Combined Synopsis/Solicitation
Aggregate Stone Material - Fort Riley, Kansas
Department of Defense · Department of the Army
AI summarySet aside for small businesses only. The Army contracting office at Fort Riley (MICC-Fort Riley) wants crushed aggregate stone and sand bought, hauled and delivered by truck to Directorate of Public Works sites at Fort Riley, Kansas. Orders are placed as delivery orders at fixed prices per ton. Quotes are due by the end of November 7, 2026 (Central). More in the summary
A newer version of this notice was posted Oct 19, 2026. See the latest version.
AI summary Beta
Summary of the version posted Oct 15, 2026. The notice was amended Oct 19, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 4 attachments weren't read (Combined Synopsis - Solicitation SAM.gov.pdf, Pricing Worksheet.xlsx). Check the attachments on SAM.gov.
Set aside for small businesses only. The Army contracting office at Fort Riley (MICC-Fort Riley) wants crushed aggregate stone and sand bought, hauled and delivered by truck to Directorate of Public Works sites at Fort Riley, Kansas. Orders are placed as delivery orders at fixed prices per ton. Quotes are due by the end of November 7, 2026 (Central).
Who can bid
- Small business (total small business set-aside): only small businesses can quote
How to submit: Not stated in the files read; the combined synopsis/solicitation PDF is attached but not read. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Small business set-aside. Only small businesses can quote on this total small business set-aside.
- Worth checking: Quantities and price form not in the text read. No tonnage is given in the files read; the pricing worksheet and the main solicitation PDF were attached but not read.
- Worth checking: Off-road delivery needs high-clearance trucks. Trucks going to the two tank gunnery ranges need high-clearance axles, and the Government won't tow stuck trucks.
Show all 9Show fewer
- Worth checking: Lab certification before first delivery. Each material lot needs a laboratory certification and a sieve analysis before delivery starts, which adds testing cost and lead time.
- Worth checking: Bridge and culvert damage at contractor's cost. The contractor must check load capacity on every route, and any damage from exceeding posted limits is repaired at the contractor's expense.
- Minor: Deliveries start within five business days of an order. Special Contract Requirements say a delivery order is issued 3-5 days before the expected delivery, so material and trucks must be ready on short order.
- Minor: Rejected loads replaced at contractor's cost. The site manager can reject loads with too many fines, clay or debris, and the contractor must remove and replace them.
- Minor: Gate rules for delivery trucks differ in the documents. One section sends commercial vehicles to 12th Street or Estes Gate, 5:00 AM to 7:00 PM; the delivery section says 12th Street and Parker gates, 5:00 AM to 6:00 PM. Ask the contracting officer which applies.
- Minor: Solicitation number differs from SAM.gov. The SOW is headed W911RX-26-Q-A032, while SAM.gov lists W911RX27QA002; confirm you are quoting the right solicitation.
Read from the notice and 2 attachments. 2 of 4 not read. Show which files.
- Statement of Work (SOW).pdf (read)
- Special Contract Requirements.pdf (read)
- Combined Synopsis - Solicitation SAM.gov.pdf: not read (it couldn't be opened): open it on SAM.gov
- Pricing Worksheet.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Supply and haul four materials: Aggregate Base Type 3 (AB-3), Select/Stabilized Aggregate Grade 1 (SA-1), Screened/Special Sand (SS-5) and Fill Sand (FA-3)
- Meet the gradation, moisture and purity limits in the Statement of Work (SOW), with laboratory certification (AASHTO or ASTM standards) for each material lot before the first delivery
- Deliver in clean, tight-bed dump trucks or semi-trailers that don't leak, with sand loads tarped
- Start deliveries within five business days of an order, with 24-hour advance notice to the site and delivery only between 8:00 AM and 3:30 PM
- Send a certified weight ticket with every load (truck ID, gross, tare and net weight in tons)
- Stay under posted bridge and culvert weight limits; damage is repaired at the contractor's cost
- Stockpile at least 200 feet from permanent structures and waterways when the material isn't spread right away
- Contract type
- Delivery orders at fixed prices per ton, with minimum and maximum order amounts under FAR 52.216-19 (order limitations)
- Place of performance
- Fort Riley, KS. Delivery points: Main Post Public Works Yard (Building 352); Tank Gunnery Range South (Range 18) on Vinton School Road; Tank Gunnery Range North (MPRC) north of Wakefield on US Highway 77; Main Post Building 318 Salt Barn (sand only)
- Estimated value
- Not stated
- Offers due
- End of November 7, 2026 (12:00 AM November 8, Central) (from the version posted Oct 15, 2026; amended since)
- How to submit
- Not stated in the files read; the combined synopsis/solicitation PDF is attached but not read
What to include when you submit
- Follow the quote instructions in the Combined Synopsis - Solicitation SAM.gov.pdf (attached but not read)
- Fill out the Pricing Worksheet.xlsx (attached but not read)
After award, you must have
- Laboratory certification (AASHTO or ASTM standards) for each material lot, provided before the first delivery From Statement of Work (SOW).pdf:
…responsible for providing laboratory certification (AASHTO or ASTM standards) for each…
- Proof of insurance before starting on-site work or within 10 days of award: workers' compensation, general liability and automobile liability From Special Contract Requirements.pdf:
Before commencing on-site operations (or within 10 days of award or receipt of notice…
- Employees must be U.S. citizens or resident aliens with permission to work in the United States, and delivery crews need a Fort Riley access pass From Special Contract Requirements.pdf:
…employees shall be citizens of the United States or shall be resident aliens with appropriate…
Not in the notice text
- The Combined Synopsis - Solicitation SAM.gov.pdf was attached but not read because it is too large; quote instructions, evaluation factors, quantities and clauses are likely there.
- Pricing Worksheet.xlsx was attached but not read; the quantities per material in tons are likely there.
- Contract length, any option periods and the minimum and maximum order amounts are not given in the files read.
- How the award is decided is not stated in the files read.
- Whether the Special Contract Requirements about services and badging apply fully to a supply delivery contract is not clear; check with the contracting officer.
Eligibility and how to respond
- Set aside for small businesses: only a business that counts as small under this notice's NAICS code can bid as the prime contractor. More open small business set-asides under NAICS 212321
- How to submit, from the AI summary: Not stated in the files read; the combined synopsis/solicitation PDF is attached but not read. Check it in the notice before you send anything.
Notice details
- Posted
- Oct 15, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- W6QM MICC-FT Riley, Fort Riley, KS
- Product/service code
- 5610 · Mineral Construction Materials, Bulk
- Business type
- Construction & renovation (FedReady's grouping, from product/service code 5610)
- Versions
2 versions have been posted, newest first.
- Oct 19, 2026 · Amendment 0001Due Nov 7, 2026
- Oct 15, 2026 · Combined Synopsis/Solicitation (this version)Due Nov 7, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Champion Creek Pit Rock Crushing SupplyThe Forest Service (SAM.gov lists White River National Forest) wants a small business to crush rock at Champion Creek Pit and stockpile 20,000 cubic yards of road gravel.