Combined Synopsis/Solicitation
Propulsor Device Machining
Department of Defense · Department of the Navy
Small business set-aside · Place not listed
AI summary Beta
Combined synopsis/solicitation N0016727Q1004 from the Naval Surface Warfare Center Carderock Division (NSWC Carderock), Department of the Navy: machine nickel aluminum bronze (NAB) propulsor piece parts for VIRGINIA Class submarines, from material the Government supplies. Only small businesses can bid (total small business set-aside), and the work requires Cybersecurity Maturity Model Certification (CMMC) Level 2. The response due date is December 1, 2026, 12:00 PM Eastern. It is one firm-fixed-price award covering eight part lines (675 each of three S1L parts, 160 each of five R4 parts) plus one lot of non-recurring engineering, with delivery to Bethesda, Maryland and Kittery, Maine.
Who can bid (6)
- Small business: this is a total small business set-aside, so only small businesses can bid.
- Size: the notice states the NAICS code 336611 and a size of 1300 employees.
- Cybersecurity Maturity Model Certification (CMMC) Level 2; a posted answer says the prime and any subcontractor must hold the same level. From N0016727Q10040001.pdf
Show all 6Show fewer
- A quality management system that follows ISO 9001:2015, written down and kept up. From N0016727Q10040001.pdf
- Machining capability for nickel aluminum bronze and tungsten parts, with measuring equipment calibrated to a national standard.
- Active registration in the System for Award Management (SAM) with current representations and certifications, a CAGE code, and registration in Wide Area WorkFlow (WAWF) for invoicing. From N0016727Q10040001.pdf
How to submit: Email to Michael Bonaiuto at michael.j.bonaiuto.civ@us.navy.mil. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 17, 2026.
- Serious: Total small business set-aside. Only small businesses can bid; the notice gives NAICS 336611 with a size of 1300 employees.
- Serious: CMMC Level 2 required for prime and subcontractors. A business without CMMC Level 2 cannot be awarded; a subcontractor must hold the same level as the prime. The contract also carries the defense clause on protecting covered defense information. From Questions And Answers.docx
- Worth checking: Drawings must be requested by email. The drawings are not posted on SAM.gov; a bidder needs them to price the work and they carry a distribution restriction (Distribution C).
Show all 11Show fewer
- Worth checking: Questions were due Nov 19, 2026. Check the amendments for the agency's answers.
- Worth checking: Delivery date differs between documents. The PWS says deliveries run through July 18, 2027, but the delivery schedule lists July 30, 2027 for every line. Confirm which date applies. From N0016727Q10040001.pdf
- Worth checking: Shim ring quantity unclear. The schedule says 160 Each for R4 Shim Rings; a posted answer says 160 means 160 completed sets of the items on the drawing, not 160 single rings. From Questions And Answers.docx
- Worth checking: Evaluation method described two ways. The notice text says best value to the Government, but Section M picks the lowest price among technically acceptable quotes.
- Worth checking: Contractor buys raw material the Government does not supply. Government material comes within 30 calendar days after award and only covers listed items; the contractor must buy the rest, such as the R4 shim ring steel, and report excess material. From N0016727Q10040001.pdf
- Worth checking: Contractor replaces lost Government material. The Government material is supplied as is; if any of it is lost or no longer usable, the contractor replaces it at its own expense. Scrap must be removed at the contractor's cost. From N0016727Q10040001.pdf
- Minor: Two delivery destinations. Most lines go to West Bethesda, Maryland; CLIN 0003 goes to Portsmouth Naval Shipyard, Kittery, Maine. Delivery is free on board (FOB) destination, so the seller carries the shipping risk.
- Minor: Kickoff meeting within 15 days of contract issuance. A virtual kickoff meeting is required within 15 days of contract issuance, unless both sides agree to another time. From N0016727Q10040001.pdf
Read from the notice and 3 attachments. Show which files.
- N0016727Q10040001.pdf (read)
- GPE Post - Amendment.docx (read)
- Questions And Answers.docx (read)
Full summary
What they want
- Machine S1L Top, S1L Bottom Cap and S1L Body Tube: QTY 675 Each for each part (contract line item numbers (CLINs) 0001 to 0003).
- Machine R4 Top Cap, R4 Body Tube, R4 Bottom Cap, R4 Shim Rings and R4 Center Mass: QTY 160 Each for each part (CLINs 0004 to 0008). A posted answer says 160 shim rings means 160 completed sets.
- Do the non-recurring engineering (NRE) and equipment setup: work instructions, shop travelers, computer numerical control (CNC) programming and tooling (CLIN 0009, 1 Lot).
- Inspect the Government-supplied raw material (nickel aluminum bronze rod and tungsten bar) on arrival and buy any raw material the Government does not supply, such as the R4 shim ring steel.
- Run lot acceptance inspections (dimensional, visual, material certificates), with 100% inspection of shim rings, and send certificates of conformance with each shipment.
- Clean, package and deliver parts to NSWC Carderock in West Bethesda, Maryland, and CLIN 0003 to Portsmouth Naval Shipyard in Kittery, Maine.
- Hold a virtual kickoff meeting and send monthly status reports and requests for variance.
- Contract type
- Firm-fixed-price (one set price, whatever the work ends up costing) purchase order; single award
- Period of performance
- From contract award through delivery. The Performance Work Statement (PWS) says through July 18, 2027; the delivery schedule says July 30, 2027. The Government delivers raw material within 30 calendar days after award.
- Estimated value
- Not stated
- How they'll choose
- Solicitation Section M: technically acceptable quotes are compared and award goes to the lowest evaluated price among them, with past performance considered. The notice text instead says best value to the Government.
- Offers due
- December 1, 2026, 12:00 PM Eastern
- How to submit
- Email to Michael Bonaiuto at michael.j.bonaiuto.civ@us.navy.mil
What they'll judge offers on
- Technical acceptability: pass or fail against the PWS
- Past performance: may be checked for the lowest-priced acceptable vendor; neutral rating if none
- Price: lowest evaluated price among technically acceptable quotes
What to include when you submit
- Email Michael Bonaiuto to get the specification drawings; they are marked Distribution C.
- Put a cover sheet at the front of the quote package: official company name, point of contact with name and phone number, and CAGE code (commercial and government entity code). The notice text ends after the CAGE code item, so more items may be listed in the posted solicitation.
- Price each of the nine lines: eight part lines (675 or 160 Each) and one lot of non-recurring engineering.
Current contractor
No incumbent is named, and no market research or Government estimate is given.
Not in the notice text
- Drawings (PR15006 to PR15008, PR15018 to PR15024) are not posted; they come by email from the contracting specialist.
- Which question deadline applies (November 19, 2026 per the notice, November 4, 2026 per Section M of the solicitation) and which delivery date applies (July 18, 2027 or July 30, 2027).
- The notice text is cut off after the CAGE code item in the list of what the quote cover sheet must hold.
- Where the machining must be done is not stated; SAM.gov gives no place of performance.
- Whether a current NIST SP 800-171 assessment score in the Supplier Performance Risk System (SPRS) must be on file to bid: the provisions are listed but their text was not included.
- Whether the Government will pay for tooling or equipment under the non-recurring engineering line is not stated.
- Item unique identification (permanent 2D data matrix marking and reporting) applies to delivered items costing $5,000 or more each and to items the schedule names; the clause's line-item tables are blank, so whether these parts need it is not stated.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- NSWC Carderock, Bethesda, MD
- Product/service code
- 2010 · Ship and Boat Propulsion Components
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336611)
- Versions
4 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0003 (this version)Due Dec 1, 2026 (changed)
- Nov 5, 2026 · Amendment 0002Due Nov 12, 2026
- Nov 3, 2026 · Amendment 0001Due Nov 12, 2026
- Oct 29, 2026 · Combined Synopsis/SolicitationDue Nov 12, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- 52000QR270000530- CGC Joseph Napier Waterborne Hull Inspection, Cleaning & Anode Zinc RenewalU.S. Coast Guard (CG-SEA-C21) asks small businesses for quotes (request for quotation 52000QR270000530) on cleaning, inspecting and videoing the underwater hull of CGC Joseph…
- Nonskid for Naval Ships/VesselsOnly small businesses can bid on solicitation N4002727R0004, a total small business set-aside from the Navy's Southeast Regional Maintenance Center.
- CGC Kukui DrydockThe U.S. Coast Guard wants a shipyard to do the fiscal year 2027 drydock work (hauling the ship out of the water for repairs) on the 225-foot buoy tender CGC Kukui (WLB 203),…
- CGC Manta DD FY27The U.S. Coast Guard wants a shipyard to drydock and repair the cutter USCGC MANTA (WPB 87320), request for quotations 70ZU0127QPBPL0006, with work running April 27, 2027 to July…
- Uscgc Hammer (Wlic 75302) USCG 68A Barge (68014) Drydock Repairs FY2027Only small businesses can send quotes for drydock repairs of the Coast Guard cutter HAMMER (WLIC 75302) and its 68-foot barge (68014), under solicitation 70ZU0127QPBPL0001.