in, in an open and inspection report (OIR: a teardown report on the item's condition and the recommended fix)
- Repair or overhaul each approved item back to ready-for-issue condition, using only new original equipment manufacturer (OEM) parts
- Test the items, install applicable field changes and firmware upgrades, and send test data with each item
- Preserve (items are stored up to two years), pack, mark and bar-code each item, then ship to the Coast Guard warehouse in Curtis Bay, MD
- Price every line in the schedule of supplies, plus a six-month extension; estimated quantities are for pricing only
- Provide a project manager as the single point of contact; the Government may name more key personnel at award
- Contract type
- Requirements contract with firm-fixed-price (FFP: one set price, whatever the work costs) task orders; award on other than full and open competition to NDI
- Period of performance
- Three one-year ordering periods (dates differ between the solicitation and the statement of work; see red flags); the proposal also prices a six-month extension
- Place of performance
- SAM.gov gives Baltimore, MD, USA. The statement of work says the primary place of performance will be at the contractor's facilities. A bidder's question says the OEM would do the work in Germany; the Coast Guard's answer refers to NDI work before and after shipping to Germany.
- Estimated value
- Not stated
- How they'll choose
- Best value to the Government among conforming offers; one contract will be awarded. Basis for award is technical capability and fair and reasonable pricing.
- Offers due
- December 1, 2026, 12:00 PM Eastern
- How to submit
- Email to Contracting Officer Mark Cap (Mark.Cap@uscg.mil) and Contract Specialist Tatiana Sher (Tatiana.Sher1@uscg.mil); email size limit 5 MB
- Page limits
- Cover letter: 1 page. Technical capability statement: 15 pages. Table of contents, figures and tables are not counted.
What they'll judge offers on
- Technical Capability: (a) Resources & Facilities, (b) Quality Assurance (repaired back to OEM specifications), (c) Delivery
- Past Performance: (a) Quality of Services, (b) Schedule, (c) Management
- Price: checked for reasonableness against the Government's cost estimate, purchase history and other pricing data; total evaluated price is the sum of the schedule's line prices
What to include when you submit
- Cover letter (1 page): address, point of contact, Unique Entity ID, Taxpayer Identification Number, and written confirmation that the anticipated award date is acceptable and the period of performance is enough to finish the work.
- Price: fill in the schedule of supplies (Attachment 1) in Excel with unit and extended prices for every item, unrounded, plus the six-month extension. Send an electronically signed PDF and the Excel file.
- Technical capability statement (15 pages): cover Resources & Facilities, Quality Assurance and Delivery, and include the OEM standard warranty.
- Past performance: identify at least one but not more than three relevant (similar in nature, scope and complexity) and recent (completed within the last three years) contracts performed as the prime contractor, each on Attachment 4. If none is within three years, state the reason.
- Signed Standard Form 1449 (SF 1449: the form you sign and return as your offer): complete blocks 12, 17a and 30a, b and c.
- Signed copies of each amendment (SF 30), if applicable.
- Proof of enrollment in E-Verify (the federal employment eligibility check).
- List of subcontractors, with name, address, contact, phone and the percentage of work each will do, if any.
- Necessary fill-ins and certifications in the provisions, and a statement of the extent of agreement with the solicitation's terms.
- Number every page and label it 70Z08526RRJ001B00 AN/SPS-75 Air Search Radar System (repair services); 8 1/2 x 11 paper, one-inch margins, single spacing at least.
- Offers are accepted for 90 days. The Government intends to award without discussions.
After award, you must have
- Employees must be eligible for a Secret clearance; the Government may require clearances later (no clearance is needed now) From ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf:
…all Contractor employees provided for this requirement must be eligible for a Secret Clearance.
Current contractor
No active contract exists; repairs have been done as needed. One earlier simplified-acquisition order, 70Z08524P39027B00, went to NDI for $235,890.08 to repair three line items. A separate Coast Guard headquarters award, 70Z04425FC2PL0008, went to NDI for on-site technical services. The sources sought notice (October 28 to November 12, 2025) drew two responses: NDI and TSS Solutions, which the Coast Guard found not authorized.
Not in the notice text
- The schedule of supplies spreadsheets (Attachment 1), which hold the line items, estimated quantities and units, were attached but not read. Which version applies is unclear after Amendment A00005.
- The middle of the solicitation (about 77,000 characters of clauses and certifications) and the middle of each statement of work were left out of what was read.
- Attachment 4 (past performance form), Attachment 3 (request for clarification form) and Attachment 6 (wage determination) were attached but not read.
- The Coast Guard answered that a wage determination is needed; which wage rate applies is in Attachment 6.
- Estimated quantities and units of issue for each line are not in the text read, so what a bid must price is unclear.
- Government cost estimate and contract value are not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Jul 23, 2026
- Notice type
- Solicitation
- Office
- SFLC Procurement Branch 2(00085), Alameda, CA
- Product/service code
- J059 · Maint/Repair/Rebuild of Equipment – Electrical and Electronic Equipment Components
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811210)
- Versions
8 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0007Due Dec 1, 2026
- Aug 24, 2026 · Amendment 0006Due Dec 1, 2026 (changed)
- Aug 12, 2026 · Amendment 0005Due Sep 17, 2026
- Aug 12, 2026 · Amendment 0004Due Sep 17, 2026
- Aug 3, 2026 · Amendment 0003Due Sep 17, 2026 (changed)
- Jul 23, 2026 · Amendment 0002 (this version)Due Aug 17, 2026
- Jul 15, 2026 · Amendment 0001Due Aug 17, 2026 (changed)
- Jul 15, 2026 · SolicitationDue Aug 18, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation