Solicitation
Nonskid for Naval Ships/Vessels
Department of Defense · Department of the Navy
Small business set-aside · Jacksonville, FL
A newer version of this notice was posted Nov 19, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 19, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 9 attachments weren't read (J-2 NONSKID ELINS ORDERING PERIODS 1 THROUGH 5.xlsx). Check the attachments on SAM.gov.
The Navy's Southeast Regional Maintenance Center (SERMC) wants one firm-fixed-price (FFP: one set price, whatever the work costs) indefinite delivery, indefinite quantity (IDIQ: orders placed as needed) contract, solicitation N4002727R0004, to remove and replace nonskid deck covering aboard Navy ships near Mayport, Jacksonville, FL. Only small businesses can bid. The response due date is November 30, 2026, 1:00 PM Eastern.
Who can bid (5)
- Small business: the solicitation is a total small business set-aside under NAICS 336611 From Solicitation - N4002727R0004.pdf
- Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) status entered in the Supplier Performance Risk System (SPRS) before award, for each system that handles federal contract information From Solicitation - N4002727R0004.pdf
- SSPC certification for blasting, water jetting and paint application (QP-1), with certified blasters (SSPC C-7 abrasive, C-13 ultra-high-pressure waterjetting) or Navy-approved equivalents From Solicitation - N4002727R0004.pdf
Show all 5Show fewer
- A documented quality management system that meets Navy standard item 009-004 (ANSI/ISO/ASQ Q9001-2015) From Solicitation - N4002727R0004.pdf
- Coating inspectors certified as NAVSEA Basic Paint Inspector or NACE Coating Inspector Program Level 1 or higher; project manager, quality assurance professional and supervisor with the stated Navy marine coatings experience From Solicitation - N4002727R0004.pdf
How to submit: Email to SERMC_C413_IDIQ@us.navy.mil; multiple emails allowed. The offeror must make sure the whole proposal arrives on time.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Small business set-aside. Only small businesses under NAICS 336611 may be awarded this contract; larger firms cannot bid. From Solicitation - N4002727R0004.pdf
- Serious: Only your own past performance counts. Amendment 0001 says a subcontractor's Navy nonskid experience and CPARS cannot be used; a new or teaming firm may get a neutral past performance rating. From Solicitation Amendment N4002727R00040001.pdf
- Serious: Past performance outweighs price. Relevant work is defined as contracts of $350,000 to $10,000,000 performed onboard U.S. Navy surface combatants, so a firm without that record may be rated lower. From Solicitation - N4002727R0004.pdf
Show all 10Show fewer
- Serious: Required certifications and proof with the offer. Volume III must include proof of SSPC certification, a current quality management system, a Heavy Weather Plan and an organization chart, or the firm may be found not responsible. From Solicitation - N4002727R0004.pdf
- Worth checking: CMMC Level 1 status needed before award. A firm with no current CMMC Level 1 (Self) status in SPRS is not eligible for award. From Solicitation - N4002727R0004.pdf
- Worth checking: Questions were due Nov 16, 2026. Check the amendments for the agency's answers. From Solicitation - N4002727R0004.pdf
- Worth checking: Proposal sent by email only. The offeror is responsible for confirming the whole proposal arrived by the response due date, so large files should be split across emails. From Solicitation - N4002727R0004.pdf
- Worth checking: Fast mobilization and many simultaneous orders. The contractor must be fully ready on site within 10 calendar days and may need to handle several delivery orders at once; pier space is not guaranteed. From Solicitation - N4002727R0004.pdf
- Minor: No pay for worker travel time; minor delays not compensated. Travel to worksites is not payable and no schedule relief is given for delays of eight hours or less. From Solicitation - N4002727R0004.pdf
- Minor: Waste handling on every order. All waste removed from a ship is treated as possibly hazardous, with testing, labeling and containers required. From Solicitation - N4002727R0004.pdf
Read from the notice and 8 attachments. 1 of 9 not read. Show which files.
- Solicitation Amendment N4002727R00040001.pdf (read)
- Solicitation - N4002727R0004.pdf (read)
- S-1 Request for Specification Clarification.docx (read)
- J-1 NOTIONAL WORK ITEMS.pdf (read)
- EXHIBIT A DD FORM 1423 1.pdf (read)
- EXHIBIT A DD FORM 1423 2.pdf (read)
- EXHIBIT A DD FORM 1423 3.pdf (read)
- EXHIBIT A DD FORM 1423 4.pdf (read)
- J-2 NONSKID ELINS ORDERING PERIODS 1 THROUGH 5.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Remove old nonskid deck covering and install new covering aboard U.S. Navy ships and other Government vessels within 50 miles of Naval Station Mayport
- Surface preparation to Society for Protective Coatings (SSPC) standards: near-white blast, power tool cleaning to bare metal, or high-pressure water jetting
- Apply MIL-PRF-24667 nonskid: Type I or Type V roll-on, Type IV spray-on, or Type XI peel-and-stick; type and quantity are set on each delivery order
- Work on flight decks, hangar bays, cargo decks, walkways, catwalks and interior spaces, often on more than one order at a time
- Run in-process quality inspections and keep a documented quality management system
- Handle and label all waste as potentially hazardous, and follow Naval Station Mayport safety and access rules
- Be fully ready on site within 10 calendar days of contract start or a ship move
- Contract type
- Single IDIQ, firm-fixed-price (FFP) supply contract with prepriced exhibit line item numbers (ELINs); best-value trade-off
- Period of performance
- Five one-year ordering periods: March 15, 2027 to March 14, 2028, then each following year through March 14, 2032
- Place of performance
- Jacksonville, FL, USA (SAM.gov). The statement of work says onboard U.S. Navy ships and other Government vessels within 50 miles of Naval Station Mayport, Florida.
- Estimated value
- Ordering limits, not a stated estimate: the Government can order from $10,000 minimum to $20,000,000 maximum in total; each order $1,000 to $400,000
- How they'll choose
- Best-value trade-off. Past performance is significantly more important than price. Award is planned without discussions.
- Offers due
- November 30, 2026, 1:00 PM Eastern (the solicitation says 1300 Hours SERMC Local Time) (from the version posted Nov 13, 2026; amended since)
- How to submit
- Email to SERMC_C413_IDIQ@us.navy.mil; multiple emails allowed. The offeror must make sure the whole proposal arrives on time.
What they'll judge offers on
- Past Performance: up to five most recent finalized Contractor Performance Assessment Reporting System (CPARS) evaluations for similar work within three years of the RFP issue date, rated for relevance and performance confidence
- Price: checked for fairness and reasonableness; total evaluated price is the sum of all ELINs for the five ordering periods
- Pre-award information (Volume III): checked to decide whether the firm is responsible, not scored
What to include when you submit
- Send three volumes: Volume I Price, Volume II Past Performance, Volume III Pre-Award Information
- Volume I: cover letter with CAGE code and Unique Entity ID; completed Standard Form 33 (SF 33) blocks 12 through 18, signed by someone who can bind the company
- Volume I: fill in Section B line item prices and Attachment J-2 (unit and extended prices for all ordering periods); the cost portion goes in a Microsoft Excel spreadsheet
- Volume I: return Section K in full; for Sections C through I, send only pages that need a fill-in
- Volume II: up to five most recent finalized CPARS for similar work within three years of the RFP issue date; the Government pulls them using your CAGE code, UEID, name, address and division
- Volume II: you may add an explanation of corrective actions taken for past substandard performance
- Volume III: organization chart for the facility that will do the work, other divisions or affiliates that will perform, and list of special equipment, tools and facilities with who owns them
- Volume III: Heavy Weather Plan, list of subcontractors and their share of the work, current documented Quality Management System, and list of quality assurance representatives
- Volume III: proof of SSPC certification; if a subcontractor does that work, send its name, contact and proof of SSPC qualification
- Include the Cybersecurity Maturity Model Certification (CMMC) unique identifier for each system that handles federal contract information
- Acknowledge Amendment 0001 on the offer, as the amendment form requires
After award, you must have
- Base access badging for Naval Station Mayport (Defense Biometric Identification System registration, visit requests) and no non-U.S. citizens on vessels without an approved Access Control Plan From Solicitation - N4002727R0004.pdf:
No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas…
Current contractor
No incumbent is named. The notice was first posted as a presolicitation; no previous contract number or recompete wording appears in the text read.
Not in the notice text
- Part of the solicitation (Sections D through K, including delivery terms, ordering procedures and clauses) was not read (it may be an attached file the AI skipped; check SAM.gov) in the text read here, and the price spreadsheet J-2 NONSKID ELINS ORDERING PERIODS 1 THROUGH 5.xlsx is attached but not read; check them on SAM.gov
- Whether Amendment 0001 changes the response due date is unclear: its extension checkboxes couldn't be read here, so check the amendment on SAM.gov
- Site visit and Davis-Bacon wage determination are not mentioned in the text read; the work is ship repair, not construction
- Quantities per work item are not stated; type and quantity are set on each delivery order
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Solicitation
- Office
- Southeast Regional Maint Center, Mayport, FL
- Product/service code
- J998 · Non-Nuclear Ship Repair (EAST)
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336611)
- Versions
4 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0002Due Nov 30, 2026
- Nov 13, 2026 · Amendment 0001 (this version)Due Nov 30, 2026
- Oct 30, 2026 · SolicitationDue Nov 30, 2026
- Oct 15, 2026 · PresolicitationDate Nov 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Nonskid and Deck PreservationThe U.S. Coast Guard (Surface Forces Logistics Center) asks small businesses for quotes to strip the old non-skid deck coating from a 108-foot patrol boat (Patrol Craft 692),…
- Uscgc Hammer (Wlic 75302) USCG 68A Barge (68014) Drydock Repairs FY2027Only small businesses can send quotes for drydock repairs of the Coast Guard cutter HAMMER (WLIC 75302) and its 68-foot barge (68014), under solicitation 70ZU0127QPBPL0001.
- Multi-Ship Sustainment Partnership (MSSP) Single Award Indefinite Delivery Indefinite Quantity (SA-IDIQ) Contracts for Fleet Maintenance Availabilities and Incremental Selected Restricted Availabilities on DDG-51 Class Ships Homeported in Norfolk, VAThe Navy's NAVSEA HQ (Portfolio Acquisition Executive Maritime) is buying repair and maintenance work on DDG-51 Class destroyers homeported in Norfolk, VA, under solicitation…
- Vessel Acquisition Manager (VAM) Services for the Maritime AdministrationThe Maritime Administration (MARAD) plans up to two indefinite delivery/indefinite quantity (IDIQ) contracts for a Vessel Acquisition Manager (VAM) to buy used Roll-on/Roll-off…
- Vessel Acquisition Manager (VAM) Services for the Maritime AdministrationThe Maritime Administration (MARAD) plans up to two indefinite delivery/indefinite quantity (IDIQ) contracts for a Vessel Acquisition Manager (VAM) to buy used Roll-on/Roll-off…