Award Notice
Rocket Missile Maintenance Facility (RMMF) Letterkenny Army Depot (LEAD) Precision Strike Missile System (PRSM) and Commercial Vehicle Access Control Point (ACP)
Department of Defense · Department of the Army
From the notice**Amendment 0009: Provide specification changes.** **Amendment 0008: Remove the requirement for a Project Labor Agreement; a waiver has been received, extend the proposal deadline from July 7th, 2026, to July 31, 2026 at 12:00pm EDT, provide specification changes, and provide… Read more
Closed
This contract has been awarded
Awarded to Coakley & Williams Construction, LLC. (MD) for $57.8M on Sep 30, 2026. Award number W912DR26CA026.
Recent Army contract awards: who won →
These similar contracts are still open:
- FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, HawaiiStep 1 white papers for the FY29 PN108808 parking garage at Tripler Army Medical Center, Oahu, HI (W9128A27RWP01) are due by the SAM.gov response date, December 4, 2026, 2:00 PM…
- Design-Build-to-Budget – Fort McCoy Indoor Multipurpose Athletic Facility - Army Combat Fitness TestingAdvance notice of a two-phase design-build-to-budget RFP (W912QR27RA005): Phase I proposals are open to all firms, and at most three are invited to Phase II. The Army Corps of…
- Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TXPhase II (invited firms only) of solicitation W912QR25RA013: the Army Corps of Engineers Louisville District seeks a design-build contractor to repair and add to the roughly…
- Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJThe U.S. Army Corps of Engineers Louisville District plans to issue a design/build request for proposals to repair and modernize Army Reserve Area Maintenance Support Activity…
- $495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U.S. Army Corps of Engineers, Honolulu District
Notice details
Notice type, codes, versions and files
- Posted
- Oct 1, 2026
- Notice type
- Award Notice
- Award number
- W912DR26CA026
- Office
- W2SD ENDIST Baltimore, MD
- Product/service code
- Y1BF · Construction of Missile System Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Attachments
Full notice text from SAM.gov
**Amendment 0009: Provide specification changes.** **Amendment 0008: Remove the requirement for a Project Labor Agreement; a waiver has been received, extend the proposal deadline from July 7th, 2026, to July 31, 2026 at 12:00pm EDT, provide specification changes, and provide updated drawings.** **Amendment 0007: Provide updated Attachment A Price Schedule, provide specification changes, and provide updated drawings. ** **Amendment 0006: Extend the proposal deadline from June 1st, 2026, to July 7, 2026, at 12:00pm EST and confirm RFIs will not be re-opened. ** **Amendment 0005: Provides spec changes, updated wage determination and factor clarifications. The proposal due date remains unchanged at this time, due 1 June 2026.** **Amendment 0004: A. Remove Subsection b. File Packaging from Section 2. Proposal Files from CSI 00 21 16 Instructions to Proposers. The requirement for all proposals to be submitted via a zip file has been removed. B. Replace the entirety of Specification 01 33 29 in Specification Section 01 33 29 Sustainability Requirements and Reporting. C. Replace Paragraph 2.18.1 in Specification 28 31 76, Paragraph 2.18.1. D. Reissued multiple drawings with changes marked for the Voelz Access Control Point (ACP). E. Removed *at least 10 calendar days prior to the date established in the Request for Proposal (RFP) for receipt of proposals* requirement for RFI submission deadline and replaced it with *by 11 May 2026 at 11:00 AM EDT*. F. Provide Attendance Sheet for site visit held 22 April 2026.** **Amendment 0003: Updates Attachment K and adds a Citizenship Requirement to the CSI 00 73 00 supplemental text. The revised attachment clarifies the RSVP deadline as 14 April and reschedules the site visit for 22 April.** **Amendment 0002: Updates Attachments H and I for accessibility. Attachments H and I are updated and attached.** **Amendment 0001 Clarifications to site visit. See updated Attachments D and K.** In general terms, the project consists of a Design-Bid-Build acquisition strategy for construction services. Specific requirements include: New construction of an approximate 45,000 SF Rocket and Missile Maintenance Facility (RMMF) warehouse and associated administrative support functions. Adjacent to the RMMF is an approximate 10,000 SF storage building and 1,000 SF forklift charging shed. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways and hardscape areas that support the loading and unloading of munitions. The project further includes the replacement of the existing Voelz Gate Access Control Point (ACP) and associated hardscapes. The new ACP includes an approximate 1,600 SF combined gatehouse, inbound/outbound lanes with commercial vehicle inspection canopies, and associated active and passive vehicle controls. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways, and hardscape areas that support the operations of the access control point and commercial vehicle inspections.