Combined Synopsis/Solicitation
Airlift Efficiency Commercial Solutions Opening (CSO)
Department of Defense · Department of the Air Force
A newer version of this notice was posted Nov 9, 2026. It moves the due date from Feb 26, 2026 to Feb 26, 2028, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Jan 8, 2026. The notice was amended Nov 9, 2026. Check what else changed on SAM.gov.
The Air Force (763rd Enterprise Sourcing Squadron, for its Operational Energy Office) is running a Commercial Solutions Opening for airlift efficiency ideas, with the first Area of Interest asking for a new 35,000-50,000 lb thrust turbofan engine for the C-17 and blended wing body aircraft. It is a two-step process: a short solution brief first, then a detailed approach for those selected. Work is managed from Scott AFB, IL.
Who can bid (5)
- Open to all businesses (no set-aside); small businesses are encouraged to propose From FA4452-25-S-C001 Airlift Efficiency CSO Solicitation.pdf
- Active SAM.gov registration with annual representations and certifications is needed to receive an award
- Foreign companies cannot be the prime contractor; foreign national participation is limited to public domain information From FA4452-25-S-C001 Airlift Efficiency CSO Solicitation.pdf
Show all 5Show fewer
- Non-federal sources must cover at least one-third of the total prototype project cost, with evidence provided From Area of Interest (1) - BWB C-17 Propulsion.pdf
- If export controls apply, a certified DD Form 2345 must be submitted with the solution brief From FA4452-25-S-C001 Airlift Efficiency CSO Solicitation.pdf
How to submit: Email to the contracting officer (lisa.pendragon@us.af.mil) and contract specialist (madison.tikalsky.1@us.af.mil), due Area of Interest (1) solution briefs due Thursday 13 March 2025, 1400 CST. The notice header shows a response deadline of Feb 26, 2028 and the notice text says the CSO is open until 26 February 2026, so check SAM.gov for the current date.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
- Serious: Aircraft engine development scale. The Air Force wants a new jet engine with a production ramp to 80 engines per month, which only large engine makers or well-funded teams could realistically deliver. From Area of Interest (1) - BWB C-17 Propulsion.pdf
- Serious: Required cost share from non-federal sources. Bidders must show private money covering at least a third of the prototype cost, which is a heavy financing burden for a small business. From Area of Interest (1) - BWB C-17 Propulsion.pdf
- Worth checking: Date passed (Feb 26, 2026): Conflicting dates. The notice header lists a 2028 deadline, the text says the CSO closes 26 February 2026, and the engine area's briefs were due 13 March 2025, so it is unclear whether anything is still open.
Show all 6Show fewer
- Worth checking: Export control and clearance paperwork. ITAR/EAR rules may apply, with possible security reviews and an extra DD Form 2345 filing, adding compliance work before you can bid. From FA4452-25-S-C001 Airlift Efficiency CSO Solicitation.pdf
- Minor: Government may award nothing or only part. The Air Force can fund part of a proposal, fund in increments, or make no award, so proposal costs may not be recovered.
- Minor: No contract value stated. Neither the notice nor the attachments give a budget or award size, though the area text mentions a $35-40 billion market through 2045.
Read from the notice and 2 attachments. Show which files.
- FA4452-25-S-C001 Airlift Efficiency CSO Solicitation.pdf (read)
- Area of Interest (1) - BWB C-17 Propulsion.pdf (read)
Full summary
What they want
- A turbofan engine rated 35,000-50,000 lbs thrust (sea-level static) usable by both military and commercial aircraft
- Engine that meets current and known future emissions standards and can burn Jet A and up to 100% sustainable aviation fuel
- Entry into service by 2030 (or an expected availability date if that can't be met)
- A production ramp-up plan: 40 engines per month plus spares by 2035 and 80 per month plus spares by 2037
- A cost-share or other financing plan for development and initial manufacturing, with non-federal sources paying at least one-third of the prototype cost
- Ways to lower life-cycle costs (maintenance, repair, overhaul, fuel use)
- A product roadmap, or a modification of an existing product, with a timeline and rough cost estimate
- Contract type
- Firm-fixed-price contract expected; the Air Force reserves the right to award an Other Transaction for a prototype project instead
- Place of performance
- Scott AFB, IL (contracting office); work location not stated
- Estimated value
- Not stated
- Contract vehicle
- Commercial Solutions Opening FA4452-25-S-C001 (DFARS 212.70), Area of Interest (1)
- How they'll choose
- Two-step review by scientific, technological and other subject-matter experts. Step one briefs are rated Selectable or Not Selectable; step two detailed approaches are rated Acceptable or Not Acceptable.
- Offers due
- Area of Interest (1) solution briefs due Thursday 13 March 2025, 1400 CST. The notice header shows a response deadline of Feb 26, 2028 and the notice text says the CSO is open until 26 February 2026, so check SAM.gov for the current date. (from the version posted Jan 8, 2026; amended since)
- How to submit
- Email to the contracting officer (lisa.pendragon@us.af.mil) and contract specialist (madison.tikalsky.1@us.af.mil)
- Page limits
- Step one: 5 pages (12-point Times New Roman, 1-inch margins) or 15 slides, not counting title page or table of contents. Extra pages or slides are removed and not evaluated.
What they'll judge offers on
- Technical
- Importance to agency
- Price
What to include when you submit
- Section A: project title, company name, business size, CAGE code, UEI, contracting POC and technical POC
- Section B: technical solution addressing each concept requirement
- Section C: product roadmap and development plan with timeline, rough cost estimate, and evidence of non-federal cost share
- Submit unclassified material only
- Briefs stay valid for 180 calendar days after submission
- Mark proprietary data with the legend given in the solicitation
- Step two (by invitation): full detailed approach with statement of work, schedule, government support needed, and a total price
Not in the notice text
- Whether any Area of Interest is still open given the conflicting dates
- Budget, award size or number of awards
- Period of performance
- Where the engine development work would be done
- Step two due date and negotiated terms (set only for companies selected after step one)
- Details of any later Areas of Interest posted under this notice
Notice details
Notice type, codes, versions and files
- Posted
- Feb 26, 2025
- Notice type
- Combined Synopsis/Solicitation
- Office
- FA4452 763 Ess, Scott AFB, IL
- Product/service code
- AC33 · National Defense R&D Services; Defense-Related Activities; Experimental Development
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Versions
6 versions have been posted, newest first.
- Nov 9, 2026 · Amendment 0005SAM.gov date Feb 26, 2028
- Jan 8, 2026 · Amendment 0004SAM.gov date Feb 26, 2028 (changed)
- Feb 27, 2025 · Amendment 0003Due Feb 26, 2026
- Feb 27, 2025 · Amendment 0002Due Feb 26, 2026
- Feb 26, 2025 · Amendment 0001Due Feb 26, 2026
- Feb 26, 2025 · Combined Synopsis/Solicitation (this version)Due Feb 26, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Needipedia - Commercial Solutions Opening - CSOThe Defense Intelligence Agency (DIA) is running an open Commercial Solutions Opening (CSO) called NeedipeDIA to collect innovative ideas from any qualified source, in the form…
- Commercial Solutions Opening (CSO)The Defense Logistics Agency (DLA), through its Philadelphia contracting office, runs a Commercial Solutions Opening (CSO), solicitation SP4701-27-S-C001: an open call for…
- Air Combat Command Headquarters (ACC HQ) Acquisition Management Integration Center (AMIC) Commercial Solutions Opening (CSO)Air Combat Command Headquarters (Langley AFB, VA) is running an open-ended Commercial Solutions Opening (CSO), a way to find innovative commercial tech without a fixed statement…
- Finding Agile Solutions for Test (FAST) Commercial Solutions Opening (CSO)The Air Force Test Center (AFTC) uses this Commercial Solutions Opening (CSO) as an umbrella for innovative test and evaluation technology.
- AFWERX Challenge Commercial Solutions Opening (CSO)The Air Force's AFWERX program runs an open Commercial Solutions Opening (a fast, flexible way to buy new technology) with a series of themed Challenges on aviation support…