Combined Synopsis/Solicitation
FCI Oxford - Water Softener
Department of Justice · Federal Prison System / Bureau of Prisons
Small business set-aside · Grand Marsh, WI
More open Federal Prison System / Bureau of Prisons contracts
A newer version of this notice was posted Nov 10, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 1 of 5 attachments weren't read (Attachment 1 26Z4AS1 SOW APPRV.pdf). Check the attachments on SAM.gov.
Only small businesses can bid on request for quotation (RFQ) 15BBNF26Q00000039c, with a response due date of December 4, 2026, 4:00 PM Eastern. The Federal Bureau of Prisons (Field Acquisition Office), for FCI Oxford in Grand Marsh, WI, wants the old water softeners removed and one new centralized water softener installed, with a brine tank at the water tower. One firm-fixed-price (FFP: one set price, whatever the work ends up costing) award goes to the lowest priced technically acceptable offer, and a bid bond (a surety company's guarantee that you will sign the contract if you win) must come with the offer.
Who can bid (4)
- Small business set-aside: only small businesses can bid (NAICS 221310) From 15BBNF26Q00000039.pdf
- Bid bond (SF 24) with the offer, for 20 percent of the bid price, not to exceed $3,000,000 From 15BBNF26Q00000039.pdf
- Insurance during the work: workers compensation and employer's liability $100,000; general liability $500,000 per occurrence for bodily injury; automobile liability $200,000 per person, $500,000 per occurrence for bodily injury and $20,000 for property damage From 15BBNF26Q00000039.pdf
Show all 4Show fewer
- Active SAM.gov registration From 15BBNF26Q00000039.pdf
How to submit: Email to rcalandra@bop.gov. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 10, 2026.
- Serious: Total small business set-aside. Only small businesses can bid; larger firms are shut out. From 15BBNF26Q00000039.pdf
- Serious: Bid bond due with the offer. A bid bond of 20 percent of your bid price (up to $3,000,000) must come with the offer, and a missing item makes the offer unresponsive. From 15BBNF26Q00000039.pdf
- Serious: Performance and payment bonds after award. Two bonds, each for 100 percent of the contract price, are due within 10 days after award; you need a surety ready before you bid. From 15BBNF26Q00000039.pdf
Show all 11Show fewer
- Serious: Three separate items required, or the offer is rejected. The SF 1449, the SF 24 bid bond and the technical summary must each be clearly separate, and a missing item makes the offer unresponsive. From Instructions to Offerors.pdf
- Worth checking: Statement of Work needs SAM.gov access. The Statement of Work is controlled; request access on SAM.gov to see the scope, schedule and equipment details before pricing.
- Worth checking: Construction wage rates apply. The construction wage rate clauses mean you must pay at least the rates in the attached wage determination and keep payroll records. From 15BBNF26Q00000039.pdf
- Worth checking: Security clearance packages for all workers. Only the prime contractor may submit the packages for its own and subcontractor workers, and workers who fail the check cannot enter the prison. From 15BBNF26Q00000039.pdf
- Worth checking: Insurance minimums. Workers compensation, general liability and automobile liability must be carried at the stated minimums for the whole job. From 15BBNF26Q00000039.pdf
- Minor: Work inside a correctional facility. Entry and exit routines can shorten the working day, and the Government takes no responsibility for the lost hours. From 15BBNF26Q00000039.pdf
- Minor: No site visit, but one clause mentions it. The instructions say there is no pre-bid site visit, while clause FAO-0006 refers to a pre-bid conference and site visit; confirm with the contracting officer. From Instructions to Offerors.pdf
- Minor: Contractor pays all taxes. No tax exemption certificate will be issued, so build taxes into your price. From 15BBNF26Q00000039.pdf
Read from the notice and 4 attachments. 1 of 5 not read. Show which files.
- Instructions to Offerors.pdf (read)
- 15BBNF26Q00000039.pdf (read)
- Attachment 3 Bid Bond.pdf (read)
- Attachment 2 Wage Determination WI20250015.pdf (read)
- Attachment 1 26Z4AS1 SOW APPRV.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- CLIN 0001, 1 JB (job): remove the existing water softening system and install a new centralized water softening system under the Statement of Work (a contract line item number, CLIN, is one priced line of the order)
- Remove the existing commercial-grade water softeners at the institution
- Pipe through and install the new centralized water softener and all associated components, with the brine tank and softener at the water tower, treating water right off the water main
- Provide all materials, labor, equipment and incidentals
- Send submittals (shop drawings, product data and similar items) for the COR's approval within 10 calendar days after work starts, or as the Contracting Officer sets
- Attend the pre-construction conference and monthly progress meetings at the site
- Give 10 working days of written notice before the final inspection, then close out with the listed documents (as-built drawings, warranties, manuals, releases)
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing; single award; lowest price technically acceptable
- Place of performance
- FCI Oxford, 350 Elk Avenue, Oxford, Wisconsin, in the notice text; SAM.gov and the SF 1449 give Grand Marsh, WI (County Road & Elk Avenue, Grand Marsh, WI 53936)
- Estimated value
- Project magnitude between $250,000.00 and $500,000.00 (the Government's stated range)
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest priced offer that meets the technical requirements wins
- Offers due
- December 4, 2026, 4:00 PM Eastern
- How to submit
- Email to rcalandra@bop.gov
What they'll judge offers on
- Technical: a summary of the technical process you will use to do the work under the Statement of Work (rated acceptable or not)
- Price: the amount filled in on page 4 of the SF 1449
What to include when you submit
- Send three items, clearly separated: (1) the SF 1449 (Standard Form 1449, the form you sign and return as your offer), (2) the SF 24 bid bond, (3) a technical summary
- On the SF 1449, fill in block 17a with name, email, UEI (the ID number from your SAM.gov registration) and phone number, plus blocks 30a, 30b and 30c, and the amount on page 4
- Complete the Standard Form 24 (SF 24) bid bond; it can be emailed, and the seal must be visible in the scanned document
- Send a summary of the technical process you will use to complete the work in accordance with the Statement of Work
- If any of the three items is missing, the offer is considered unresponsive and not accepted
After award, you must have
- Performance bond and payment bond, each for 100 percent of the contract price, within 10 days after award From 15BBNF26Q00000039.pdf:
Within 10 days after award the contractor shall execute and submit to the…
- Background and security check forms for every employee who will work on site (criminal history check, CJIS name check, pre-employment questionnaire, release of information) From 15BBNF26Q00000039.pdf:
BOP Contractor Pre-employment Questionnaire…
Not in the notice text
- The Statement of Work (Attachment 1, 26Z4AS1 SOW APPRV.pdf) is attached on SAM.gov but not read here; it is controlled, so request access on SAM.gov. Scope details, equipment size and the schedule may be in it.
- The performance period is not stated; the clause that sets the number of calendar days is left blank in the solicitation.
- The wage rates in Attachment 2, Wage Determination WI20250015, could not be read here; check them on SAM.gov.
- No question deadline is given in the documents.
- Whether a pre-construction or pre-bid site meeting will be held is not clear; the instructions say there is no pre-bid site visit.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 6, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Fao, Grand Prairie, TX
- Product/service code
- Z1AZ · Maintenance of Other Administrative Facilities and Service Buildings
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221310)
- Versions
3 versions have been posted, newest first.
- Nov 10, 2026 · Amendment 0002Due Dec 4, 2026
- Nov 10, 2026 · Amendment 0001Due Dec 4, 2026
- Nov 6, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 4, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Re-Activation of Snake River Water PumpThe Air Force's 366th Contracting Squadron (366 CONS) wants a firm-fixed-price (FFP: one set price, whatever the work costs) quote under solicitation FA489727Q0004 to re-activate…
- IDIQ | Deionization Water System Maintenance and SupportThe Department of Veterans Affairs Network Contract Office 4 wants maintenance and support for the deionized (DI) and reverse osmosis (RO) water system at the Erie VA Medical…
- Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of OahuDLA Energy, with the U.S. Army, plans to hand over ownership of the water distribution system at U.S. Army Garrison-Hawaii on Oahu (Schofield Barracks) to a private or public…
- Reverse Osmosis, Deionization Equipment and PE Water Softene 2026-2027
- Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for InformationSources sought notice 15B70027PR000089 from the Federal Bureau of Prisons (BOP), National Acquisitions, for market research only.