Combined Synopsis/Solicitation
Forest Wide Decommissioning Project
Department of Agriculture · Forest Service
Small business set-aside · Roosevelt, AZ
AI summary Beta
This summary may miss requirements: 3 of 10 attachments weren't read (C04_Attachment 2 - Schedule of Items.xlsx, C04_Attachment 7 - Schoolhouse Campground Drawing.pdf and 1 more). Check the attachments on SAM.gov.
The U.S. Forest Service, for the Tonto National Forest, wants a small business to demolish and haul away old campground buildings and pavement under solicitation 127EAX27Q0013. Only small businesses can bid. Sites in the Tonto Basin Ranger District are the base bid and Globe Ranger District sites are options. Work must be finished within 150 calendar days after notice to proceed. The response due date is December 7, 2026, 1:00 PM Central.
Who can bid (4)
- Small business set-aside: only small businesses can bid From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
- Arizona asbestos abatement contractor license for the bidder or its subcontractor, with a copy submitted From C04_Attachment 3 - Specifications.pdf
- Three similar projects completed in the last three years, rated acceptable or neutral on past performance From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
Show all 4Show fewer
- Key personnel with relevant experience and a letter of intent for assignment to this project From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
How to submit: Email to Contracting Officer Troy McCullough at troy.mccullough@usda.gov, with the solicitation number in the name of each document. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 18, 2026.
- Serious: Small business set-aside. Only small businesses can bid on this total small business set-aside. From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
- Serious: Asbestos abatement license and permits. The specifications call for a licensed asbestos abatement contractor, and the contractor must file the state demolition permit; a business without that license needs a licensed subcontractor. From C04_Attachment 3 - Specifications.pdf
- Worth checking: Asbestos rules name both Arizona and New Mexico. The asbestos section asks for an Arizona license but also names the New Mexico Environment Department and a New Mexico license; ask the contracting officer which governs. From C04_Attachment 3 - Specifications.pdf
Show all 8Show fewer
- Worth checking: Price every base and option item. A proposal without prices for the base period and all option items is excluded from further consideration. From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
- Worth checking: Davis-Bacon wages apply. Construction wage rates under the Davis-Bacon Act apply; the wage determination (Attachment 8) is a scanned file that wasn't read, so check it on SAM.gov before pricing labor. From Sol_127EAX27Q0013_Amd_0001.pdf
- Worth checking: Hazardous material testing and permits fall on the contractor. Asbestos and lead-based paint may be present, and the contractor must test for them and obtain the permits, yet the specifications also say hazardous materials are not expected. From C04_Attachment 3 - Specifications.pdf
- Minor: The site visit was Nov 16, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf
- Minor: Remote work sites and limited hours. Work is at campgrounds spread across two ranger districts, and construction is limited to normal working hours unless the contracting officer agrees otherwise. From C04_Attachment 3 - Specifications.pdf
Read from the notice and 7 attachments. 3 of 10 not read. Show which files.
- Sol_127EAX27Q0013_Amd_0001.pdf (read)
- C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf (read)
- C04_Attachment 1 - Statement of Work.pdf (read)
- C04_Attachment 3 - Specifications.pdf (read)
- C04_Attachment 4 - Directional Maps.pdf (read)
- C04_Attachment 5 - Google Earth Capture-maps.pdf (read)
- C04_Attachment 6 - Indan Point Drawing.pdf (read)
- C04_Attachment 2 - Schedule of Items.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04_Attachment 7 - Schoolhouse Campground Drawing.pdf: not summarized: open it on SAM.gov
- C04_Attachment 8 - Wage Determination.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Tear down toilet buildings, entry stations, fish cleaning stations, sidewalks and other campground structures, and dispose of the debris outside the National Forest
- Pump out and remove septic tanks and vault toilets, cap sewer lines, and remove leach fields
- Pulverize loop asphalt in place to a depth of 12 inches, remove culverts, and re-contour the ground to natural grade
- Get the demolition and asbestos permits, test for asbestos and lead-based paint, and write a stormwater pollution prevention plan where needed
- Return ramadas and picnic tables to the Forest Service
- Base bid: Tonto Basin Ranger District campgrounds. Option bid: Globe Ranger District, including Jones Water Campground
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing); one award planned
- Period of performance
- Period of performance 12/14/2026 to 12/13/2027 per Amendment 0001; start work within 10 calendar days of notice to proceed and finish within 150 calendar days after it; base bid plus option bid items
- Place of performance
- Tonto Basin Ranger District (base) and Globe Ranger District (option), Tonto National Forest, Arizona; SAM.gov lists Roosevelt, AZ
- Estimated value
- Not stated
- How they'll choose
- Highest technically rated proposal wins, if its price is fair and reasonable and past performance is acceptable or neutral; no trade-offs against price
- Offers due
- December 7, 2026, 1:00 PM Central
- How to submit
- Email to Contracting Officer Troy McCullough at troy.mccullough@usda.gov, with the solicitation number in the name of each document
- Page limits
- Factor 1 Work Plan: 10 pages; Factor 2 Key Personnel: 3 pages; Factor 3 Performance Schedule: 6 pages
What they'll judge offers on
- Factor 1, Work Plan / Capability of the Offeror (up to 10 pages): ability to do the work, planned subcontracting, sequencing of work, people and equipment, site-specific safety plan
- Factor 2, Key Personnel (up to 3 pages): relevant experience, letter of intent, list of staff, crews and years of experience
- Factor 3, Performance Schedule (up to 6 pages): critical path schedule showing completion within the 150-day period
- Price: pricing on the Schedule of Items for the base and all option items, checked for fair and reasonable
- Past Performance: acceptable, neutral or unacceptable rating from three similar projects
What to include when you submit
- Send three separate PDF documents: the signed offer on Standard Form 1442 (SF 1442, the construction solicitation and offer form), the price proposal on Attachment 2 Schedule of Items, and the technical proposal covering technical approach and past performance
- Complete SF 1442 blocks 10 fill-ins, 14, 15, 16, 17, 20a, 20b and 20c, signed by a person who can bind the firm, and acknowledge Amendment 0001
- Price every item on the Schedule of Items, base and option; a proposal missing any is excluded; include any quantity or prompt-payment discounts
- Past performance: list three projects of similar magnitude completed within the last three years, with name and location, point of contact, total cost, and a short narrative with size and dates
- Key personnel: include a letter of intent for assignment to this project, job titles and years of experience, number of crews and people per crew
- Performance schedule: a network diagram, critical path method schedule or Gantt chart in calendar days showing the critical path
- Work plan: say what work you will subcontract, give sequencing, resources, subcontractors and their experience, and a site-specific safety plan
- Hold your prices firm for 90 calendar days after the response due date
Current contractor
No incumbent, follow-on or previous contract is named.
Not in the notice text
- Attachment 2 Schedule of Items (the price spreadsheet), Attachment 7 Schoolhouse Campground Drawing and Attachment 8 Wage Determination were attached but not read (the drawing and wage determination are scanned files); item quantities, price lines and Davis-Bacon rates are in them
- Whether performance and payment bonds or an offer guarantee are required: the form's blocks and the clause checkboxes couldn't be read, so check the form on SAM.gov
- Whether the November 16, 2026 site visit is required; the text only says it is scheduled
- The Government's estimate or budget is not given
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA-FS, CSA Southwest 7, Albuquerque, NM
- Product/service code
- P500 · Salvage – Demolition of Structures/Facilities (Other Than Buildings)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238910)
- Versions
2 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0001 (this version)Due Dec 7, 2026 (changed)
- Oct 29, 2026 · Combined Synopsis/SolicitationDue Nov 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Latest amendment note (Amendment 1) from SAM.gov
Similar open opportunities
- Camptonville Housing DecommissioningThe Forest Service wants a small business to demolish six old housing buildings on the Tahoe National Forest at Camptonville, Wild Plum and North Bloomfield, California,…
- GAOA BRF Roofing Project Bitterroot National ForestThe U.S. Forest Service (Bitterroot National Forest) wants a roofing contractor to replace three roofs (a garage shop and two West Fork buildings) plus one optional historic…
- Upper Mississippi River Restoration (UMRR) Pool 12 Floodplain Forest Stage One (1) - Habitat Rehabilitation and Enhancement Project (HREP)The U.S. Army Corps of Engineers, Rock Island District, issued sources sought notice W912EK27T0002 to find construction businesses that can build the Upper Mississippi River…