Award Notice
ROCKET MISSILE MAINTENANCE FACILITY (RMMF) LETTERKENNY ARMY DEPOT (LEAD) PRECISION STRIKE MISSILE SYSTEM (PRSM) AND COMMERCIAL VEHICLE ACCESS CONTROL POINT (ACP)
Dept of Defense · Dept of the Army · Sol. W912DR26RA035
No deadlineClosed
This contract has been awarded
Awarded to Coakley & Williams Construction, LLC. for $57.8M on Sep 30, 2026.
Recent Army contract awards: who won →
These similar contracts are still open:
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.
- FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OklahomaThe U.S. Army Corps of Engineers, Tulsa District wants a design-build team for a roughly $235M program at Altus Air Force Base, Oklahoma.
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Key facts
- Posted
- Oct 1, 2026
- Notice type
- Award Notice
- Solicitation
- W912DR26RA035
- Agency
- Dept of Defense · Dept of the Army
- Office
- W2SD Endist Baltimore
- NAICS
- 236220
- Product/service code
- Y1BF
- Business type
- Construction & renovation
- Place of performance
- 17201
- Contracting contact
- Shawn Handleyshawn.d.handley@usace.army.mil4109622063
Before you respond
Full notice text from SAM.gov
**Amendment 0009: Provide specification changes.** **Amendment 0008: Remove the requirement for a Project Labor Agreement; a waiver has been received, extend the proposal deadline from July 7th, 2026, to July 31, 2026 at 12:00pm EDT, provide specification changes, and provide updated drawings.** **Amendment 0007: Provide updated Attachment A Price Schedule, provide specification changes, and provide updated drawings. ** **Amendment 0006: Extend the proposal deadline from June 1st, 2026, to July 7, 2026, at 12:00pm EST and confirm RFIs will not be re-opened. ** **Amendment 0005: Provides spec changes, updated wage determination and factor clarifications. The proposal due date remains unchanged at this time, due 1 June 2026.** **Amendment 0004: A. Remove Subsection b. File Packaging from Section 2. Proposal Files from CSI 00 21 16 Instructions to Proposers. The requirement for all proposals to be submitted via a zip file has been removed. B. Replace the entirety of Specification 01 33 29 in Specification Section 01 33 29 Sustainability Requirements and Reporting. C. Replace Paragraph 2.18.1 in Specification 28 31 76, Paragraph 2.18.1. D. Reissued multiple drawings with changes marked for the Voelz Access Control Point (ACP). E. Removed *at least 10 calendar days prior to the date established in the Request for Proposal (RFP) for receipt of proposals* requirement for RFI submission deadline and replaced it with *by 11 May 2026 at 11:00 AM EDT*. F. Provide Attendance Sheet for site visit held 22 April 2026.** **Amendment 0003: Updates Attachment K and adds a Citizenship Requirement to the CSI 00 73 00 supplemental text. The revised attachment clarifies the RSVP deadline as 14 April and reschedules the site visit for 22 April.** **Amendment 0002: Updates Attachments H and I for accessibility. Attachments H and I are updated and attached.** **Amendment 0001 Clarifications to site visit. See updated Attachments D and K.** In general terms, the project consists of a Design-Bid-Build acquisition strategy for construction services. Specific requirements include: New construction of an approximate 45,000 SF Rocket and Missile Maintenance Facility (RMMF) warehouse and associated administrative support functions. Adjacent to the RMMF is an approximate 10,000 SF storage building and 1,000 SF forklift charging shed. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways and hardscape areas that support the loading and unloading of munitions. The project further includes the replacement of the existing Voelz Gate Access Control Point (ACP) and associated hardscapes. The new ACP includes an approximate 1,600 SF combined gatehouse, inbound/outbound lanes with commercial vehicle inspection canopies, and associated active and passive vehicle controls. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways, and hardscape areas that support the operations of the access control point and commercial vehicle inspections.