Solicitation
Elevator Refurbish and Maintenance, SLC ATCT, Salt Lake City, UT
Department of Transportation · Federal Aviation Administration
Small business set-aside · Salt Lake City, UT
AI summary Beta
The notice looks incomplete: The middle of the solicitation (181,526 characters of contract clauses, the attachment list and the representations and certifications) was attached but not read, so completion time, bonding and insurance amounts may be missing. Check the attachments on SAM.gov.
Solicitation 697DCK-27-R-00021: the Federal Aviation Administration (FAA) wants an elevator contractor to modernize two elevators, a tower elevator and a base building elevator, at the Salt Lake City air traffic control tower, then maintain them for one year. It is a total small business set-aside, awarded to the lowest price among acceptable offers, with a response due date of December 18, 2026, 5:00 PM Mountain (7:00 PM Eastern). The agency's estimated magnitude of construction is $1,000,000 to $5,000,000.
Who can bid (4)
- Small business concern: the first round of award is open to small businesses only From SIR 697DCK-27-R-00021.pdf
- Use your own organization for at least 25 percent of the on-site work (special trade contractors) From SIR 697DCK-27-R-00021.pdf
- At least three relevant projects underway or completed within the last five years From SIR 697DCK-27-R-00021.pdf
Show all 4Show fewer
- Qualified elevator mechanics, work crews and supervisors, with state or local trade licenses where required From Attachment 01 PWS Elevator Refurbishment SLC UT.pdf
How to submit: Email to Linda.Hennequant@faa.gov with the SIR number 697DCK-27-R-00021 in the subject line; Word or PDF files, not zipped; the FAA email limit is 10MB per message, so split large offers into several emails. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 18, 2026.
- Serious: Total small business set-aside. Only small businesses are considered first; if fewer than two small business offers arrive, the FAA may award among all responsible offers. From SIR 697DCK-27-R-00021.pdf
- Worth checking: Question deadline stated two ways. The notice says questions are due four days before the response due date; the solicitation says three business days before it.
- Worth checking: Site visit sign-up lead time stated two ways. The notice asks for attendee details at least one week before a visit; the solicitation says at least two days in advance.
Show all 8Show fewer
- Worth checking: Site visits on November 30, December 1 and December 2, 2026. Attendance is strongly encouraged, not required; the FAA expects bidders to inspect the site and site conditions are the bidder's risk.
- Worth checking: Wage rules: Davis-Bacon Act listed; attached wage determinations are Service Contract Act ones. The clause list includes the Davis-Bacon Act (federal pay rates for construction), but the two attached wage determinations are Service Contract Act lists. Ask which applies to which work. From SIR 697DCK-27-R-00021.pdf
- Worth checking: Work blocked around holidays. No on-site construction in the week of and the weekend before Thanksgiving, Christmas and New Year's Day, and air traffic can restrict access at other times. From SIR 697DCK-27-R-00021.pdf
- Worth checking: Tight maintenance service levels. Service calls need a response within one hour, any time of day, with outages limited to one per quarter per elevator. From Attachment 01 PWS Elevator Refurbishment SLC UT.pdf
- Minor: Assume asbestos in brake shoes. Asbestos removal work is not in scope, but the contractor must handle existing brake shoes as asbestos-containing under the rules. From Attachment 01 PWS Elevator Refurbishment SLC UT.pdf
Read from the notice and 5 attachments. Show which files.
- SIR 697DCK-27-R-00021.pdf (read)
- Attachment 01 PWS Elevator Refurbishment SLC UT.pdf (read)
- Attachmant 04 Form Past Performance_Experience Info.pdf (read)
- Attachment 03 WD UT20260085 08.27.2026.pdf (read)
- Attachment 02 WD 1986-0473 06.05.2026.pdf (read)
Full summary
What they want
- Modernize the tower elevator (gear traction) and the base building elevator (hydraulic) to the latest ASME A17.1 elevator safety code
- Replace controllers, hoistway switches, drive machines, governors, car parts, cabs, door panels, signals and fixtures, and paint the machine room and pit floors
- Connect the new elevators to the existing fire life safety system and fire alarm panel, with all programming and testing
- Put one technician on site for 5 business days of elevator monitoring after the work is finished and before final acceptance
- One year of full-service maintenance after modernization: 24-hour, 7-day service calls with a response time of one hour or less
- Quality control plan, submittals and a detailed phased schedule
- Annual inspections and tests required by ASME A17.1, with the contractor present
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing
- Period of performance
- Elevator upgrades (line item 00001), then one year of maintenance (line item 00002, an option line). The text says the maintenance period is set after the upgrades are complete; the upgrade completion time is set in a clause that was not read.
- Place of performance
- Air Traffic Control Tower, Salt Lake City Airport, 1201 N. 4000 W., Salt Lake City, UT 84116
- Estimated value
- Estimated magnitude of construction: between $1,000,000.00 and $5,000,000.00 (agency's range in the notice)
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest priced offer that rates Acceptable on every factor wins
- Offers due
- December 18, 2026, 5:00 PM Mountain (7:00 PM Eastern)
- How to submit
- Email to Linda.Hennequant@faa.gov with the SIR number 697DCK-27-R-00021 in the subject line; Word or PDF files, not zipped; the FAA email limit is 10MB per message, so split large offers into several emails
What they'll judge offers on
- Relevant Experience: at least three projects of the same or similar scope, underway or finished within the last five years, as prime or subcontractor
- Ability to Perform Work: technical narrative showing approach, understanding, labor, materials and equipment
- Proposed Schedule: detailed schedule showing phased work
- Past Performance: record of timely work, quality, financial stability and customer satisfaction, checked with references
- Price: checked for reasonableness against the Government's estimate, competition and market conditions
What to include when you submit
- Business proposal: the Solicitation, Offer and Award form (blocks 13 to 17) and any signed amendments
- Business proposal: Section B pricing schedule, Section K representations and certifications, and the Past Performance / Experience Information form
- Technical proposal: list at least three and no more than five relevant projects underway or completed within the last five years; subcontract work may be cited if you have no prime work
- For each project give the project description, agency or owner, point of contact, phone, email and date of completion
- Technical proposal: a technical narrative on your approach, understanding and ability to provide all labor, materials and equipment
- Technical proposal: a detailed proposed schedule that shows the phased work
- Quality control plan (QCP) following ASME A17.1, sent with the proposal
- A statement of the extent of your agreement with the FAA's terms and conditions
- Optional site visit: send date and time, company name and each attendee's name, email and telephone to Jordan Wyman, jordan.t.wyman@faa.gov, (206) 304-3683
- Send written questions to Linda.Hennequant@faa.gov with the SIR number in the subject line; telephone questions are not accepted
After award, you must have
- FAA badging for contractor staff before work starts From Attachment 01 PWS Elevator Refurbishment SLC UT.pdf:
Contractors will need to obtain FAA badging prior to the start of work.
- Insurance and bonding documents accepted before the notice to proceed From SIR 697DCK-27-R-00021.pdf:
Officer will ensure all Critical Submittals are delivered to and approved by the FAA, that all required insurance and…
Not in the notice text
- The middle of the solicitation (181,526 characters of contract clauses, the attachment list and the representations and certifications) was attached but not read, so completion time, bonding and insurance amounts may be missing
- How many days the elevator upgrades must take: the clause that sets it was not read
- The exact deadline for questions: sources give it relative to the response due date, in two different ways
- Time zone of the site visits
- The amount and type of insurance and bonds required
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Solicitation
- Office
- 697DCK Regional Acquisitions SVCS, Fort Worth, TX
- Product/service code
- Z2BA · Repair or Alteration of Air Traffic Control Towers
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238290)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- White City VA Medical Center Elevator Maintenance ServicesSolicitation 36C26027Q0121: the Department of Veterans Affairs (Network Contract Office 20) wants a contractor to maintain and repair the elevators at the White City VA Medical…
- Replace Elevators at FDC MiamiThe Federal Bureau of Prisons plans a firm-fixed-price construction contract to replace four traction and six hydraulic elevators at the Federal Detention Center in Miami, FL. It…
- FILA Elevator and vertical lift inspection serviceOnly small businesses can bid on this National Park Service request for quote (RFQ) for monthly inspection, testing and preventive maintenance of two elevators and one platform…
- Elevator Maintenance & Repair Services MDC Brooklyn, New YorkThe Federal Bureau of Prisons wants one small business to maintain and repair 17 elevators at MDC Brooklyn (11 elevators) and Dayton Manor staff housing (6 elevators) in…
- Santa Rosa Dam Elevator Maintenance Service, Guadalupe County, New Mexico