Solicitation
Mather Fueling System Repairs
Department of Defense · Department of the Army
Small business set-aside · Mather, CA
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 6, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Most of the specifications (27-R-A045-Specs.pdf) were attached but not read, including the technical scope of work, insurance, superintendent rules and security sections; the Davis-Bacon file (Davis Bacon Wage Determinations - CA20260007.pdf) was only partly read. Check them on SAM.gov. Check the attachments on SAM.gov.
Army Engineer District Omaha (solicitation PANNWD26P028176, called W9128F-27-R-A045 in the documents) wants repairs to the jet fuel system at the Mather Army Aviation Support Facility, California. Only small businesses can bid: it is a total small business set-aside, firm-fixed-price (FFP: one set price) design-build job, where the winner designs and builds. The lowest price technically acceptable (LPTA: cheapest offer that passes the pass/fail review) offer wins without discussions, and the response due date is December 4, 2026, 2:00 PM Central (3:00 PM Eastern).
Who can bid (8)
- Small business: the solicitation is a total small business set-aside, so only small businesses can bid From Mather Selection Criteria - Rev 2.pdf
- Three past projects that each include fuel dispenser repairs, small building work, fuel tank appurtenance work and remote containment or similar work From Mather Selection Criteria - Rev 2.pdf
- Each past project cost $1,000,000.00 or more at completion From Mather Selection Criteria - Rev 2.pdf
Show all 8Show fewer
- Each past project completed within the past ten years From Mather Selection Criteria - Rev 2.pdf
- A customer evaluation for each project, signed by the customer, rating performance Satisfactory or better From Mather Selection Criteria - Rev 2.pdf
- Limits on subcontracting: the firm must not pay more than 85 percent (general construction) or 75 percent (special trade) of the contract amount, excluding materials, to firms that are not similarly situated small businesses From Solicitation - W9128F27RA045.pdf
- Name and details of a surety company (bonding company) with the price proposal From Mather Selection Criteria - Rev 2.pdf
- Active System for Award Management (SAM.gov) registration From Solicitation - W9128F27RA045.pdf
How to submit: Electronically to the Contract Specialist, as the RFP letter instructs. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (13)
- Serious: Total small business set-aside. Only small businesses can bid. The documents do not give the size standard for NAICS code 237120, so check it before bidding. From Mather Selection Criteria - Rev 2.pdf
- Serious: Strict past project rules. Each of three projects must include four kinds of work, cost $1,000,000.00 or more, be recent, and have a signed customer evaluation. Any shortfall makes that project unacceptable, and any unacceptable factor ends the review. From Mather Selection Criteria - Rev 2.pdf
- Worth checking: Funds are not yet available. No award will be made until funds are made available, so the work may be delayed or not awarded. From Solicitation - W9128F27RA045.pdf
Show all 13Show fewer
- Worth checking: Design and construction in one price. Prices must cover both design and construction, so a bidder needs a designer of record and must manage the design before building. From Solicitation - W9128F27RA045.pdf
- Worth checking: Missing schedule items make the offer unacceptable. The Gantt chart must show every listed item. A proposal missing any required item is rated Unacceptable. From Mather Selection Criteria - Rev 2.pdf
- Worth checking: Every line item needs a price. Leaving a numbered line item unpriced may make the offer unacceptable. Option lines 0010 to 0012 are added to the price when offers are compared. From Solicitation - W9128F27RA045.pdf
- Worth checking: The site visit was Oct 29, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Mather Selection Criteria - Rev 2.pdf
- Worth checking: Limits on subcontracting. Under the small business set-aside, the firm must keep a share of the work: no more than 85 percent (general construction) or 75 percent (special trade) can go to firms that are not similarly situated. The documents do not say which applies. From Solicitation - W9128F27RA045.pdf
- Worth checking: Davis-Bacon wages and electronic payroll. This is construction work, so Davis-Bacon (federal construction wage law) wage determination CA20260007 applies. Certified payrolls must be sent through a commercial electronic payroll system. From Davis Bacon Wage Determinations - CA20260007.pdf
- Worth checking: Liquidated damages of $1,070.00 per day. If the work is not finished on time, the contractor pays $1,070.00 for each calendar day of delay. From Solicitation - W9128F27RA045.pdf
- Worth checking: Hazardous material option lines. Options cover petroleum-contaminated soil, lead and chromium paint, and asbestos, so a bidder needs a priced plan or a qualified subcontractor for each. From Solicitation - W9128F27RA045.pdf
- Minor: Domestic construction materials only. The Buy American clause lists no exceptions, so construction materials must be domestic unless the Contracting Officer approves otherwise. From Solicitation - W9128F27RA045.pdf
- Minor: Two solicitation numbers. SAM.gov lists PANNWD26P028176, while the documents give W9128F-27-R-A045, W9128F-27-RA045 or W9128F27RA045. Use the number the ProjNet inquiry page gives for questions. From Solicitation - W9128F27RA045.pdf
Read from the notice and 5 attachments. Show which files.
- Solicitation - W9128F27RA045.pdf (read)
- 27-R-A045-Specs.pdf (read)
- Mather Selection Criteria - Rev 2.pdf (read)
- RFP Drawings.pdf (read)
- Davis Bacon Wage Determinations - CA20260007.pdf (read)
Full summary
What they want
- Upgrade the 12,000-gallon jet fuel (F-24) tank: sampling gauge hatch and clock-type gauge on manways, exterior recoat, new collision barriers, a catwalk along the whole tank, and new audible and visual alarms (line 0001)
- Fix the remote containment basin drain pipe so it slopes to the drain inlet, and replace or repair asphalt and concrete: fueling facility northeast side, refueler parking, and the truck offload area, where asphalt becomes a concrete path (lines 0002, 0003, 0004, 0006)
- Replace the dispenser fuel monitor with a non-coalescing filter and add a hand-pumped water draw-off system (line 0005)
- Supply, install and test an automatic tank gauge (ATG) system on the AVGAS tank, upgrading a Veeder Root TLS-350 Plus to a TLS-450 Plus (line 0007)
- Move the generator from inside the compartmentalized unit to the outside, on a new pad (line 0008)
- Remove the petroleum, oils and lubricants (POL) operations building and build a new one of the same size and place, with heating, cooling and electrical (line 0009)
- Option work the Government may order: petroleum-contaminated soil (20 actual tons), lead and chromium paint (50 square feet) and asbestos (50 square feet) handling and disposal (options 0010 to 0012)
- Do the design as well as the construction, send certified payrolls electronically, and deliver as-built drawings after the work
- Contract type
- Firm-fixed-price (FFP) design-build construction contract; Total small business set-aside
- Period of performance
- Projected 365 calendar days after receiving the notice to proceed. For scheduling, assume award on February 7, 2027, with the notice to proceed about two weeks later
- Place of performance
- Mather, CA: the fueling facility at the Army Aviation Support Facility (AASF) Mather
- Estimated value
- Magnitude of the project is between $1,000,000 and $5,000,000, as the solicitation states under FAR 36.204
- How they'll choose
- Lowest price technically acceptable (LPTA): offers are rated Acceptable or Unacceptable on two factors, and the lowest-priced Acceptable offer is the target for award
- Offers due
- December 4, 2026, 2:00 PM Central (3:00 PM Eastern) (from the version posted Nov 6, 2026; amended since)
- How to submit
- Electronically to the Contract Specialist, as the RFP letter instructs
- Page limits
- Each project experience example: 2 pages (the customer evaluations do not count). Pages beyond the first two are not evaluated. Page size 8.5 x 11 inches, font no smaller than 10
What they'll judge offers on
- Factor 1, Project Experience: three projects, each with fuel dispenser repairs, small building work, fuel tank appurtenance work and remote containment or similar work, rated Acceptable or Unacceptable
- Factor 2, Proposed Contract Duration and Summary Schedule: a Gantt chart (bar-style schedule) with three phases and listed milestones, rated Acceptable or Unacceptable
- Price: total combined cost for the construction, considered only for offers rated Acceptable on both factors
What to include when you submit
- Send two severable volumes (separate files): Volume 1 technical (project experience and schedule) and Volume 2 pricing.
- Volume 1, Factor 1: submit three (3) projects. Each must include fuel dispenser repairs, small building demolition, construction or repairs, fuel tank appurtenance replacement or installation, and remote containment construction or similar work.
- Each project must have total cost at completion of $1,000,000.00 or greater and have been completed within the past ten years, counted from the date of the RFP.
- Attach for each project a customer evaluation (CPARS, PPIPR, PPQ or similar), signed by the customer, saying performance was Satisfactory or better. Send it in its original form with nothing added.
- For each project give: a photo, a description, location, construction contract award amount, final construction cost, construction start date, original finish date and actual finish date.
- For each project give the name, address and phone of an owner representative and of one alternate, not affiliated with your firm, who can verify the experience.
- Volume 1, Factor 2: a Gantt chart showing Phase 1 (Preconstruction), Phase 2 (On-site Construction) and Phase 3 (Post Construction), for the projected 365 calendar days after the notice to proceed.
- The schedule must include all permits, licenses and certificates, site-specific contractor management plans, key work breakdown structure activities, long lead procurements (or a statement that there are none), the critical path from award to closeout, concurrent activities and the construction sequence if phased.
- Volume 2: Standard Form 1442 (SF 1442, the construction solicitation and offer form, Section 00 10 00) with a price on every numbered contract line item number (CLIN: one priced line of the work).
- Volume 2 must also give the name, address and fax number of your financial institution, a primary and an alternate finance contact with phone numbers, and the name, address and phone number of your surety company.
- Send technical questions through the ProjNet Bidder Inquiry system no later than 14 calendar days after the site visit; send only proprietary questions directly to the Contract Specialist.
- Acknowledge each amendment in item 19 of the SF 1442.
Not in the notice text
- Most of the specifications (27-R-A045-Specs.pdf) were attached but not read, including the technical scope of work, insurance, superintendent rules and security sections; the Davis-Bacon file (Davis Bacon Wage Determinations - CA20260007.pdf) was only partly read. Check them on SAM.gov.
- Whether performance and payment bonds or an offer guarantee are required is not stated; the SF 1442 fields for them are blank.
- The RFP letter that says where to send offers is not among the documents read.
- The documents do not say whether attending the site visit is required.
- The documents do not give the small business size standard for NAICS code 237120.
- The price schedule text mentions a "task order" award; the documents do not say a contract vehicle is required to bid.
- Insurance, superintendent qualifications and base access rules are in the part of the specifications that was not read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 6, 2026
- Notice type
- Solicitation
- Office
- W071 ENDIST Omaha, NE
- Product/service code
- Y1GC · Construction of Fuel Storage Buildings
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 237120)
- Versions
7 versions have been posted. The newest 6 are listed, newest first.
- Nov 23, 2026 · AmendmentDue Dec 4, 2026
- Nov 6, 2026 · Amendment (this version)Due Dec 4, 2026 (changed)
- Oct 23, 2026 · AmendmentDue Nov 20, 2026
- Oct 23, 2026 · AmendmentDue Nov 20, 2026
- Oct 23, 2026 · AmendmentDue Nov 20, 2026
- Oct 22, 2026 · SolicitationDue Nov 20, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- WH Ford RTC Fueling System Repairs
- Fort Hood Tank RepairsU.S. Army Corps of Engineers Omaha District solicitation W9128F27RA038, Fort Hood Tank Repairs, set aside totally for small businesses: API 653 repairs to Tanks 7065, 7066 and…
- Savannah ANG Repairs Pre-Solicitation NoticeU.S. Army Corps of Engineers Omaha District posted a presolicitation (W9128F27RA053PN), set aside totally for small businesses, for repairs and maintenance of Tanks 964 and 967…
- Brine Pipeline Access ImprovementsThe Army Corps of Engineers Los Angeles District plans a sealed-bid construction contract, set aside for small businesses, to improve access points and pipeline isolation along…
- Mud Mountain Dam Sewage Lagoon RepairArmy Corps of Engineers Seattle District (solicitation W912DW27QA006) wants a business to clean and repair the sewage lagoon liner at Mud Mountain Dam in Enumclaw, WA. Only small…