Solicitation
Gas Line Repair
Department of Defense · Department of the Air Force
Small business set-aside · Offutt AFB, NE
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 6 attachments weren't read (Site Conditions.pdf). Check the attachments on SAM.gov.
The Air Force's 55th Contracting Squadron (FA4600) wants quotes from small businesses to repair gas leaks on natural gas lines at Offutt Air Force Base, Nebraska (solicitation FA460027Q0011). The work is one leaking 6-inch line near building 479 and leaking 8-inch valves near building 73, plus a 2-inch valve. It is construction under a total small business set-aside, with a target price range of $25,000 to $100,000. The response due date is December 8, 2026, 11:00 AM Central (12:00 PM Eastern).
Who can bid (5)
- Small business set-aside: only small businesses can bid (size standard USD 45,000,000.00 on the form)
- Active SAM.gov registration (the federal contractor database)
- Payment bond or irrevocable letter of credit for $35,000 to $150,000; performance and payment bonds above $150,000 From Solicitation - FA460027Q0011.pdf
Show all 5Show fewer
- Welder certifications on record for welding work From PWS Gas Line Repairs rev3.pdf
- Valid ID to enter Offutt AFB, or an approved base entry authorization list form
How to submit: Submit signed and dated offers to the Contracting Office (55 CONS, Offutt AFB); the notice lists the contract specialist and contracting officer emails. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Small business set-aside. Only small businesses can bid, so confirm your firm is under the size standard for this construction code before quoting.
- Serious: Bonding depends on your price. Above $35,000 you need a payment bond or letter of credit, and above $150,000 both performance and payment bonds, which a small firm may not be able to get. From Solicitation - FA460027Q0011.pdf
- Worth checking: Site visit on December 1, 2026. A site visit is set for 1:00 PM CST on base; the text does not call it mandatory, but the PWS says to verify site conditions before work. From Solicitation - FA460027Q0011.pdf
Show all 8Show fewer
- Worth checking: Date passed (Nov 24, 2026): Base entry form due November 24, 2026. Visitors without base ID must return the 55 SFS Form 31 base entry list by that date, and base access is not guaranteed. From Solicitation - FA460027Q0011.pdf
- Worth checking: 8-inch valve work waits on weather. The 8-inch valves are replaced only after warmer weather arrives, so timing is set by a temperature trigger and a Notice to Proceed, not a fixed date. From PWS Gas Line Repairs rev3.pdf
- Worth checking: Gas outages need two weeks' notice. Work and testing need system outages coordinated with the Government and the utility (Black Hills Energy). From PWS Gas Line Repairs rev3.pdf
- Minor: Questions due December 2, 2026. Written questions go to the contracting office by 4:30 PM CST; answers are posted by amendment.
- Minor: Davis-Bacon wage determination applies. Construction wage rules apply, so you must pay at least the wage determination rates for the workers on this job.
Read from the notice and 5 attachments. 1 of 6 not read. Show which files.
- Solicitation - FA460027Q0011.pdf (read)
- PWS Gas Line Repairs rev3.pdf (read)
- 20261015 - Environmental Special Conditions - Division 1-01 57-1C_3 Rev 0.pdf (read)
- 55 SFS Form 31-Base Entry Authorization List.docx (read)
- Wage Determination - Heavy - NE20260051.pdf (read)
- Site Conditions.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Repair the leaking 6-inch gas line near building 479 by replacing the leaking pipe section and the adjacent 6x2-inch service tee (CLIN 0001, QTY 1 Each)
- Replace the leaking, stuck-open 8-inch valves and flanges on the main line near building 73, with new valve boxes and risers marked for gas (CLIN 0002, QTY 1 Each)
- Replace the 2-inch isolation valve on the service line to building 73
- Replace or reconnect any existing cathodic protection (corrosion protection) when replacing the valves
- Pressure test all new piping and valves for at least 1 hour after installation and prove they work
- Provide lock-out/tag-out work and equipment, coordinate gas outages with the utility, and clean up and dispose of removed material off base
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) request for quotation (RFQ) for commercial construction services
- Period of performance
- 6-inch line repair: 30 calendar days from award. 8-inch valve repair: 30 days from the heat-to-cool seasonal transition date, after a Notice to Proceed is sent
- Place of performance
- Offutt AFB, NE, USA
- Estimated value
- Target price range: $25,000 to $100,000 (the solicitation's own figure)
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest-priced quote that is technically acceptable wins; the Government checks the three lowest-priced quotes, starting with the lowest
- Offers due
- December 8, 2026, 11:00 AM Central (12:00 PM Eastern) (from the version posted Nov 19, 2026; amended since)
- How to submit
- Submit signed and dated offers to the Contracting Office (55 CONS, Offutt AFB); the notice lists the contract specialist and contracting officer emails
- Page limits
- Technical plan: 10 pages; pages beyond 10 are discarded
What they'll judge offers on
- Price: total evaluated price, the sum of the line item prices, checked for reasonableness; option prices are added if there are any
- Technical Capability: a plan of up to 10 pages rated acceptable or not acceptable against the performance work statement (PWS: the document listing the tasks)
What to include when you submit
- Submit a signed and dated offer showing the solicitation number, your name, address and telephone number, and your Unique Entity Identifier (UEI).
- Include one electronic copy of the completed pricing, following the contract line item number (CLIN: one priced line of the order) structure, and fill out the solicitation completely.
- Include a plan of no more than 10 pages describing how you will meet the PWS requirements.
- State how far you agree with all terms, conditions and provisions in the solicitation and any amendments.
- Complete the representations and certifications the solicitation asks for that are not already in SAM.gov.
- Identify any potential conflict of interest or appearance of one (organizational conflict of interest).
- Keep your offer valid for 30 days.
- Bonding by price: payment bond or irrevocable letter of credit for work over $35,000 up to $150,000; performance and payment bonds over $150,000. No bid guarantee is required.
Not in the notice text
- The "Site Conditions.pdf" file is attached on SAM.gov but is a scanned PDF that was not read, so site details in it are unknown.
- The text does not say the site visit is mandatory.
- The text does not say when bonds must be delivered (with the offer or after award).
- The notice does not name an incumbent or say whether this is a follow-on contract.
- The notice does not give the date of the heat-to-cool seasonal transition that starts the 8-inch valve work.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- FA4600 55 CONS PKP, Offutt AFB, NE
- Product/service code
- J047 · Maint/Repair/Rebuild of Equipment – Pipe, Tubing, Hose, and Fittings
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 23712)
- Versions
3 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0002Due Dec 8, 2026
- Nov 19, 2026 · Amendment 0001 (this version)Due Dec 8, 2026
- Nov 19, 2026 · SolicitationDue Dec 8, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- 12445127B0001 AZ Lakeside Office Sewer Line ReplacementThe U.S. Department of Agriculture, Forest Service (USDA-FS, CSA East 11), for the Apache-Sitgreaves National Forests, wants a small business to replace the sewer service line at…
- Mud Mountain Dam Sewage Lagoon RepairArmy Corps of Engineers Seattle District (solicitation W912DW27QA006) wants a business to clean and repair the sewage lagoon liner at Mud Mountain Dam in Enumclaw, WA. Only small…
- FCI Marion - Emergency Repair Tornado DamageThe Federal Bureau of Prisons wants a small business to repair tornado damage at FCI Marion, a federal prison in Marion, Illinois.
- Savannah ANG Repairs Pre-Solicitation NoticeU.S. Army Corps of Engineers Omaha District posted a presolicitation (W9128F27RA053PN), set aside totally for small businesses, for repairs and maintenance of Tanks 964 and 967…
- Mather Fueling System RepairsThe Army Corps of Engineers (Omaha District) wants repairs and upgrades to the fueling system at Mather, California.