Solicitation
400 Hz Cycle Converters - Maintenance, Inspections, and Repairs
Department of Defense · Department of the Army
Small business set-aside · Tobyhanna, PA
AI summary Beta
This summary may miss requirements: 3 of 7 attachments weren't read (Attachment III Proposed Pricing Worksheet.xlsx, Attachment IV 400 Hz Converters List.xlsx and 1 more). Check the attachments on SAM.gov.
The Army Contracting Command at Aberdeen Proving Ground (ACC-APG), Tobyhanna Division, wants preventative maintenance, diagnostic inspections and repairs on approximately thirty-nine (39) 400 Hz cycle converters at Tobyhanna Army Depot (TYAD), Pennsylvania. This is request for quote (RFQ) W51AA127QA004, and only small businesses can bid. It is a firm-fixed-price (FFP: one set price, whatever the work ends up costing) purchase order with a base year starting February 6, 2027, four option years and up to six more months. The response due date is December 14, 2026, 4:00 PM Eastern.
Who can bid (8)
- Small business set-aside: only small businesses can bid (NAICS 811210, size standard $34.0 million in average annual receipts)
- CMMC Level 2 (Self) status in SPRS, with a current annual affirmation, before award for each company system that handles federal contract information or controlled unclassified information From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Active SAM.gov registration with no active exclusions and no delinquent federal debt From RFQ W51AA127QA004 - 400Hz Coverters.pdf
Show all 8Show fewer
- Contract Manager and Alternate Contract Manager with 5 years of experience in the past 10 years (key personnel) From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Lead Field Service Technician with 5 years of hands-on experience in the past 8 years on 400 Hz frequency converters or equivalent industrial power systems from multiple manufacturers (key personnel) From Attachment I Performance Work Statement.pdf
- OSHA 30-Hour safety course certificate for the Contract Manager and direct on-site supervisors From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Non-key technicians with at least 2 years of industrial electrical maintenance experience, working under the Lead Field Service Technician From Attachment I Performance Work Statement.pdf
- Limit on subcontracting: pay no more than 50 percent of the amount paid by the Government to subcontractors that are not similarly situated small businesses From RFQ W51AA127QA004 - 400Hz Coverters.pdf
How to submit: Email to Deborah Belak, Contract Specialist, at deborah.belak.civ@army.mil. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 19, 2026.
- Serious: Small businesses only. This is a total small business set-aside, so a business that is not small under the $34.0 million size standard for NAICS 811210 cannot bid.
- Serious: CMMC Level 2 (Self) required before award. A bidder that handles federal contract information or controlled unclassified information on its systems must already have a current CMMC status and annual affirmation in SPRS, or it is not eligible for award. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Serious: Lead technician needs 5 years on 400 Hz converters. The key personnel resumes are judged acceptable or not acceptable, so a technician without the stated experience can sink the quote. From Attachment I Performance Work Statement.pdf
Show all 11Show fewer
- Worth checking: Site visit December 7, 2026, with a base-access form due November 23, 2026. Visitors without a depot-issued Contractor badge must send Form 648-C to the COR by 12:00 PM on November 23, 2026 for background checks; the text does not call attendance required. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Worth checking: 48-hour on-site emergency response. A technician must reach the depot within 48 hours of a call, and the quote must show the ability to meet that. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Worth checking: Solicitation number differs between documents. SAM.gov gives W51AA127QA004, but the submission instructions name W51AA1-27-Q-A007 for the email subject line and the quality plan names W51AA1-26-Q-A057; ask the contracting specialist which to use. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Worth checking: Past performance is evaluated but no submission is requested. The evaluation lists past performance as a factor, yet the quote instructions in the text read list no past performance volume; ask what to send. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Worth checking: Emergency repair line is unpriced but the instructions ask for its price. CLIN 0005 is an unpriced line funded later by a bilateral modification, yet Volume I asks for prices on CLINs 0001 through 0005. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Worth checking: Base access screening can delay work. Every worker needs depot security screening before entering, and access may be delayed or denied. From Attachment I Performance Work Statement.pdf
- Worth checking: Half of the work must stay with small business partners. The limits on subcontracting clause caps payments to subcontractors that are not similarly situated small businesses at 50 percent of the amount the Government pays. From RFQ W51AA127QA004 - 400Hz Coverters.pdf
- Minor: Repair line number differs between documents. The schedule puts emergency repairs on CLIN 0005, but the quality plan says repairs are funded under CLIN 0003; ask which is right. From Attachment II Quality Assurance Surveillance Plan.pdf
Read from the notice and 4 attachments. 3 of 7 not read. Show which files.
- RFQ W51AA127QA004 - 400Hz Coverters.pdf (read)
- Attachment I Performance Work Statement.pdf (read)
- Attachment II Quality Assurance Surveillance Plan.pdf (read)
- Attachment V 648C Request for Access to TYAD.pdf (read)
- Attachment III Proposed Pricing Worksheet.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment IV 400 Hz Converters List.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- W51AA1-27-Q-A004 Questions and Answers 1.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Quarterly preventative maintenance (PM: scheduled upkeep) and inspections on Tier I units: contract line item number (CLIN: one priced line of the order) 0001, QTY 4 Lot
- Semi-annual PM and inspections on Tier II units: CLIN 0002, QTY 2 Lot
- Annual PM and inspections on Tier III units: CLIN 0003, QTY 1 Lot
- 48-hour response, troubleshooting under load and a diagnostic visit with a repair quote: CLIN 0004, QTY 4 Lot
- Approved emergency repairs: CLIN 0005, QTY 1 Lot, an unpriced line; no work is authorized until the Government signs a bilateral modification (a contract change both sides sign)
- The same five lines repeat in each of four option years (CLINs 1001 to 4005)
- Provide all personnel, tools, travel, lodging and equipment; travel and lodging are not paid separately and must be built into the fixed prices
- Within 10 calendar days after award, send a quality control plan (QCP: how you check your own work) and a Work Plan to the contracting officer's representative (COR)
- Contract type
- Firm-fixed-price (FFP) purchase order under FAR Part 12 (commercial products and services) simplified procedures
- Period of performance
- Base period February 6, 2027 to February 5, 2028, four one-year options through February 5, 2032, and up to a 6-month extension under clause 52.217-8; total including options may not exceed 66 months
- Place of performance
- Tobyhanna Army Depot, Tobyhanna, PA 18466
- Remote work
- Partial. From Attachment I Performance Work Statement.pdf:
The work to be performed under this contract will be performed on-site at Tobyhanna Army Depot, Tobyhanna, PA 18466, and remotely through web/telephone technical support as required.
- Estimated value
- Not stated
- How they'll choose
- Best overall value tradeoff: the Government may pay more for a better offer, and award may not go to the lowest price
- Offers due
- December 14, 2026, 4:00 PM Eastern
- How to submit
- Email to Deborah Belak, Contract Specialist, at deborah.belak.civ@army.mil
- Page limits
- Capability / Technical Approach Summary: 3 pages maximum
What they'll judge offers on
- Price: unit prices and extended amounts, with all option prices added to the base
- Technical: key personnel (resumes, OSHA 30-Hour certificates) and a capability narrative, judged acceptable or not acceptable
- Past performance: listed as a factor, but the quote instructions in the text read ask for no past performance submission
What to include when you submit
- Volume I Price Quote: complete SF 1449 (Standard Form 1449, the form you sign and return as your offer) blocks 30a, 30b and 30c, acknowledging all amendments and confirming agreement to the 60-day acceptance period
- Volume I: unit prices and extended amounts for CLINs 0001 through 0005 and all option years, plus Attachment III, the Proposed Pricing Worksheet
- Volume II Key Personnel & Technical: resumes for the Contract Manager and Alternate Contract Manager showing at least 5 years of experience within the past 10 years managing industrial equipment maintenance, electrical systems or similar facility support contracts
- Volume II: a resume for the Lead Field Service Technician showing at least 5 years of hands-on experience within the past 8 years on 400 Hz frequency converters or equivalent industrial power systems from multiple manufacturers
- Volume II: a copy of the OSHA 30-Hour safety course certificate for the Contract Manager and direct on-site supervisor(s)
- Volume II: a capability narrative of at most 3 pages on experience with 400 Hz cycle converters from multiple manufacturers, access to OEM (original equipment manufacturer) replacement parts, and ability to meet the 48-hour response requirement
- Put the solicitation number in the email subject line, and confirm in writing with the Contract Specialist that the quote was received before the response due date; delays at email providers count as late
- Send questions by email to Deborah Belak no later than five calendar days before the RFQ response date
- List the CMMC (Cybersecurity Maturity Model Certification) unique identifiers from SPRS (the Supplier Performance Risk System) for each company system that will handle federal contract information or controlled unclassified information
- Hold prices firm for at least 60 days from the response due date
After award, you must have
- Background check and approval from depot law enforcement for every worker before on-site access From Attachment I Performance Work Statement.pdf:
A background check and approval from TYAD Law Enforcement is required for all contractor and…
Current contractor
No incumbent is named, and no previous contract number or recompete wording appears in the text read.
Not in the notice text
- Attachment III (Proposed Pricing Worksheet), Attachment IV (400 Hz Converters List) and W51AA1-27-Q-A004 Questions and Answers 1.xlsx are attached on SAM.gov but not read; the converter list and posted answers may change requirements.
- The middle of Attachment I Performance Work Statement.pdf was attached but not read; the Tier I, II and III task details (PWS 5.2) are likely there.
- Which converters are in Tier I, Tier II and Tier III is not in the text read.
- The text read gives no past performance instructions even though past performance is an evaluation factor.
- Attachment V (Form 648-C) came through as an unreadable placeholder; check the form on SAM.gov.
- The question deadline is given only as five calendar days before the response date, not as a calendar date.
- The time zone for the site visit and the Form 648-C deadline is not stated.
- The Service Contract Act wage determination (No. 2015-5797, Revision No. 33) is cited, but its wage rates were not in the text read.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- W6QK ACC-Apg Cont CT Tyad Ofc, Tobyhanna, PA
- Product/service code
- J059 · Maint/Repair/Rebuild of Equipment – Electrical and Electronic Equipment Components
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811210)
- Versions
2 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0001 (this version)Due Dec 14, 2026
- Nov 19, 2026 · SolicitationDue Dec 14, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Automatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel InspectionThe Department of Veterans Affairs (VA) wants a contractor to inspect, test, maintain and repair automatic transfer switches (ATS) and isolation electrical power panels at the…
- CTX VAMC Maintenance, Calibration, Inspection, and Testing of the Electrical Power Distribution SystemSolicitation 36C25727Q0089: only service-disabled veteran-owned small businesses (SDVOSBs) listed in VA's Vendor Information Pages (VIP) can bid.