Combined Synopsis/Solicitation
Kelly Pierson OSS
Department of Health and Human Services · Indian Health Service
Small business set-aside · Shelton, WA
AI summary Beta
This summary may miss requirements: 1 of 8 attachments weren't read (4-Location Aerial.pdf). Check the attachments on SAM.gov.
The Indian Health Service (Division of Engineering Services, Seattle) wants a small business to install a replacement septic system at a private home at 3891 W. Skokomish Valley Rd., Shelton, Mason County, Washington, under solicitation 75H70127Q00001. It is a total small business set-aside, firm-fixed-price (FFP: one set price, whatever the work ends up costing) construction contract with 45 calendar days to finish after the notice to proceed (NTP: the Government's written order to start work). The response due date is November 30, 2026, 2:00 PM CT. Quoters must be Mason County certified septic installers and must furnish payment and performance bonds.
Who can bid (5)
- Small business under NAICS 237110 (size standard: average annual revenue under $45.0 million over three years); the set-aside is total small business From A11 Pre-Solicitation SAM Notice.pdf
- Mason County certified septic installer From B01 75H70127Q00001.pdf
- Payment and performance bonds From B01 75H70127Q00001.pdf
Show all 5Show fewer
- Active registration in the System for Award Management (SAM) From A11 Pre-Solicitation SAM Notice.pdf
- Insurance: workers' compensation with employer's liability of at least $100,000; general liability of at least $500,000 per occurrence; automobile liability of at least $200,000 per person, $500,000 per occurrence and $20,000 property damage From B01 75H70127Q00001.pdf
How to submit: Email a PDF quote to Robert.Miller2@ihs.gov, the contracting officer. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Oct 29, 2026.
- Serious: Total small business set-aside. Only small businesses can bid; for NAICS 237110 that means average annual revenue under $45.0 million over three years. From B01 75H70127Q00001.pdf
- Serious: Mason County certified septic installer required. A business without this county certification cannot be evaluated for award, so confirm you hold it before pricing. From B01 75H70127Q00001.pdf
- Serious: Payment and performance bonds required. A bid guarantee is not required, but bonds are, even on a job estimated at $25,000 to $100,000; the bond amount and the days to furnish them are not stated in the text read here. From B01 75H70127Q00001.pdf
Show all 12Show fewer
- Worth checking: Install window June to October, plus dry weather. The system may only be installed from June to October unless the septic designer approves because of soil moisture, and five continuous dry days are needed first unless the COR waives it. From 1-Statement of Work.docx
- Worth checking: Davis-Bacon wages and weekly payrolls. Davis-Bacon wage determination WA20260085 (residential, Mason County) applies, and the prime contractor must send weekly payrolls on Department of Labor form WH-347 for itself and any subcontractors. From B01 75H70127Q00001.pdf
- Worth checking: No scheduled site visit. No organized site visit is held, yet quoters are urged and expected to inspect the site; contact the homeowner at your own discretion if you want to see the site. From B01 75H70127Q00001.pdf
- Worth checking: Completion time includes submittals and cleanup. The 45 calendar days cover submittals, approvals and final cleanup, and work must start within 10 calendar days after the notice to proceed is received. From B01 75H70127Q00001.pdf
- Minor: Tank compartments differ between documents. The technical specifications call for 2-compartment tanks, but the statement of work and price schedule describe single-compartment tanks; ask the contracting officer which governs. From 3-Technical Specifications.pdf
- Minor: Notice type and number differ in the attached pre-solicitation file. SAM.gov lists a combined synopsis/solicitation, but the attached pre-solicitation notice says it is not a request for offers and gives solicitation number 75H70126700001 instead of 75H70127Q00001; follow the solicitation form. From A11 Pre-Solicitation SAM Notice.pdf
- Minor: Buy American rules for construction materials. Tanks, pipe and the pump must be domestic construction material unless an exception is approved, so confirm supplier origin before pricing. From B01 75H70127Q00001.pdf
- Minor: Superintendent on site at all times. A project superintendent with authority to act for the contractor must be present whenever work is being done, which a small crew must plan for. From B01 75H70127Q00001.pdf
- Minor: Questions go only to the contracting officer. Written questions are due no later than 7 days before the response due date, and the COR and other staff must not be contacted directly. From B01 75H70127Q00001.pdf
Read from the notice and 7 attachments. 1 of 8 not read. Show which files.
- A11 Pre-Solicitation SAM Notice.pdf (read)
- B01 75H70127Q00001.pdf (read)
- 3-Technical Specifications.pdf (read)
- 1-Statement of Work.docx (read)
- 2-Septic Design.pdf (read)
- 5-Measurement and Payment.pdf (read)
- 6-US DOL WD WA20260085 Dated 5-18-2026.pdf (read)
- 4-Location Aerial.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Install about 30 LF (linear feet) of 4-inch PVC sewer pipe and one underground two-way cleanout (QTY 1 EA, each).
- Install one 1,200-gallon concrete trash tank (QTY 1 LS, lump sum) and one concrete advanced treatment unit (ATU: a tank that cleans wastewater before the drainfield), NuWater BNR-500 or equivalent (QTY 1 LS).
- Install one 1,200-gallon concrete pump tank with a Liberty Pumps 280 Series 1/2-hp submersible effluent pump or equivalent, and a control panel (QTY 1 LS).
- Install 2-inch PVC Schedule 40 effluent transport pipe (30 LF) and a manifold with valve box (QTY 1 LS).
- Build a pressurized gravel trench drainfield with 1.25-inch PVC Schedule 40 laterals (300 LF).
- Pump, decommission and abandon the existing septic tank in place (QTY 1 LS), plus mobilization and demobilization (QTY 1 LS).
- Send the contracting officer's representative (COR) product information and any material changes at least five days before construction, and warranties and swing-tie measurements with the payment invoice.
- During work: keep a project superintendent on site, send daily reports and weekly payrolls, submit a safety plan, attend the preconstruction meeting, and deliver as-built drawings.
- Contract type
- Firm-fixed-price (FFP) construction contract, bought as a request for quotes (RFQ) under FAR Parts 13 and 36 procedures
- Period of performance
- 45 calendar days from the notice to proceed; work must start within 10 calendar days after the notice is received
- Place of performance
- 3891 W. Skokomish Valley Rd., Shelton, WA 98584, Mason County (a private home on fee land)
- Estimated value
- Government's estimated magnitude of construction: between $25,000 and $100,000
- How they'll choose
- Price only: price is the deciding factor among quotes that meet the terms of the request for quotes
- Offers due
- November 30, 2026, 2:00 PM CT
- How to submit
- Email a PDF quote to Robert.Miller2@ihs.gov, the contracting officer
What they'll judge offers on
- Price: the Total Firm Fixed Price in block 17 of Standard Form 1442 (SF 1442), the construction solicitation, offer and award form
- Compliance with the terms and conditions of the request for quotes, including holding all certifications needed for the work
What to include when you submit
- Complete SF 1442, blocks 14 through 20c, and acknowledge every amendment in block 19.
- Fill out the Section B price schedule in its entirety: ten contract line item numbers (CLINs: priced lines of the order) and the total firm-fixed price.
- Include the Davis-Bacon wage determination wages in all pricing (Davis-Bacon is the federal prevailing wage law for construction).
- Show that you are a Mason County certified septic installer.
- If the quote uses foreign construction material, include the Buy American exception request and price comparison table with the quote, or get a determination from the contracting officer before quotes are due.
- Send questions in writing to the contracting officer, with firm name, address, phone, and the asker's first and last name and position, no later than 7 days before the response due date.
- A bid guarantee is not required.
Not in the notice text
- The septic design drawings and the location aerial were not readable here: 4-Location Aerial.pdf is attached but not read, and 2-Septic Design.pdf showed only a short note from the septic designer. Check both on SAM.gov.
- Part of the solicitation form's clause list (Section I) was left out of the text read here; check the full clause list on SAM.gov.
- The bond amounts and the number of days after award to furnish the payment and performance bonds.
- The calendar date questions are due: the documents say only 7 days before the response due date.
- The planned award date and when the notice to proceed will be issued.
More to check before you bid
- SAM.gov's text for this notice doesn't describe the work. The work is described in its attachments, listed under Notice details.
Notice details
Notice type, codes, versions and files
- Posted
- Oct 29, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Div of Engineering SVCS - Seattle, WA
- Product/service code
- Y1NZ · Construction of Other Utilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside