Solicitation
Dino Replace Swing Arm Gates
Department of the Interior · National Park Service
AI summary says small business set-aside · Dinosaur National Monument, Utah and 3 more places (from the AI summary)
A newer version of this notice was posted Nov 9, 2026. It moves the due date from Nov 18, 2026 to Dec 1, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 3 of 11 attachments weren't read (Sign-In_Sheet_0002.pdf, B08_RFQ_Attachment_5_-_Road_Gate1.pdf and 1 more). Check the attachments on SAM.gov.
Only small businesses can send quotes on solicitation 140P1426Q0113: the National Park Service, Intermountain Region Northern Rockies office, wants 11 metal pipe swing gates (gates that swing open on posts) replaced across Dinosaur National Monument in Utah and Colorado. It is a request for quotation (RFQ: you send a price quote, not a sealed bid) for one firm-fixed-price lump sum (FFP: one set price, whatever the work ends up costing), and the lowest fair price wins. Quotes are due December 1, 2026, 1:00 PM Mountain, with work running December 20, 2026 to October 30, 2027.
Who can bid (4)
- Small business set-aside: only small businesses can bid. NAICS 236220 with a $45 million size standard, listed in your SAM.gov representations and certifications and met at quote and award. From Sol_140P1426Q0113.pdf
- Active SAM.gov registration with a unique entity identifier (UEI) at quote, at award and throughout the contract From Sol_140P1426Q0113.pdf
- Own, operate or maintain a place of business that regularly does construction work with experienced staff From Sol_140P1426Q0113.pdf
Show all 4Show fewer
- Firms that helped develop the design or specifications for this construction work cannot take part in the award From Sol_140P1426Q0113.pdf
How to submit: Email only, to Contracting Officer Sally Leitch at sally_leitch@ios.doi.gov. Subject line: solicitation number, project name and number of emails, e.g. "140P6426Q0113 – Swing Arm Gates Replacement – email 1 of 2".. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Nov 9, 2026.
- Serious: SAM.gov and the solicitation disagree on the set-aside. SAM.gov lists no set-aside, but the solicitation the AI read says a set-aside for small businesses. Ask the contracting officer which applies before you bid.
- Serious: Small businesses only. The notice is a total small business set-aside, so a firm that is not small under the $45 million size standard for NAICS 236220 cannot win. From Sol_140P1426Q0113.pdf
- Serious: Funds are not yet available. No award will be made until funds are available, and the Government can cancel before or after the closing date without paying bidders' costs. From Sol_140P1426Q0113.pdf
Show all 12Show fewer
- Worth checking: Quotes over the magnitude may be dropped. Amendment 0001 raised the magnitude from $25,000 to $100,000 up to $100,000 to $250,000; quotes above it may be found non-compliant, so price with that range in mind. From Sol_140P1426Q0113_Amd_0001.pdf
- Worth checking: Gate counts differ between documents. The SF 18 page says 5 double-leaf and 6 single-leaf gates, while the statement of work says 6 double and 5 single. The price list also says to remove 12 gates, install 11 and pour footings for 22, so confirm the counts before pricing. From Sol_140P1426Q0113.pdf
- Worth checking: Contractor must field-verify every gate. Locations and sizes are not final, and some Government-furnished pipe may not be enough, so you may have to buy extra material inside your fixed price. From Sol_140P1426Q0113.pdf
- Worth checking: Liquidated damages for late completion. A late finish costs a set amount per day, which matters on a small fixed-price job. From Sol_140P1426Q0113.pdf
- Worth checking: Completion time worded differently from the dates. Clause 52.211-10 says completion about 315 days after notice to proceed, while the amendments give a period ending October 30, 2027. Ask the Contracting Officer which governs. From Sol_140P1426Q0113.pdf
- Worth checking: The site visit was Nov 5, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140P1426Q0113.pdf
- Minor: Response due date extended several times. The RFQ's own pages show October 30, 2026 and Amendment 0002 shows November 18, 2026; Amendment 0003 now sets the response due date at December 1, 2026, 1:00 PM Mountain. From Sol_140P1426Q0113_Amd_0003.pdf
- Minor: Email-only quotes, timed at the Contracting Officer's inbox. A quote counts as received when it is time-stamped in the Contracting Officer's mailbox, and late quotes are not accepted, so leave time for large files. From Sol_140P1426Q0113.pdf
- Minor: Remote work sites. Gates are spread across park roads and campgrounds, and the contractor must bring its own portable toilets and keep roads open to visitors. From B08_RFQ_Attachment_1_-_DINO_Swing_Arm_Gates_Replacement_SOW.docx
Read from the notice and 8 attachments. 3 of 11 not read. Show which files.
- Sol_140P1426Q0113_Amd_0003.pdf (read)
- Sol_140P1426Q0113_Amd_0002.pdf (read)
- Sol_140P1426Q0113_Amd_0001.pdf (read)
- Sol_140P1426Q0113.pdf (read)
- B08_RFQ_Attachment_1_-_DINO_Swing_Arm_Gates_Replacement_SOW.docx (read)
- B08_RFQ_Attachment_2_-_DINO_344849_APPENDIX_A_-_Map_of_Barricade_Locations.pdf (read)
- B08_RFQ_Attachment_3_-_Wage_Determinationn_UT20260103_dated_5-18-26_Unitah_Co__UT.pdf (read)
- B08_RFQ_Attachment_4_-__Wage_Determinationn_CO20260013_5-18-2026_Moffat_Co___CO.pdf (read)
- Sign-In_Sheet_0002.pdf: not summarized: open it on SAM.gov
- B08_RFQ_Attachment_5_-_Road_Gate1.pdf: not summarized: open it on SAM.gov
- B08_RFQ_Attachment_6_-_Price_Schedule_Breakdown.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Remove existing metal pipe swing gates, posts, footings, signs and reflectors, and legally dispose of them
- Build and install new gates to match earlier DINO gates: 11 gates per the statement of work, with new gate posts and gate leaves (the swinging panels), field-painted OSHA Safety Yellow
- Pour new concrete footings, and install 72 bollards (short posts) on their own footings
- Install new road signs and reflectors that meet the Manual on Uniform Traffic Control Devices
- Use Government-furnished steel pipe and weld-on hinges, and supply any extra materials the Contracting Officer approves
- Supply 4 portable toilets with weekly cleaning, haul away and dump debris, and provide a hazardous materials, quality control and site-specific safety plan
- Verify all gate locations and measurements yourself before pricing, and keep roads open to the public during work
- Work 7 a.m. to 4:30 p.m. Monday through Friday unless the Contracting Officer approves otherwise
- Contract type
- Firm-fixed-price purchase order, one lump-sum line (CLIN 10, Replace Swing Arm Gates)
- Period of performance
- December 20, 2026 to October 30, 2027 per Amendments 0001 and 0003 (the RFQ gave November 20, 2026 to September 30, 2027). Work must start within 5 calendar days after the notice to proceed (NTP).
- Place of performance
- Dinosaur National Monument, Utah and Colorado (Uintah County, Utah and Moffat County, Colorado); the SAM.gov place field is blank
- Estimated value
- Magnitude of construction (the Government's price range) is $100,000 to $250,000 per Amendment 0001; the RFQ first gave $25,000 to $100,000
- How they'll choose
- Lowest price that is fair and reasonable, under simplified acquisition procedures (FAR Part 12). The Government plans to award without exchanges with bidders, and the Contracting Officer will also review past performance and responsibility before award.
- Offers due
- December 1, 2026, 1:00 PM Mountain
- How to submit
- Email only, to Contracting Officer Sally Leitch at sally_leitch@ios.doi.gov. Subject line: solicitation number, project name and number of emails, e.g. "140P6426Q0113 – Swing Arm Gates Replacement – email 1 of 2".
- Page limits
- No page limit given. Pages are 8.5 x 11 inches, with foldouts up to 11 x 17 inches; each email with attachments must stay under 25MB.
What they'll judge offers on
- Price: must be fair, reasonable and not unbalanced across line items
- Quote meets all submission requirements and stays within the magnitude of construction
What to include when you submit
- Send everything as one PDF titled "QUOTE PACKAGE", with the quote checklist page first
- Include the signed SF 18 (Standard Form 18, Request for Quotation), completing blocks 8 A-F, 13 A-F and 16 A-C
- Sign each amendment (0001, 0002 and 0003) and include them in the package
- Complete provisions 52.209-11, 52.209-13 and 52.225-2 and clause 52.225-9
- Fill in the price schedule in Section A and Attachment 6 (Price Schedule Breakdown): one all-inclusive firm fixed price, rounded to the nearest dollar
- Include contractor core data: name, address, UEI (unique entity identifier), CAGE code, business size, authorized signer and business point of contact
- Keep the quote valid for at least 120 days
- A written waiver request to use paper instead of the IPP (Invoice Processing Platform) payment system must come with the quote
After award, you must have
- Liability insurance naming the United States as an insured, with a certificate given to the Contracting Officer before work starts From Sol_140P1426Q0113.pdf:
$500,000.00 each occurrence…
Current contractor
No incumbent is named. The statement of work says the new gates will match gates installed in a separate earlier project, but it does not name that contractor.
Not in the notice text
- Attachment 6 (Price Schedule Breakdown spreadsheet), the scanned Attachment 5 road gate file and the sign-in sheet are attached but not read; the middle of the RFQ and of the statement of work were left out of what was read, so some requirements may be missing.
- Quote questions are due 3 calendar days after the organized site visit, but the notice does not say which site visit that counts from.
- Wage rule: Davis-Bacon applies through clause 52.222-6. Two wage determinations are attached, UT20260103 (Uintah County, Utah) and CO20260013 (Moffat County, Colorado), but their text didn't come through; check the files on SAM.gov for rates.
- Whether work may be done remotely is not stated.
- The Contracting Officer's email in the statement of work is a placeholder; use sally_leitch@ios.doi.gov from the RFQ.
More to check before you bid
- The notice names requirements:
- The AI summary says this is set aside for small businesses, but SAM.gov lists no set-aside. Check the notice before you bid.
- SAM.gov's text for this notice doesn't describe the work. The work is described in its attachments, listed under Notice details.
Notice details
Notice type, codes, versions and files
- Posted
- Oct 29, 2026
- Notice type
- Solicitation
- Office
- Imr Northern Rockies(12200), Yellowstone National Park, WY
- Product/service code
- Z2LB · Repair or Alteration of Highways/Roads/Streets/Bridges/Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
4 versions have been posted, newest first.
- Nov 9, 2026 · Amendment 0003Due Dec 1, 2026 (changed)
- Nov 9, 2026 · Amendment 0002Due Nov 18, 2026
- Oct 29, 2026 · Amendment 0001 (this version)Due Nov 18, 2026 (changed)
- Sep 23, 2026 · SolicitationDue Oct 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Modernize 6N Inpatient Restrooms (Swing for 3N)Only certified service-disabled veteran-owned small businesses (SDVOSB) listed in the Small Business Administration (SBA) veteran certification database can bid on solicitation…