AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 1 of 9 attachments weren't read (Site Visit Sign-In Sheet.pdf). Check the attachments on SAM.gov.
Only quoters that attended the mandatory site visit are evaluated, and the quote is due December 16, 2026, 12:00 PM Central. The U.S. Department of Agriculture's Agricultural Research Service (ARS), for its Livestock Arthropod Pest Research Unit in Kerrville, Texas, wants a cattle dip vat and drip pad replaced at the Edinburg, Texas site. It is a total small business set-aside request for quotation (RFQ), judged on lowest price among technically acceptable quotes.
Who can bid (5)
- Small business: this is a total small business set-aside under NAICS 236220
- Be under the $45M small business size standard
- Attended the mandatory site visit; only these vendors' quotes are evaluated From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
Show all 5Show fewer
- Bid guarantee for a quote above $150K, at least 20 percent of the price and no more than $3,000,000 From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
- Acceptable or neutral past performance; unacceptable past performance disqualifies the quote From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
How to submit: Not fully stated in the text read. The Standard Form 1442 (SF 1442, the construction solicitation form) lists spencer.hamilton@usda.gov and says not to submit quotes by regular mail.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 17, 2026.
- Serious: Mandatory site visit; only attendees are evaluated. The solicitation text read says only vendors that attended the mandatory site visit are evaluated, and the sign-in sheet was posted in Amendment 0002; a business that did not attend may be shut out. From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
- Serious: Total small business set-aside. Only small businesses under the $45M size standard can bid.
- Serious: Bid guarantee needed for quotes above $150K. A quote above $150K must come with a bid bond or other guarantee of at least 20 percent of the price, and a missing guarantee means rejection in most cases. From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
Show all 8Show fewer
- Worth checking: Completion time differs: 240 days or 180 days after Notice to Proceed. The specifications say 240 consecutive calendar days; the schedule says 180 days after Notice to Proceed. Ask the contracting officer which applies. From Attachment 2 Specifications Rev1.pdf
- Worth checking: Alternate 1 is described differently in two documents. The SF 1442 schedule calls CLIN 0002 Alternate 1 a red-oxide finish; the specifications make Alternate 1 corral pens 9, 10 and 11, and galvanizing Alternate 2. From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
- Worth checking: Davis-Bacon wage rule applies; attached wage determination lists other counties. Construction wage rate clauses apply, but the attached determination TX20260087 lists counties including Kerr and does not name the Edinburg area; ask which determination governs. From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf
- Worth checking: Key solicitation text was not read. Parts of the instructions to quoters, the specifications and the drawings, and the scanned site visit sign-in sheet were not read, so more requirements may apply.
- Minor: Design estimate is above programmed funds. The Design Analysis puts the base bid estimate above the full construction funding, so price pressure or scope changes are possible. From Attachment 5 Design Analysis Rev1.pdf
Read from the notice and 8 attachments. 1 of 9 not read. Show which files.
- SF30_12P4CA27Q0006_0002.pdf (read)
- SF30_12PCA27Q0006_0001.pdf (read)
- Attachment 2 Specifications Rev1.pdf (read)
- Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf (read)
- Attachment 5 Design Analysis Rev1.pdf (read)
- Attachment 6 DOL TX20260087_2026_05_18.pdf (read)
- Attachment 3 Drawings Rev1.pdf (read)
- Attachment 4 Drawing Blackout Panel.pdf (read)
- Site Visit Sign-In Sheet.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Demolish the existing roofing, canopy, rail fencing and gates, block structure, sump pit, water piping and electrical and lighting at the dip vat area, as shown in the drawings
- Extend the rigid frame, install 8-inch purlins and a new exposed-fastener metal roof over reflective insulation
- Build metal fence railing and gates for the corrals, plus a reinforced concrete walking surface with a rough broomed finish
- Alter the existing dip vat in concrete as shown in the drawings
- Install plumbing to the watering troughs and new power and lighting
- Price the base bid and the additive alternates: pens 9, 10 and 11 (Alternate 1 in the specifications) and galvanized fencing, gates and bollard steel (Alternate 2)
- Provide a construction schedule, daily quality control records, shop drawings and a one-year construction warranty
- Contract type
- Request for quotation (RFQ) for commercial construction under FAR Part 12; each priced line is one lump sum (1 LS)
- Period of performance
- Specifications: complete all work within 240 consecutive calendar days after Notice to Proceed. The schedule says delivery 180 days after Notice to Proceed (see red flags).
- Place of performance
- USDA ARS Livestock Arthropod Pest Research Unit, 22675 N Moorefield Road, ARS Building 6419, Edinburg, TX 78541
- Estimated value
- Programmed construction funding of $1,000,000 and a design estimate of $1,031,810 for the base bid, $48,855 for Additive Alternate No. 1 and $22,182 for Additive Alternate No. 2, per the Design Analysis (Government's estimate)
- How they'll choose
- Lowest price technically acceptable (LPTA), among quotes from vendors that attended the mandatory site visit. Only the lowest priced quote is checked for technical acceptability first, then the next lowest if it fails.
- Offers due
- December 16, 2026, 12:00 PM Central
- How to submit
- Not fully stated in the text read. The Standard Form 1442 (SF 1442, the construction solicitation form) lists spencer.hamilton@usda.gov and says not to submit quotes by regular mail.
What they'll judge offers on
- Technical Acceptability: a sound, compliant approach that meets all requirements, rated acceptable or unacceptable
- Technical Experience: recent, relevant experience, including subcontractors, on similar projects in size, scope and complexity
- Past Performance: acceptable or neutral rating needed; unacceptable disqualifies
- Price: total of the base item and all options, checked for fair and reasonable
What to include when you submit
- Price CLIN 0001 (Replacement Dip Vat and Drip Pad) and CLIN 0002 (Alternate 1) as lump sums; the total of options is added to the base for evaluation
- Provide past performance examples that show scope, dollar value, complexity and nature of effort, with a detailed explanation, period of performance, project location, and a valid email, point of contact and telephone number
- Contractor Performance Assessment Reporting System (CPARS) evaluations may be sent to meet the past performance requirement
- Hold prices firm for 90 calendar days from the date offers are due
- Acknowledge Amendments 0001 and 0002 by letter or electronic communication that names the solicitation and amendment numbers
- Send a bid guarantee on Standard Form 24 (SF 24) with a quote above $150K, in an amount of at least 20 percent of the price, up to $3,000,000
After award, you must have
- Payment and performance bonds within 10 days after notification of award for awards over $150,000 From Attachment 1 SF1442 Terms and Conditions 124PCA27Q0006.pdf:
Payment and Performance bonds are due no later than 10 days after notification of award.
- Supervisors need 30-hour OSHA training and other workers 10-hour OSHA training, with records sent before work starts From Attachment 2 Specifications Rev1.pdf:
Supervisors shall have completed the 30-hour OSHA training.
Not in the notice text
- The middle of the solicitation terms and conditions (including parts of the quote instructions), the specifications and the drawings was not read, and the Site Visit Sign-In Sheet is a scanned file with no text read; the full documents are on SAM.gov
- The date, time and meeting place of the mandatory site visit are not in the text read
- How many past performance examples to send, any page limits, and the question deadline are not in the text read
- How and where to deliver the quote is not fully stated in the text read
- Whether the wage determination TX20260087 applies to the Edinburg site
Notice details
Notice type, codes, versions and files
- Posted
- Nov 4, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA ARS Afm Apd, Beltsville, MD
- Product/service code
- Y1JZ · Construction of Miscellaneous Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0002Due Dec 16, 2026
- Nov 5, 2026 · Amendment 0001Due Dec 16, 2026
- Nov 4, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 16, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside