Solicitation
Provision of Services for Supply and Installation of Swimming Pool Tiles at US Consulate General Karachi
Department of State
AI summary Beta
This summary may miss requirements: 1 of 3 attachments weren't read (SF30_RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool tiles.pdf). Check the attachments on SAM.gov.
The U.S. Consulate General Karachi (State Department) wants a contractor to supply and install new tiles on the swimming pool deck and the pool floor and walls, solicitation 19PK4027Q5002. It is a request for quotation (RFQ) at one firm-fixed-price (FFP: one set price, whatever the work costs). The lowest-priced acceptable, responsible quote wins. The response due date is December 2, 2026, 3:00 PM Pakistan standard time, by email. Work is in Karachi, Pakistan.
Who can bid (12)
- Be registered in the System for Award Management (SAM) before sending the quote, and include proof of registration From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Established business in the U.S. or Pakistan with a permanent address and phone listing From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- 3 years of experience installing natural stone in exterior and wet areas, or equivalent projects From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
Show all 12Show fewer
- 3 years of experience completing pool deck related civil work projects From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- A site supervisor who can communicate in English From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Financial resources shown by the last year's audited financial statements and bank statements From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Tax registration in Pakistan (sales tax registration number STRN and national tax number NTN, as applicable) or with the relevant U.S. authority From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- All licenses and permits required by local law From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Local insurance coverage, shown by an insurance cover note From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Ability to obtain or post performance security such as a bank letter of guaranty, with an affidavit From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Affidavits: not blacklisted by any agency, no adverse criminal record, and no political or business affiliation contrary to U.S. interests From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Pass the U.S. Mission's Risk Analysis Management (RAM) vetting of key personnel if the quote is in the competitive range From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
How to submit: Email to Krcprocurementcontracting@state.gov as Adobe Acrobat (PDF) files; each email under 30MB, split into several emails if larger. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 12, 2026.
- Serious: Bank guaranty for performance security. The RFQ attaches a sample bank letter of guaranty for 20% of the price until final acceptance, then 10% in the guaranty period; the form's bond checkbox and whether it is due with the quote couldn't be read, so check the form on SAM.gov. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Serious: Pakistan licenses, insurance and ID-based site access. Bidders need local licenses and insurance, and site access needs Pakistani Computerized National Identity Card (CNIC) numbers and a National Database and Registration Authority (NADRA) verification certificate, which a U.S. firm without local staff may struggle to meet. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Worth checking: Security vetting before award. Quotes in the competitive range get extra Risk Analysis Management (RAM) vetting of key staff on a secure portal; firms must send data within 3 to 5 days of being contacted or are dropped. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
Show all 10Show fewer
- Worth checking: Host-country taxes and Defense Base Act insurance in the price. The Government will not reimburse value added tax (VAT), only a general sales tax exemption certificate is issued, other taxes must be inside the price, and Defense Base Act (DBA, workers' compensation for overseas U.S. contract staff) insurance is its own priced line. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Worth checking: The site visit was Nov 16, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Worth checking: The site visit was Nov 19, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool Deck Tiles.pdf
- Worth checking: Completion time stated three ways. The form says 45 calendar days, the statement of work says 45 working days, and the evaluation criteria say 45 business days; the bar chart must show completion in the required time. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Worth checking: Three years of matching past work with references. Quotes must show 3 years of natural stone and pool deck work, with client, reference, date and value, plus a past performance list; a newer firm may not qualify. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Minor: Copies of the offer. Standard Form 1442 asks for the original and 02 copies, while Section J asks for 01 copy of each volume; the quote is emailed as a PDF, so ask which applies. From RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
- Minor: Late completion damages. The other RFQ file sets liquidated damages (a daily charge for finishing late) at PKR 10,000 per calendar day; the RFQ(Rev) text read here doesn't show that clause. From RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool Deck Tiles.pdf
Read from the notice and 2 attachments. 1 of 3 not read. Show which files.
- RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf (read)
- RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool Deck Tiles.pdf (read)
- SF30_RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool tiles.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Remove the old epoxy finish on the 419 m² pool deck and install natural stone tile with a leathered finish (Diana Royal Leathered Exterior Pavers or equal), with grout, movement joints and sealer
- Remove old pool floor and wall tiles by hand tools (no jackhammering), waterproof the surface, and install light blue porcelain anti-slip tiles over 345 m²
- Price three lines, each 1 Job: CLIN 001 pool floor and wall tiles, CLIN 002 pool deck tiles, CLIN 003 Defense Base Act insurance
- Install hidden covers over the existing eight skimmers and reinstall drains, ladder anchors, handrail sockets and depth and safety signs
- Send samples, product data, a shop drawing and an on-site mock-up panel for approval by the contracting officer's representative (COR) before buying materials or starting
- Follow the Consulate's safety rules (EM-385 chapters 8, 13 and 14, protective gear, hazard analysis) and site security rules
- Deliver as-built drawings, warranties, maintenance instructions and spare tiles, with at least a 1 year workmanship warranty
- Contract type
- Firm-fixed-price construction purchase order (RFQ, award without discussions planned)
- Period of performance
- Begin within 10 calendar days of notice to proceed and finish; the form says calendar days, the statement of work says 45 working days
- Place of performance
- U.S. Consulate General Karachi, New TPX Area, Plot 3-5, Mai Kolachi, Karachi, Pakistan
- Estimated value
- Government's anticipated price range: PKR 80,00,000.00 to PKR 140,00,000.00 (as written in the RFQ)
- How they'll choose
- Lowest priced, acceptable, responsible quote; the Government may reject quotes that are unreasonably low or high
- Offers due
- December 2, 2026, 3:00 PM Pakistan standard time (5:00 AM Eastern)
- How to submit
- Email to Krcprocurementcontracting@state.gov as Adobe Acrobat (PDF) files; each email under 30MB, split into several emails if larger
What they'll judge offers on
- Price: the lowest-priced quote wins among acceptable ones
- Technical acceptability: compliance with the RFQ terms, including naming the proposed stone, adhesive and grout with manufacturer data or test reports, and a bar chart showing completion within 45 business days
What to include when you submit
- Include Standard Form 1442 (SF-1442), Section A pricing, Section B and Attachment 2 (price breakdown by divisions of the specifications), Section L representations and certifications, the information Section J asks for, and proof of SAM registration
- Volume I: Standard Form 18 with the completed price breakdown by divisions of specifications. Volume II: a bar chart performance schedule and a business management and technical proposal
- Business management proposal: names, addresses and phone numbers of owners, partners and principal officers; the field superintendent; and subcontractors and principal materials suppliers with the work each will do
- Past performance: list all contracts and subcontracts held over the past three years for the same or similar work, with customer contacts, contract number and type, dates, place, dollar value, a description, and any litigation now or in the last 5 years
- Show 3 years of natural stone work in exterior and wet areas and 3 years of pool deck civil work, each with client name, contract or purchase order reference, date and order value
- Attach audited financial statements for the last year, tax registration (sales tax registration number, STRN, or national tax number, NTN, as applicable), insurance cover note, a litigation history, and affidavits on blacklisting, criminal record, political or business affiliations and ability to post performance security
- Name the proposed stone, adhesive and grout and send manufacturer data or test reports showing they meet the specification table
- Include Defense Base Act (DBA) insurance premium costs in the price; write prices in Pakistani rupees (PKR)
- Keep the quote valid at least 60 calendar days after the response due date; offers with less are rejected
- Write the quote in English; incomplete quotes will not be accepted
- To attend the site visit, email full names as on the national ID, vehicle make, model, color and registration number, and cell numbers; only two people per firm may attend
- Send questions by close of business, November 23, 2026
Not in the notice text
- The middle of both RFQ files (inspection, special terms, contract clauses) was cut off, and the scanned Standard Form 30 file (SF30, the contract amendment form) was attached but not read; check them on SAM.gov for changed dates or terms.
- Whether a performance bond or bank guaranty must be sent with the quote or only after award; the form's checkbox couldn't be read.
- Which RFQ file governs, since the two files differ on the site visit, sign-up and question dates and the offer validity date.
- Whether any amendment moved a date or term, since the SF30 couldn't be read.
- The drawings (Attachment 3) are marked reserved, so none were provided.
More to check before you bid
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 12, 2026
- Notice type
- Solicitation
- Office
- American Consulate Karachi
- Product/service code
- Z2PA · Repair or Alteration of Recreation Facilities (Non-Building)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238340)
- Versions
2 versions have been posted, newest first.
- Nov 12, 2026 · Amendment 0001 (this version)Due Dec 2, 2026
- Nov 4, 2026 · SolicitationDue Dec 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- USCG Station Saginaw River Galley FlooringTotal small business set-aside, solicitation 70ZL1727QCLEV0004: U.S. Coast Guard Base Cleveland wants old quarry tile removed from the galley and the hallway beside it, about 450…
- Flooring Installation and RepaintingThe Naval Air Warfare Center Weapons Division (NAWCWD) at China Lake, California wants asbestos flooring removed, about 1,050 SF of new vinyl flooring and cove base installed,…
- USCG Station Cortez Carpet Removal and Luxury Vinyl Plank (LVP) Flooring InstallationThe U.S. Coast Guard (Base Miami Beach) wants a small business to remove carpet and install luxury vinyl plank (LVP) flooring and vinyl base on the 2nd deck of the Multipurpose…