Solicitation
Pump Assembly
Department of Defense · Department of the Navy
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Navy (NAVSUP Weapon Systems Support, Mechanicsburg) wants a pump assembly repaired, not bought new. The notice gives no quantity or unit of issue. The Navy seeks a Repair Turnaround Time (RTAT: days from receipt of the item at your shop to Government acceptance) of 229 Days, and the response due date is December 7, 2026, 4:30 PM UTC-4 (3:30 PM Eastern).
Things to watch (6)
From the version posted Nov 20, 2026.
- Serious: Quantity and unit of issue not stated. The text gives no quantity for the pump assembly and no NSN. A repair quote is priced per unit, so check the schedule before quoting.
- Worth checking: 229-day repair turnaround. The clock runs from receipt at your facility until the Government accepts the asset, including its inspection.
- Worth checking: Government Source Inspection required. A Government inspector must inspect at your site before the item is accepted, which needs scheduling.
Show all 6Show fewer
- Minor: Award needs your written acceptance. The award is bilateral, so you must accept in writing before it takes effect.
- Minor: Option quantity planned. The Government intends to add an option quantity at the unit price in the quote.
- Minor: Issued under emergency acquisition flexibilities. The solicitation uses Emergency Acquisition Flexibilities, and early or partial delivery is accepted.
Read from the notice text only.
Full summary
What they want
- Repair the PUMP ASSEMBLY, CAGE 10941, reference number N-998-6401-A-001, to the contractor's own repair standards, manuals and approved repair standards.
- Meet the Government's RTAT of 229 Days, or say why not and what capacity limits you have.
- Report every transaction in the Commercial Asset Visibility (CAV) system by the end of the fifth regular business day after receipt.
- Pass Government Source Inspection (GSI: Government inspection at the contractor's site) and final Government acceptance within the RTAT.
- Get Navy approval in writing before changing any design, material, servicing or part number.
- Keep inspection records for 365 calendar days after final delivery.
- Price an option quantity: the Government intends to add one at the unit price.
- Contract type
- Repair order awarded bilaterally (the contractor must accept in writing). Quotes mark firm-fixed-price, estimated or not-to-exceed.
- Period of performance
- Repair turnaround time of 229 Days per asset. The option for increased quantity clause lists 365 DAYS.
- Estimated value
- Not stated
- Offers due
- December 7, 2026, 4:30 PM UTC-4 (3:30 PM Eastern)
What to include when you submit
- Give unit price, total price and repair turnaround time in days.
- If you are not quoting 229 days or less, explain your capacity constraints.
- Mark whether the price is firm-fixed-price, estimated or not-to-exceed, and give a Return Material Authorization number if one applies.
- Give a testing and evaluation fee or price if the asset is found beyond repair.
- Give the awardee CAGE code, the inspection and acceptance CAGE code if different, and the CAGE code of the facility or subcontractor where the asset should be shipped.
- Give a new unit price and new unit delivery lead time, so the Navy can compare repair price to buying new.
- Verify the nomenclature, part number and national stock number (NSN) before responding.
Not in the notice text
- The quantity, unit of issue, national stock number (NSN) and delivery schedule are not in the text ('SEE SCHEDULE').
- Where and how to submit a quote is not stated; the only contact is Alison Harper at ALISON.E.HARPER.CIV@US.NAVY.MIL.
- How the award is decided is not stated.
- Which CMMC level applies is not stated.
- The Commercial Asset Visibility Statement of Work is referenced but not in the text.
- SAM.gov does not state a set-aside, and the place of performance is blank.
More to check before you bid
- The notice names requirements:
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- NAVSUP Weapon Systems Support Mech, Mechanicsburg, PA
- Product/service code
- 4320 · Power and Hand Pumps
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 333914)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
CONTACT INFORMATION|4|N771.4|WG3|771-229-0456|ALISON.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 229 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT):_______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER):_________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE:__________ Inspection & Acceptance CAGE, if not same as "awardee CAGE":__________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP ASSEMBLY . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP ASSEMBLY repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;10941 N-998-6401-A-001; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Similar open opportunities
- Pump Unit, Centrifug, in Repair/Modification ofThe Navy's NAVSUP Weapon Systems Support office in Mechanicsburg wants a centrifugal pump unit repaired (solicitation N0010426RTB38, CAGE 0EXU3 reference number 699D7672).
- Pump, Reciprocating, in Repair/Modification ofThe Navy's NAVSUP Weapon Systems Support wants a reciprocating pump (national stock number (NSN), the item's catalog number: 4320-01-182-0200) repaired under solicitation…
- Pump, RotaryDLA Aviation at Philadelphia is asking for quotes on a rotary pump (PUMP,ROTARY, PSC 4320), solicitation SPRPA126QVC62.
- Pump, HydraulicThe Defense Logistics Agency's aviation office in Philadelphia wants quotes on a hydraulic pump, quantity 5 each after an amendment raised it from 1 each.
- Pump, CentrifugalNAVSUP Weapon Systems Support Mechanicsburg (the Navy's supply command) wants quotes to repair a centrifugal pump.