Solicitation
Solicitation for Asbestos Removal Supervision Service
Department of State
AI summary Beta
The U.S. Embassy Seoul's Bureau of Overseas Buildings Operations wants a registered asbestos supervisor to oversee the asbestos removal contractor before demolition at the New Embassy Compound site in Seoul, Korea (solicitation 19KS7027Q0007). The base is 45 performance days, with up to 15 more days as an option, for one firm-fixed-price (one set price, whatever the work costs) quote. The response due date is November 30, 2026, 5:00 PM Seoul local time. The supervisor must be registered under Korean asbestos law.
Who can bid (7)
- Registered as an asbestos dismantling/removal supervision provider under Korean law (Asbestos Safety Management Act); registration certificate is submitted with the quote From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Authorized to do business in Korea, with all licenses and permits needed to perform the contract From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- At least one assigned Advanced Asbestos Supervision Personnel (Korean advanced supervisor qualification), employed by the offeror From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
Show all 7Show fewer
- The proposed supervisor (or liaison) must be an employee of the offeror and speak, understand and write both English and Korean From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Proof of SAM registration if the price offer is over 40,000 USD From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Past performance and experience: client list from the past two years with references and asbestos work details From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- An established business with a permanent business address and telephone listing From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
How to submit: The SF 1449 (Standard Form 1449, the form that serves as your offer) names the Contracting Officer, Helen No, with email SeoulProposals@state.gov; the text does not say outright that quotes go there.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 12, 2026.
- Serious: Korean supervisor registration required. A business must already hold the Korean registration for asbestos dismantling supervision, so most U.S. small businesses without a Korean registered entity cannot bid. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Serious: Must be authorized to do business in Korea. The offeror warrants it has local authorization, all licenses and permits, and will follow Korean laws, decrees and labor standards; a subcontractor or joint venture partner doing the work must agree to the same. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Serious: Korean-qualified, Korean-employed supervisor. The proposed supervisor must hold the Korean advanced supervision qualification, speak English and Korean, and work for the offeror, with Korean employment and insurance proof issued within 30 days of the quote due date. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
Show all 8Show fewer
- Serious: On site in Seoul for the whole asbestos job. The supervisor must stay on site while asbestos is removed, on a 6-day work week, so you need people in Seoul for the whole job. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Worth checking: Prices in Korean won, no VAT. Quotes are priced in Korean won, so exchange-rate risk is yours; the Government will not pay value added tax (VAT, a Korean sales tax) because the Embassy has a tax exemption. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Worth checking: Option days paid only when exercised. CLIN 0002 is a daily-rate option of up to 15 days that the Government may or may not use; it is included in the price evaluation. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Worth checking: Schedule dates may move. The Contracting Officer may change the calendar dates to match the actual asbestos removal schedule, which depends on another contractor. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
- Minor: Final report due after the supervision ends. The final completion report is a deliverable after the on-site work ends. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx
Read from the notice and 1 attachment. Show which files.
- RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx (read)
Full summary
What they want
- Review the asbestos removal work plan and check that it is followed
- Check the work-area containment, the negative-pressure equipment (fans that keep dust inside the work area) and the hygiene facilities (worker wash and change areas)
- Supervise protective equipment use and safety rules, and check air monitoring and the air tests after the work
- Check how asbestos waste is stored and removed, and request corrective action or stop work if the law is being broken
- Be on site throughout the asbestos removal work; the schedule assumes a 6-day work week
- Attend a kick-off meeting, weekly progress meetings and a closeout meeting, and send meeting notes to the Contracting Officer's Representative (COR, the Government's technical contact) within seven days
- Send a supervision plan with reporting procedures, and a final completion report within 30 days of the supervision end date
- Contract type
- Firm-fixed-price (FFP): CLIN 0001 is a lump sum (QTY 1, Lot) for 45 performance days. CLIN 0002 (contract line item number, one priced line of the order) is an option at a daily rate (QTY 15, Day, maximum).
- Period of performance
- Base: 45 performance days from the Notice to Proceed, plus an option of up to 15 more performance days. The schedule is estimated to start in February 2027 and run 45-60 days; the listed supervision period is 02/01/2027 to 03/15/2027, and the Contracting Officer may adjust the dates in writing.
- Place of performance
- U.S. Army Garrison Yongsan area, Yongsan-gu, Seoul, Republic of Korea (1 GA 1-5 Yongsan-dong, Yongsan-gu, Seoul)
- Remote work
- No. From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx:
The Contractor must remain available onsite throughout the duration of asbestos removal works.
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest priced quote that passes the technical review wins. Price is the offered prices times the estimated quantities, including the option.
- Offers due
- November 30, 2026, 5:00 PM Seoul local time (UTC+9)
- How to submit
- The SF 1449 (Standard Form 1449, the form that serves as your offer) names the Contracting Officer, Helen No, with email SeoulProposals@state.gov; the text does not say outright that quotes go there.
What they'll judge offers on
- Technical acceptability: past performance and experience as described in the instructions, plus any technical information in the quote
- Price: offered prices multiplied by the estimated quantities, with the option included
What to include when you submit
- Price quotation: complete SF 1449 blocks 12, 17, 19-24 and 30, plus Section 1 and Section 5 (the representations and certifications)
- Price both CLINs in Korean won (KRW): CLIN 0001 as a lump sum for 45 performance days and CLIN 0002 as a daily rate, with no line for value added tax (VAT)
- Include proof of SAM registration (System for Award Management, the federal vendor registry) if the price offer is over 40,000 USD
- Show an established business with a permanent business address and telephone listing
- List clients from the past two years with relevant experience, past performance and references: customer name, address, phone, email and contacts, contract award date, place of work, completion date, value, and a description of the asbestos work done, including the amount and type of asbestos removed
- Give the name and resume of the proposed asbestos supervision personnel (or an embassy liaison), confirming he or she speaks, understands and writes English and Korean; the person must be employed by the offeror
- For each proposed person include resumes, professional qualification certificates, a certificate of employment and proof of enrollment in a statutory social insurance program, issued within 30 days of the quotation due date
- Include the asbestos supervision provider registration certificate and proof that at least one proposed person qualifies as Advanced Asbestos Supervision Personnel under Korean law
- Include a brief supervision plan: how you will supervise the work, coordinate with the asbestos removal company and keep the client informed
- Submit the offer in English
After award, you must have
- Workers' compensation insurance under the Defense Base Act (a U.S. law for contractor employees working overseas for the Government) From RFQ 19KS7027Q0007_Asbestos_Supervision Service.docx:
52.228-3 WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT)
Current contractor
No incumbent is named for this supervision service. The asbestos removal contractor the supervisor will oversee is named as Ilwon Environment Co., Ltd.
Not in the notice text
- The method for sending quotes is not stated outright; the SF 1449 lists the Contracting Officer's email, SeoulProposals@state.gov. Confirm with the Contracting Officer.
- No site visit or question deadline is given in the notice or the attached RFQ.
- The Government's price estimate is not given.
More to check before you bid
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 12, 2026
- Notice type
- Solicitation
- Office
- U.S. Embassy Seoul
- Product/service code
- C1LB · Architect and Engineering – Construction: Highways, Roads, Streets, Bridges, and Railways
- Business type
- Consulting & professional services (FedReady's grouping, from NAICS 54162)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- BSFB Asbestos Survey ServicesThe Air Force's 460th Contracting Squadron (460 CONS) wants asbestos surveys, sampling and air monitoring at Buckley Space Force Base in Aurora, Colorado (solicitation…
- 2027 Construction Inspection Services Multiple Award Task Order Contract (MATOC)Phase I (qualifications) of a Federal Highway Administration buy: up to four indefinite delivery, indefinite quantity (IDIQ: orders placed over time against a ceiling) contracts…
- Sources Sought Notice: Asbestos and Lead Management ServicesThe National Institutes of Health (NIH) wants small businesses to send a capability statement (a short paper on what your firm can do) for a future contract for asbestos, lead…