Summary of the version posted Nov 10, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Parts of the project specifications (Attachment 2) and the wage determinations (Attachment 4) were attached but only partly read, and the wage determination text couldn't be read; check both on SAM.gov for the wage rates. Check the attachments on SAM.gov.
The Forest Service (Chugach National Forest, Seward Ranger District) wants a contractor to rebuild Robinette Road near Hope, Alaska, under solicitation 1240BJ27Q0009. It is a total small business set-aside with one award, a firm-fixed-price (FFP: one set price, whatever the work ends up costing) contract. The response due date for emailed quotes is December 4, 2026, 5:00 PM Pacific. Award is based on price alone.
Who can bid
- Be a small business: the SAM.gov set-aside is Small Business Set Aside - Total, and the Limitations on Subcontracting clause applies (limits how much of the work you can pass to others) From 1240BJ27Q0009.pdf
- Performance and payment bonds for the construction work: the bond clause is checked; the form's bond boxes couldn't be read, so confirm the amount with the contracting officer From 1240BJ27Q0009.pdf
- Pay construction wage rates under the Construction Wage Rate Requirements clause (the Davis-Bacon rules); a wage determination is attached From 1240BJ27Q0009.pdf
How to submit: Email to Traci Jackson at Traci.jackson@usda.gov, as a Word document, Excel spreadsheet or PDF. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
- Serious: Total small business set-aside. Only small businesses can send quotes, and the subcontracting limits clause applies, so you must do a set share of the work yourself. From 1240BJ27Q0009.pdf
- Serious: Bonds may be required. The performance and payment bond clause is checked, but the form's bond boxes couldn't be read. Getting bonds takes time and credit with a surety. From 1240BJ27Q0009.pdf
- Serious: Price every item or be rejected. There is one award, and a quote missing any line item, including the option items, is not responsive. From 1240BJ27Q0009.pdf
Show all 7Show fewer
- Worth checking: Questions were due Nov 20, 2026. Check the amendments for the agency's answers. From 1240BJ27Q0009.pdf
- Worth checking: Site visit by arrangement only. No visit date is set. Contact the project engineer to arrange one during duty hours; the text does not call it required. From 1240BJ27Q0009.pdf
- Worth checking: Remote Alaska site and work limits. The project is about 88 miles from Anchorage by road. Work is limited to Monday through Friday, 7:00 a.m. to 6:00 p.m., and none on federal holidays unless approved in writing. From 1240BJ27Q0009.pdf
- Minor: Finish dates differ slightly. The continuation sheet estimates work from 12/18/2026 to 10/29/2027, while Section F requires completion by 10/31/2027. The form also shows 10 and 310 calendar days beside a 14-day start in Section F. From 1240BJ27Q0009.pdf
Read from the notice and 5 attachments. Show which files.
- 1240BJ27Q0009.pdf (read)
- Attachment 2 Project Specifications CC FSSS.pdf (read)
- Attachment 1 Project Specifications List.pdf (read)
- Attachment 3 Project Drawings CC Plans Full Set.pdf (read)
- Attachment 4 Wage Determinations.pdf (read)
Full summary
What they want
- Clear and grub (cut brush and remove stumps) 1.54 miles of Robinette Road, with disposal by scatter and deck
- Roadway excavation, 300 cubic yards, and drainage excavation (armored dip), 96 cubic yards
- Linear grading with compaction, 1.54 miles, plus subbase (100 cubic yards) and pitrun gravel (550 cubic yards)
- Seeding and mulching, temporary traffic control and mobilization, each as a lump sum
- Also in the scope: unsuitable material excavation and endhaul, switchback realignment, waterbar construction, disposal site contouring
- Option items for Robinette Spur Road: linear grading, 0.31 mile, and subbase, 5300 cubic yards (road surfacing)
- Submit a traffic control plan, erosion control plan, spill prevention and control plan and construction schedule for approval; aggregate submittals too
- Contract type
- Firm-fixed-price purchase order (contract), one award, unit-priced schedule of items
- Period of performance
- Estimated 12/18/2026 to 10/29/2027 on the continuation sheet; work must be complete by 10/31/2027, starting within 14 calendar days after notice to proceed
- Place of performance
- Chugach National Forest, Seward Ranger District, Hope, AK (Section B); SAM.gov lists Anchorage, AK
- Estimated value
- Not stated
- How they'll choose
- Price only: award goes to the responsible quoter with a reasonable price, expected without discussions
- Offers due
- December 4, 2026, 5:00 PM Pacific (from the version posted Nov 10, 2026; amended since)
- How to submit
- Email to Traci Jackson at Traci.jackson@usda.gov, as a Word document, Excel spreadsheet or PDF
What they'll judge offers on
- Price
What to include when you submit
- Include the solicitation number, company name, Unique Entity Identifier (UEI), address, email and telephone number
- Acknowledge each solicitation amendment posted on SAM.gov, giving its number and date
- Give unit pricing and extended totals for every line item on the schedule, including the option items
- Price all items: the Government intends one award, and quotes missing any item are not responsive
- Hold prices firm for 90 calendar days from the date quotes are due
- Put bond premium costs inside the mobilization line (pay item 15101), as Section B says
After award, you must have
- Provide a written job-specific hazard analysis and safety plan for hazards such as tree falling, deep trenching and heavy equipment From 1240BJ27Q0009.pdf:
Tree falling…
Not in the notice text
- Parts of the project specifications (Attachment 2) and the wage determinations (Attachment 4) were attached but only partly read, and the wage determination text couldn't be read; check both on SAM.gov for the wage rates.
- The Davis-Bacon wage rates for this job are in Attachment 4, which couldn't be read here; check the determination on SAM.gov.
- Whether performance and payment bonds are required, and for what amount: the form's bond boxes couldn't be read.
- Whether an offer guarantee (bid bond) is needed: the form's boxes couldn't be read.
- No dollar estimate for the contract is given.
- The date and arrangements for any site visit; none is scheduled in the documents.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA-FS, CSA Northwest 7, Portland, OR
- Product/service code
- Z2LB · Repair or Alteration of Highways/Roads/Streets/Bridges/Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
2 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0001Due Dec 4, 2026
- Nov 10, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 4, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- AK NPS DENA 10(64), Re-pave Riley Creek CG RoadsThe Federal Highway Administration's Western Federal Lands Division wants a contractor to re-pave the Riley Creek Campground roads in Denali National Park and Reserve, Alaska…
- P1555U Wallace Creek Service RoadOnly the three Civil/Paving multiple-award construction contract (MACC) holders named in the solicitation can bid: Quadrant Construction, Civil Works Contracting and Riza…
- Access Road Repair National Elk RefugeThe U.S. Fish and Wildlife Service (Department of the Interior) wants a small business to resurface the deteriorating asphalt access road to the administration building at the…
- USFS, Dakota Prairie Grasslands, Little Missouri NG Road MaintenanceTotal small business set-aside: the Forest Service (for the Dakota Prairie Grasslands) wants one firm to do annual road, trailhead and campground road maintenance in the Little…
- ND OMAD 2025(1) Minuteman Missile Access RoadSealed-bid construction job (solicitation 6982AF27B000011) set aside for small businesses only.