Solicitation
Request for Proposal EFMO 224159/318539, Rehabilit
Department of the Interior · National Park Service
AI summary Beta
This summary may miss requirements: 8 of 20 attachments weren't read (B08_Attachment_5a_Solit_PSP_Cover.rtf, B08_Attachment_9_Solit_PSP_Vol_II__Price_Schedule.xlsx and 6 more). Check the attachments on SAM.gov.
The National Park Service (NPS) Denver Service Center seeks proposals under solicitation 140PP027R0001 to rehabilitate the Effigy Mounds National Monument visitor center and redesign and repave its parking and maintenance area, in Harpers Ferry, Iowa. SAM.gov gives no set-aside, but an answer in Amendment 0002 calls it an ISBEE set-aside. The response due date is December 7, 2026, 2:00 PM Mountain, and funds are not yet available.
Who can bid (4)
- Set-aside status is unclear: SAM.gov states none, but a posted answer says this is an ISBEE set-aside. Ask the contracting officer who may bid. From Amendment_002_0002.pdf
- Active SAM.gov registration at the time you submit your offer From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
- Bid guarantee: an SF 24 bid bond or other suitable guarantee with the offer From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
Show all 4Show fewer
- For the Visitor Center Move line item: an IT specialist on site, with a resume showing network qualifications and five government or NPS IT project references From Amendment_002_0002.pdf
How to submit: Not stated in the part read; the solicitation says proposals and questions go as set out in Section L. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 9, 2026.
- Serious: Set-aside conflict: none on SAM.gov, ISBEE in a posted answer. SAM.gov shows no set-aside, while Amendment 0001 and Amendment 0002 answer that this is an ISBEE set-aside; ask the contracting officer who is eligible before spending bid effort. From Amendment_002_0002.pdf
- Serious: Funds are not yet available. No award will be made until funds are available, and the Government may cancel the solicitation without paying offerors' costs. From Sol_140PP027R0001.pdf
- Worth checking: Certified cost or pricing data and a heavy price package. Offerors must send certified cost or pricing data with supplier and subcontractor quotes, payroll samples and rate letters, which is costly for a small firm to prepare. From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
Show all 8Show fewer
- Worth checking: Bid guarantee and bonding. You need a surety for a bid bond with the offer, and a letter from your bonding company showing your bond rate. From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
- Worth checking: Two different sets of submission instructions. A bidder asked which of two sets of instructions to follow, and the answer does not say which governs; ask the contracting officer. From Amendment_002_0002.pdf
- Worth checking: Information technology work in the Visitor Center Move. The move line item needs an IT specialist to relocate and reconnect a live network rack, with resumes and five IT project references. From Amendment_002_0002.pdf
- Worth checking: Safety record is scored. Offers must include OSHA 300A logs for three years and the current EMR, and fewer incidents and a lower EMR score better. From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
- Minor: Solicitation numbers differ between documents. SAM.gov, the SF 1442 and the amendments show 140PP027R0001, while the schedule and page footers show 140P2026R0079 and 140PP2027R0001; confirm the number to use on your files. From B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf
Read from the notice and 12 attachments. 8 of 20 not read. Show which files.
- Sol_140PP027R0001_Amd_0002.pdf (read)
- Sol_140PP027R0001_Amd_0001.pdf (read)
- Sol_140PP027R0001.pdf (read)
- Amendment_002_0002.pdf (read)
- Amendment_001_0001.pdf (read)
- B08_Attachment_1_EFMO_318539-224159_Final_CD_Specifications.pdf (read)
- B08_Solit_Clauses_Construction_REQD_RFO_Updates_RELEASE_v14_13March2026_(AutoRecovered).pdf (read)
- B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.docx (read)
- B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD(1).docx (read)
- B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf (read)
- B08_Attachment_11_Solit_PSP_Vol_II_GenRefs.docx (read)
- B08_Attachment_12_Solit_PSP_Vol_II_Proposed_Equals.docx (read)
- B08_Attachment_5a_Solit_PSP_Cover.rtf: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Attachment_9_Solit_PSP_Vol_II__Price_Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Attachment_10_Solit_PSP_Vol_II_LimitSubcontracting.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Attachment_2a_EFMO_224159_FinalCD_Dwgs.pdf: not summarized: open it on SAM.gov
- B08_Attachment_2b_EFMO_318539_VC_FinalCD_Dwgs.pdf: not summarized: open it on SAM.gov
- B08_Attachment_5b_Solit_PSP_Vol_I_Key_Personnel_Resume_Form.pdf: not summarized: open it on SAM.gov
- B08_Attachment_4-DOL-WD-Bldg_IA20260031.pdf: not summarized: open it on SAM.gov
- B08_Attachment_3_DOL-WD-Hvy-Hwy_IA20260028.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Visitor center base work: structural safety and foundation improvements, with remodeling of the basement and main floor
- Redesign and repave the visitor parking lot and maintenance area (parking lot replacement, marked Fed Hwy in the price schedule)
- Provide a temporary visitor center trailer in the parking lot and temporary office space rental and moving
- Move the visitor center collections, and relocate the network rack to a temporary location and reconnect it (an information technology specialist is required for this line)
- Seven priced options: HVAC and fire suppression; exterior envelope renovation; interior accessibility, plumbing and electrical; low voltage conduit; lightning protection; meeting room, auditorium audio-visual and exhibit renovation; and an expanded deck at the northeast corner
- Complete the Standard Form 1442 (SF 1442, the form you sign and return as your offer), a price schedule and a subcontracting percentage worksheet
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work costs), with a base and seven option line items
- Place of performance
- Effigy Mounds National Monument, Harpers Ferry, Iowa (as Section C of the solicitation states it)
- Estimated value
- Magnitude of construction: more than $10M (the range the form gives, not a Government estimate)
- How they'll choose
- Best Value Continuum tradeoff process: non-price factors combined are significantly more important than price
- Offers due
- December 7, 2026, 2:00 PM Mountain
- How to submit
- Not stated in the part read; the solicitation says proposals and questions go as set out in Section L
- Page limits
- Page counts include cover letters, tabs and tables of contents (Amendment 0002); the page limits themselves were not in the part read
What they'll judge offers on
- Factor 1, Project Experience: relevant projects of similar scope and size, technical knowledge, management and problem solving
- Factor 2, Technical Approach: realistic, efficient approach that meets the contract requirements
- Factor 3, Management Approach: management practices, cost and quality control, team structure and lines of communication
- Factor 4, Schedule: critical path, sequencing, procurement lead times and finishing within the required period
- Factor 5, Key Personnel Experience: key personnel on similar projects
- Factor 6, Safety: safety program, project risk assessment, safety personnel, OSHA 300A incident logs and Experience Modification Rate (EMR, an insurance safety rating)
- Past Performance: success and quality on similar projects, based on questionnaires, CPARS (the federal contractor rating system) and other sources
- Small Business Participation: extent of small business commitment (small business prime offerors receive the maximum score)
- Price: evaluated for fairness, reasonableness and unbalanced line items, with all option prices added to the base
What to include when you submit
- Volume I (non-price) covers project experience, technical approach, management approach, schedule, key personnel, safety and past performance; the Experience Questionnaire may be used or a format with the same information, one form per project, no more than ten projects in total
- Safety: send your safety program overview, a safety risk narrative, the Project Site Safety Manager's name, resume and training, OSHA 300A logs for the previous three calendar years, and an insurance statement showing your current EMR
- Past performance: have references complete the Past Performance Questionnaire for projects of the same scope and complexity, and disclose any less than satisfactory contract in a narrative
- Key personnel resumes may be on any form with the same information as the key personnel resume form (Amendment 0002)
- Volume II (business and price) goes in an original and one copy: SF 1442 blocks 14 through 20C only, signed by an official who can bind the company, plus signed acknowledgment of all amendments
- Volume II also needs the price schedule with a schedule of values, certified cost or pricing data in FAR Table 15-2 format, three supplier quotes for material, three quotes per subcontractor, payroll samples, a bonding company letter showing your bond rate, and overhead and profit support
- Volume II also needs the completed representations and certifications (Section K), the General References form and the Subcontracting Percentage Worksheet
- Send a bid guarantee: SF 24 bid bond or another suitable guarantee
- For the Visitor Center Move line item (CLIN 0004), send a resume of the on-site information technology (IT) staff and a project reference showing at least five projects working directly with government or NPS IT teams on a similar project
Not in the notice text
- Parts of the solicitation were left out when read (the middle of the clauses and Sections H through L, the specifications, and the drawings and wage determinations), so details here may be incomplete. Check the posted files on SAM.gov.
- The site visit date and whether attendance is required are in Section L, which was not read; Amendment 0001 says to coordinate with the Contracting Officer if another site visit is needed.
- How to submit the proposal (email or portal) and the page limits are in Section L, which was not read.
- The period of performance, with the days to begin and finish, is on the SF 1442, whose number blocks did not read clearly; check the form on SAM.gov.
- The wage rules are in two Department of Labor wage determination files (IA20260028 and IA20260031) attached but not read.
- The price schedule and subcontracting limits spreadsheets and the drawings are attached but not read.
- A Government estimate is not stated; the form gives only the magnitude of construction as more than $10M.
- Who the incumbent is, and how many firms are expected to bid, are not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 9, 2026
- Notice type
- Solicitation
- Office
- National Park Service Contracting Activity, Denver, CO
- Product/service code
- Z2QA · Repair or Alteration of Restoration of Real Property (Public or Private)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
5 versions have been posted, newest first.
- Nov 9, 2026 · Amendment 0002 (this version)Due Dec 7, 2026
- Oct 30, 2026 · Amendment 0001Due Dec 7, 2026
- Oct 23, 2026 · SolicitationDue Dec 7, 2026 (changed)
- Oct 6, 2026 · PresolicitationDate Nov 11, 2026
- Oct 5, 2026 · Special NoticeDate Nov 11, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract