Solicitation
Electron Storage Ring D2 Dipole Magnets
Department of Energy
AI summary Beta
This summary may miss requirements: 2 of 6 attachments weren't read (Enclosure 1- Draft Contract No. 462499.zip, Step Files.zip). Check the attachments on SAM.gov.
Request for proposal 462499 from Brookhaven Science Associates, LLC (BSA), which runs Brookhaven National Laboratory for the Department of Energy, for the design and production of 195 electron storage ring D2 dipole magnets (194 production magnets and 1 first article magnet) for the Electron-Ion Collider in Upton, NY. Addendum No. 1 moves the response due date to December 22, 2026, 5:00 PM Eastern, from December 8, 2026. Award is by best value, with technical factors more important than price.
Who can bid (5)
- Reach at least 60 of 100 technical points to be considered technically responsive From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
- Experience producing magnet assemblies for high accuracy applications, or similar projects with tight tolerances and challenging tooling From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
- Key personnel with relevant experience, shown by resumes From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
Show all 5Show fewer
- Quality assurance program in place, with an approved QA program or manual From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
- SAM.gov registration, or a completed AMS Form 050 if foreign or not registered From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
How to submit: Email: one copy of the technical proposal (Volume 1) and one copy of the business and price proposal (Volume 2), as separate volumes, to the Senior Contracts Specialist, Cindy Blanchard, at cblanchar@bnl.gov. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
From the version posted Nov 20, 2026.
- Serious: Design changes are coming. Addendum No. 1 says design changes are coming and step files are posted; the changes themselves were not in the documents read, so scope and price may move.
- Serious: Large, technical, multi-year order. A first article magnet plus 194 production magnets with option pricing across 2027 to 2032 needs tight-tolerance core and coil production, vacuum impregnation, and in-house testing, which is hard for a small shop. From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
- Worth checking: Strong past performance and staffing needed. Past performance and experience are worth 30 of 100 points, and a proposal under 60 points total is dropped. BSA may also contact other national laboratories. From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
Show all 7Show fewer
- Worth checking: Payment terms differ between documents. The request says payment is net to be determined from acceptance under a milestone schedule; the pricing sheet says Net 30 for large or foreign firms and Net 10 for small businesses. Ask which governs. From Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx
- Minor: Response due date extended to December 22, 2026. Addendum No. 1 extends the response due date to December 22, 2026, 5:00 PM EST, from December 8, 2026, which is still the date in the original request; use the addendum date.
- Minor: Prices must include freight, duties and taxes, in U.S. dollars. Total price must cover taxes, fees, customs and duties, with delivery to Upton, New York. From Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx
- Minor: Possible pre-award site visits and discussions. BSA may visit offerors' sites before selection and may award without discussion, so the first proposal should be the best one. From B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf
Read from the notice and 4 attachments. 2 of 6 not read. Show which files.
- RFP 462499 APP 00539 Addendum No 1 11 19 2026.pdf (read)
- B1. Request for Proposal EIC ESR D2 Dipole Magnets 11.05.2026.pdf (read)
- Enclosure 3- Proposal Pricing Sheet- AMS-Form-043.docx (read)
- Enclosure 2- Annual Representations- AMS-FORM-050.pdf (read)
- Enclosure 1- Draft Contract No. 462499.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Step Files.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Detailed magnet engineering design and production of 195 electron storage ring D2 dipole magnets (194 production plus 1 first article magnet)
- Fabricate magnet cores to tight tolerances, with tooling, coils, insulation and vacuum impregnation (epoxy soaked in under vacuum)
- Assemble, inspect, test and pack the magnets for shipping
- Run a quality assurance program with shop floor travelers (records that follow each part), calibration and configuration control
- Deliver FOB destination (delivered to the buyer's site) to Brookhaven National Laboratory, Upton, New York, on the delivery schedule in the draft contract
- Convert the buyer's CREO Parametric 8.0 model files (.STP, .ASM, .PRT) into your own machine tool formats
- Contract type
- Best value contract (subcontract under BSA's prime contract with the Department of Energy); a draft contract is attached but not read. The pricing sheet has a first article price, a base price for 32 production magnets and an option price for 162 production magnets.
- Period of performance
- Not stated in the documents read; the delivery schedule is in the draft contract, which was not read. Option pricing is requested by year from 2027 to 2032.
- Place of performance
- Upton, NY (delivery to Brookhaven National Laboratory)
- Estimated value
- Not stated
- How they'll choose
- Best value trade-off: award can go to other than the lowest price or the highest technical score. Technical factors combined are more important than price; price is not scored. A proposal must score at least 60 of 100 technical points.
- Offers due
- December 22, 2026, 5:00 PM Eastern
- How to submit
- Email: one copy of the technical proposal (Volume 1) and one copy of the business and price proposal (Volume 2), as separate volumes, to the Senior Contracts Specialist, Cindy Blanchard, at cblanchar@bnl.gov
What they'll judge offers on
- Fabrication Method and Plan: 30 points (method of fabrication of parts; program management and manufacturing plan)
- Prior Experience and Past Performance Producing Magnet Assemblies for High Accuracy Applications: 30 points (experience and past performance; key project personnel)
- Manufacturing, Inspection, and Testing Capability: 30 points (production facility; inspection and test capability)
- Quality Assurance (QA): 10 points
- Price: not scored, a significant factor in the best value trade-off
What to include when you submit
- Volume 1 (technical, tabbed): Tab 1 general overall summary (not scored); Tab 2 compliance matrix for each section of the statement of work and technical specification down to the 3rd and 4th levels; Tab 3 fabrication method and plan; Tab 4 prior experience and key personnel; Tab 5 manufacturing, inspection and testing capability; Tab 6 quality assurance
- Volume 2 (business and price, tabbed): corporate profile with three most recent audited financial statements; draft contract acceptance; price and milestone schedule on the proposal pricing sheet (Enclosure 3); delivery acceptance; payment terms and freight; small business subcontracting plan if required; representations and certifications; government property statement
- Prior experience: list projects of similar type or greater complexity in the past seven (7) years, with customer names, pictures, drawings and descriptions
- Give a minimum of three (3) customer references for different projects of similar complexity, with name, title, organization, address, phone and email
- Send resumes for key personnel: Project Engineer, Magnetic Field Simulation Specialist, Design Engineering (tooling), Machine Shop Supervisor, Inspector, and Quality Assurance
- Include a Gantt chart (a schedule chart) of key milestones and activities in the manufacturing plan
- Send the QA program or manual with a list of implementing procedures and a current organizational chart linking quality staff to management
- Proposals in English only, and prices in U.S. dollars only, inclusive of all taxes, fees, customs and duties
- Proposals stay firm for 120 days after the due date
- Foreign vendors or firms not registered in SAM.gov return AMS Form 050 (Representations and Certifications); firms registered in SAM state so in the proposal
- Large or foreign firms expecting an offer over $900,000 submit a small business subcontracting plan; small or foreign firms need not
- Questions in writing by email to cblanchar@bnl.gov no later than five business days before the proposal due date
- Quantities for pricing: first article magnet, base price for 32 production magnets, option price for 162 production magnets, and steel for 194 magnets (total tons and price per ton)
- Mark any proposal data you want protected with the legends the request gives, plus yellow highlighting
Current contractor
No incumbent is named. Estimated award date in the request is March 25, 2027.
Not in the notice text
- The draft contract (Enclosure 1), with the statement of work, technical specification, drawings, and delivery schedule, is in Enclosure 1- Draft Contract No. 462499.zip, attached but not read.
- The step files (3D design files) posted by the addendum are in Step Files.zip, attached but not read; the upcoming design changes are not described in the documents read.
- Contract term, delivery dates, and any set-aside are not stated in the documents read; SAM.gov shows no set-aside.
- The Government's estimate or budget is not given.
- Whether work can be done remotely is not stated; the work is physical manufacturing.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- Brookhaven Natl Lab -DOE Contractor, Upton, NY
- Product/service code
- AJ15 · General Science & Technology R&D SVCS; General Science & Technology; R&D Facilities & Maj Equip
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 332999)
- Versions
3 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0002 (this version)Due Dec 22, 2026
- Nov 19, 2026 · Amendment 0001Due Dec 22, 2026 (changed)
- Nov 5, 2026 · SolicitationDue Dec 8, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETSThe University of California, for the Department of Energy's Lawrence Berkeley National Laboratory (LBNL), wants five BENDB and five BENDC bending magnets built to LBNL's…
- WFE Solenoid/Corrector Magnet SparesFermi Forward Discovery Group, which runs Fermi National Accelerator Laboratory (Fermilab, a Department of Energy lab) in Batavia, IL, wants firm-fixed-price proposals to design…
- HSR HF Dipole and Quad SC Magnet PS and QuenchSources Sought APP00730MB is a request for information, with no solicitation yet.
- MQ-4C Panel Storage RackThe Naval Air Warfare Center Aircraft Division Lakehurst wants Panel Storage Racks, part number (P/N) 4106AS0110-1, for the MQ-4C Triton drone.
- Hose Assembly, NonmetalThe Defense Logistics Agency (DLA) office DLA WEAPONS SUPPORT wants quotes on national stock number (NSN: the federal catalog number for a part) 4720011296081, HOSE…