Combined Synopsis/Solicitation
Fort Bliss Air Traffic Control Services
Department of Defense · Department of the Army
AI summaryThe Army's Mission and Installation Contracting Command at Joint Base Lewis-McChord, for U.S. Army Garrison Fort Bliss, wants a small business to provide air traffic control (ATC) services at Fort Bliss, Texas, around the clock. It is a request for proposals (RFP) set aside for small businesses. The response due date is November 4, 2026, 12:00 PM Pacific (3:00 PM Eastern). The current schedule has a 21-day phase-in, an 11-month base period and four 12-month option periods. More in the summary
AI summary Beta
This summary may miss requirements: 15 of 27 attachments weren't read (W911S826RA015 Amend 0001.pdf, J16_CBA_PATCO-Techwise_23MAR2024.pdf and 13 more). Check the attachments on SAM.gov.
The Army's Mission and Installation Contracting Command at Joint Base Lewis-McChord, for U.S. Army Garrison Fort Bliss, wants a small business to provide air traffic control (ATC) services at Fort Bliss, Texas, around the clock. It is a request for proposals (RFP) set aside for small businesses. The response due date is November 4, 2026, 12:00 PM Pacific (3:00 PM Eastern). The current schedule has a 21-day phase-in, an 11-month base period and four 12-month option periods.
Who can bid (4)
- Be a small business for NAICS 488111 (Air Traffic Control); the SAM.gov set-aside is Small Business Set Aside - Total
- All air traffic control staff need an active SECRET (Tier 3) security clearance for the life of the contract; an interim SECRET is allowed until the final one is granted
- Hold a current CMMC Level 2 (Self) status in SPRS before award for each system that handles federal contract information or controlled unclassified information (from the RFP's DFARS 252.204-7025 provision)
Show all 4Show fewer
- Staff must be U.S. citizens or otherwise authorized, with background checks for installation access (the PWS table of contents lists a U.S. citizen or authorization section)
Things to watch (9)
From the version posted Oct 20, 2026.
- Serious: Small business set-aside. Only small businesses under NAICS 488111 can bid; the size standard was not shown in the text that was read.
- Serious: SECRET clearance for every controller. You need a staff of cleared air traffic controllers ready to work; an interim SECRET is accepted only until the final one is adjudicated.
- Serious: Short phase-in with a cleared-staff roster. The conformed copy gives 21 days to transition in (the original RFP said 2 months), and the roster of cleared staff is due at the start of that period.
Show all 9Show fewer
- Serious: 24/7/365 staffing including holidays. The tower and AIC must never lack coverage, so you need enough qualified staff for three shifts, Sundays and every federal holiday.
- Serious: Cybersecurity certification required before award. The RFP requires a current CMMC Level 2 (Self) status in SPRS for any system holding federal contract information or controlled unclassified information, or you are not eligible for award.
- Worth checking: Contract type described two ways. The priced line items say firm-fixed-price, but the PWS says the Government will award a fixed-price indefinite delivery/indefinite quantity contract; ask the contracting officer which applies.
- Worth checking: Past performance references with a questionnaire. You must send a reference sheet per example and have your references return questionnaires directly to the Government, so line them up early.
- Worth checking: Key personnel, resumes and flight physicals. The PWS table of contents lists key personnel, resumes and certifications, and Class IV flight physicals for controllers; the details were not in the text that was read.
- Minor: Background checks for base access. Each employee needs a favorably adjudicated background check before getting a Common Access Card (CAC, the Army ID card).
Read from the notice and 12 attachments. 15 of 27 not read. Show which files.
- Conformed Copy of W911S826RA015 thru Amend 0001.pdf (read)
- Bliss_ATC_RFP_W911S826RA015.pdf (read)
- J01_ATC_PWS_FINAL_15OCT2026.docx (read)
- J01_PWS_11SEP2026.docx (read)
- J04_PWS_Attachment_3_Equipment_Listing_23JUL2026.pdf (read)
- L03_Performance_Assessment_Questionnaire_Cover_Letter.docx (read)
- J05_PWS_Attachment_4_Airfield_Small_UAS_SOP_14APR2025.pdf (read)
- J08_PWS_Attachment_7_BAAF_SOP_11DEC2023.pdf (read)
- L04_Performance Assessment Questionnaire.docx (read)
- J07_PWS_Attachment_6_SUAS_Incursion_Checklist_29APR2026.pdf (read)
- J15_DD254_5AUG2026.pdf (read)
- L02_Specific_Relevant_Contract_Reference_Sheet.docx (read)
- W911S826RA015 Amend 0001.pdf: not summarized: open it on SAM.gov
- J16_CBA_PATCO-Techwise_23MAR2024.pdf: not summarized: open it on SAM.gov
- J04_PWS_Attachment_3_Equipment_Listing_23JUL2026.docx: not summarized: open it on SAM.gov
- J03_PWS_Attachment_2_Deliverables_23JUL2026.docx: not summarized: open it on SAM.gov
- J06_PWS_Attachment_5_AIC_SUAS_Incursion_Checklist_1APR2025.docx: not summarized: open it on SAM.gov
- J02_PWS_Attachment_1_PRS_23JUL2026.docx: not summarized: open it on SAM.gov
- J10_PWS_Attachment_9_DA_FORM_3479_OCT2019.pdf: not summarized: open it on SAM.gov
- J14_PWS_Attachment_13_DA_FORM_3503_OCT2019.pdf: not summarized: open it on SAM.gov
- J17_WD_2015-5229_Rev31_27AUG2026.pdf: not summarized: open it on SAM.gov
- J09_PWS_Attachment_8_DA_FORM_2696_OCT2013.pdf: not summarized: open it on SAM.gov
- J11_PWS_Attachment_10_DA_FORM_3479-1R_JUN2003.pdf: not summarized: open it on SAM.gov
- L01_Subcontractor_Consent_Form.docx: not summarized: open it on SAM.gov
- J13_PWS_Attachment_12_DA_FORM_3502-R_JUN2003.pdf: not summarized: open it on SAM.gov
- J12_PWS_Attachment_11_DA_FORM_3479-6_JUN2003.pdf: not summarized: open it on SAM.gov
- RFP Questions and Answers.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Run a non-approach-control tower at Biggs Army Airfield (BAAF) and an Airspace Information Center (AIC) that tracks flights over Fort Bliss airspace, 24 hours a day, 7 days a week, 365 days a year, including federal holidays
- Staff three daily shifts. Priced lines cover 1st shift Monday to Friday 0800-1600, 2nd and 3rd shifts Monday to Saturday, Sunday shifts, federal holiday shifts (10 Days in the base period, 11 Days in each option period) and site management
- Have every controller hold an active SECRET clearance (an interim clearance is allowed until the final one is granted)
- Monitor, coordinate and de-conflict drone (unmanned aircraft system, UAS) flights with manned aircraft, and report unauthorized drones; written incident report within 5 calendar days
- Train designated military controllers on the job and give position-qualification training to any military staff added during exercises
- Send a quality control plan (QCP: how you check your own work) within 30 days after award (Deliverable A001)
- Take over in a 21-day phase-in (QTY 21 Days) and hand over in a 7-day phase-out (QTY 7 Days) at the end
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) line items on the Standard Form 1449; the performance work statement (PWS) calls it a fixed-price indefinite delivery/indefinite quantity (IDIQ) contract
- Period of performance
- Per the conformed copy through Amendment 0001: 21-day phase-in, 11-month base period, four 12-month option periods, 7-day phase-out, and up to 6 more months of extension at the Government's choice (original RFP: 2-month phase-in, 10-month base)
- Place of performance
- Fort Bliss, TX: Biggs Army Airfield tower (building 13488) and backup site (building 11210)
- Estimated value
- Not stated
- Offers due
- November 4, 2026, 12:00 PM Pacific (3:00 PM Eastern)
What they'll judge offers on
- Price (Factor 3)
- Past performance on same or similar air traffic control contracts, shown by reference sheets and questionnaires returned by your references
What to include when you submit
- Complete the Standard Form 1449 (SF 1449: the form you sign and return as your offer), including blocks 12, 17, 23, 24 and 30, and price every line item
- Send a Specific Relevant Contract Reference Sheet (Attachment L2) for each past performance example; the sheet lists the prime contractor if you were a subcontractor or teaming partner
- Each reference narrative covers a program description, technical performance, quality effort, security problems if any, management of goals and schedules, and major program risks
- Ask each reference to return the Performance Assessment Questionnaire (Attachment L4) to the contracting office by email (thomas.r.williams60.civ@army.mil), no later than 15 days after receiving the request or the RFP closing date, whichever comes first
- Give the Cybersecurity Maturity Model Certification (CMMC) unique identifiers from the Supplier Performance Risk System (SPRS) for each system that handles federal contract information or controlled unclassified information
- Limits on how many past performance examples to send and their page counts are in Addendum paragraph L.7.2.4.6, which was not read
- Where and how to submit, and the full proposal format, are in the RFP instructions, which were only partly read
After award, you must have
- Give the Government a roster of cleared staff at the start of the phase-in period (Deliverable A002)
Not in the notice text
- Most of the RFP and conformed copy are only partly read (the middle of each, with Sections L and M: proposal instructions, evaluation factors and the full clause list, was left out). Amendment 0001 and the RFP Questions and Answers file are attached but not read; they are on SAM.gov.
- Where and how to submit offers, the question deadline, page limits and whether Amendment 0001 changed the response due date are not in the text that was read.
- The full evaluation method and factor order are not in the text that was read.
- Attached but not read: the performance requirements summary (J02), deliverables schedule (J03), forms, a wage determination (J17_WD_2015-5229_Rev31_27AUG2026.pdf) and a collective bargaining agreement (J16_CBA_PATCO-Techwise_23MAR2024.pdf); check wage rates and any labor terms there.
- The DD Form 254 (J15, the security classification specification) could not be read, so any facility clearance requirement is unknown.
- The SBA size standard for NAICS 488111 and the Government's estimate are not shown.
Eligibility and how to respond
- Set aside for small businesses: only a business that counts as small under this notice's NAICS code can bid as the prime contractor. More open small business set-asides under NAICS 488111
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
- Posted
- Oct 20, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- W6QM MICC-JB Lewis-MC Chord, Joint Base Lewis MCCH, WA
- Product/service code
- M1BA · Operation of Air Traffic Control Towers
- Business type
- Transportation, logistics & vehicles (FedReady's grouping, from NAICS 488111)
- Versions
2 versions have been posted, newest first.
- Oct 20, 2026 · Amendment 0001 (this version)Due Nov 4, 2026 (changed)
- Sep 30, 2026 · Combined Synopsis/SolicitationDue Oct 31, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside