Combined Synopsis/Solicitation
X209 Mazak FUSE System FY27
Department of Energy
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov.
Request for proposal RFP510922: UT-Battelle (the company that runs Oak Ridge National Laboratory for the Department of Energy) wants one integrated Mazak FUSE manufacturing system, or a domestic equivalent, delivered and installed at its Manufacturing Demonstration Facility in Knoxville, Tennessee. The response due date is November 27, 2026, 3:00 PM EST. One award, lowest price among technically acceptable offers; delivery is 13 to 14 months after receipt of order.
Who can bid
- Be listed on the company's Evaluated Supplier List (ESL) before award; listing requires a documented quality assurance program From RFP510922.pdf
- Domestic end products: offeror must list as foreign end products any items manufactured outside the United States that do not qualify as domestic From RFP510922.pdf
- Keep an active SAM.gov registration, which the RFP strongly encourages so small business status can be checked From RFP510922.pdf
Things to watch (8)
- Serious: SAM.gov and the solicitation disagree on the set-aside. SAM.gov lists no set-aside, but the solicitation the AI read says a set-aside for small businesses. Ask the contracting officer which applies before you bid.
- Serious: Must be on the Evaluated Supplier List before award. A vendor not yet on the company's supplier list must pass a quality audit first, which can take time and can stop an award. From RFP510922.pdf
- Worth checking: No exceptions allowed to the statement of work. Under lowest price technically acceptable, an offer that is unacceptable on any factor is out. Exceptions can make an offer non-responsive. From RFP510922.pdf
Show all 8Show fewer
- Worth checking: Large equipment build with 13 to 14 month delivery. This is a multi-machine system with design review, assembly, runoff testing, delivery and installation, so it suits an equipment maker or an authorized dealer. From Attachment A - Statement of Work - Mazak FUSE System.pdf
- Worth checking: Deliveries to the site must be made by a U.S. citizen. A foreign national driver will not be allowed on the Oak Ridge site, so plan delivery staff and carriers accordingly. From Attachment E - Fixed Price Subcontract - Draft.pdf
- Minor: Open to all business sizes. The RFP is not a small business set-aside, so small firms compete with large ones on price. From RFP510922.pdf
- Minor: Questions were due Nov 20, 2026. Check the amendments for the agency's answers. From RFP510922.pdf
- Minor: Subject to a government price audit. The company says the price proposal may be audited, so keep supporting cost records. From RFP510922.pdf
Read from the notice and 10 attachments. Show which files.
- RFP510922.pdf (read)
- Attachment A - Statement of Work - Mazak FUSE System.pdf (read)
- Attachment B - Terms-Conditions-Commerical-Products-and-Services-BSD-CS-2146-09.30.2026.pdf (read)
- Attachment C - Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf (read)
- Attachment D - Reps-and-Certs-Abbreviated - 2026.03.09.pdf (read)
- Attachment E - Fixed Price Subcontract - Draft.pdf (read)
- Attachment F - Representations Regarding Small Business Subcontracting Plan (BSD-CS-2125) - 10.01.2025.pdf (read)
- Attachment G - Certification-Exemption-from-SCLS-Certain-Services-BSD-CS-2049-08.20.2025.pdf (read)
- Attachment H - BSD-CS-2290-C-SCRM-Questionnaire.pdf (read)
- Attachment I - Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf (read)
Full summary
What they want
- One Mazak VC-EZ20X subtractive machine, one wire arc additive manufacturing (WAAM) station and two blank machine stations, each with option packages
- Five pallet changer modules, five connection modules to the pallet management controller (PMC), and one two-level PALLETECH system with 32 pallets
- Customized system layout, engineering, and an interface connection to the heat treatment module (the module itself is not included)
- Design review, general assembly, and pre-shipment runoff testing at your facility
- Deliver, install and support final acceptance at the Knoxville facility
- Provide the milestone documents: design review package, assembly completion, runoff results, installation and as-installed configuration
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) subcontract under the Department of Energy prime contract
- Period of performance
- Anticipated subcontract period of performance is TBD; delivery is due within 13 to 14 months after receipt of order, then installation per an approved schedule
- Place of performance
- Seller's facility (or approved subcontractor facility) for fabrication, assembly and runoff; delivery, installation and acceptance at ORNL Manufacturing Demonstration Facility, Knoxville, Tennessee
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): award to the responsible bidder with the lowest-priced offer that meets all requirements
- Offers due
- November 27, 2026, 3:00 PM EST (from the version posted Nov 13, 2026; amended since)
What they'll judge offers on
- Technical acceptability: provide the requested items and services per Attachment A, the statement of work, with no exceptions
- Technical acceptability: assurance that you are already on the ORNL Evaluated Suppliers List or can pass a quality audit
- Price: lowest price among technically acceptable offers
What to include when you submit
- Send a technical proposal and a separate price proposal, plus sections for exceptions or non-compliance and for conditions and assumptions
- Technical proposal: describe the system configuration and equipment quantities, the integration approach for the machine stations, pallet changers, PMC connections, PALLETECH system and heat treatment interface, and the design review submittals
- Technical proposal: cover facility, utility and installation prerequisites, runoff testing and final acceptance, technical deliverables, and a schedule from design review through final acceptance that confirms delivery within 13 to 14 months after receipt of order
- Confirm warranty and service support, and list exceptions, assumptions, optional features, consumables not included, and software limitations
- Include a quality manual or other documents showing a quality control and assurance program
- Price in U.S. dollars on a firm-fixed-price basis, state tariffs separately, and show a unit price and total price for each item; a milestone payment plan may be proposed
- Include a company profile with business size classification, signing authority contacts, and the offeror's business information
- Submit in MS Excel, MS Word or PDF, and keep the offer valid for 120 days
- If the proposal exceeds $15,000, return the Representations and Certifications - Abbreviated form (BSD-CS-2260) and list any foreign end products with their country of origin
- Large businesses with an offer of $900,000 or more must send a small business subcontracting plan; others send the representations form on small business subcontracting plans
- Acknowledge any amendment in writing and send all questions only to the procurement officer, Rian Lewis (lewisgr@ornl.gov)
Not in the notice text
- How to send the proposal (email address, portal) is not stated in the text read; ask the procurement officer
- Attachments B (terms and conditions) and C (prime contract flow-down clauses) were only partly read; the middle of each was left out
- The contract's value or budget is not given
- Whether a site visit will be held is not stated
- The subcontract period of performance is listed as TBD
Notice details
Notice type, codes, versions and files
- Posted
- Nov 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Ornl Ut-Battelle LLC-DOE Contractor, Oak Ridge, TN
- Product/service code
- 3417 · Milling Machines
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 333517)
- Versions
2 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0001 (this version)Due Nov 27, 2026
- Nov 13, 2026 · Combined Synopsis/SolicitationDue Nov 27, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
UT-Battelle LLC's Defense Manufacturing Program Office (DMPO) requires an integrated manufacturing system consisting of subtractive machining, wire arc additive manufacturing (WAAM), blank machine stations, pallet changer modules, and a two-level PALLETECH system with associated engineering and interfaces per Attachment A - Statement of Work - Mazak FUSE System or domestic equivalent.
Similar open opportunities
- CNC Large Vertical Milling CenterDLA Aviation Richmond (Defense Logistics Agency) plans to buy one computer numerically controlled (CNC) large vertical milling center, with installation, for work in Coronado,…
- Small CNC Vertical Milling MachineThe Air Force's Arnold Engineering Development Complex (AEDC) is asking businesses to say they can supply two new small CNC vertical milling machines, delivered to Arnold Air…
- L7WE01 Hybrid Laser TrimmerOnly small businesses can bid on solicitation FA857127Q0025_Hybrid_Laser_Trimmer (total small business set-aside).
- Two (2) hard bearing, dual-drive, horizontal balancing machines.Defense Logistics Agency (DLA) Aviation, for DLA Weapons Support Richmond, is running a sources sought (market research, not a request for quotes) for two turn-key horizontal…