Solicitation
Request for Whitepaper-Arc Heater Component Manufacturing and Supply
Department of Defense · Department of the Air Force
AI summary Beta
The notice looks incomplete: The Statement of Objectives, the Technical Data Package drawings and the FY26-FY30 parts projection (Atch 1 to 3) are not provided; they are Distribution D export-controlled and released only to vetted vendors. Check the attachments on SAM.gov.
The Air Force's Arnold Engineering Development Complex (AEDC) at Arnold AFB, Tennessee wants a long-term source to make and/or refurbish specialized parts for its Arc Heater test facilities. The deal would be a 10-year Other Transaction agreement (a flexible, non-FAR deal type) where the Government places part orders over time. Companies first send a 10-page whitepaper, and only vendors who pass a security vetting step can even see the drawings and the Statement of Objectives.
Who can bid (7)
- Current and valid U.S./Canada Joint Certification Program (JCP) certification (DD Form 2345), validated through the Defense Logistics Agency; also required before you receive the controlled documents From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- CMMC Level 2 certification by a third-party assessor (C3PAO), or the alternative path: a current NIST SP 800-171 DoD Assessment (no older than three years) posted in SPRS plus a roadmap to full certification by 10 November 2026. A self-assessment does not count. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- After 10 November 2026 the alternative path ends: a current CMMC Level 2 C3PAO certification is required for the rest of the agreement, with an annual compliance affirmation in SPRS From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
Show all 7Show fewer
- Meet at least one 10 U.S.C. 4022(d) test: a nontraditional defense contractor or nonprofit research institution participates significantly, all significant participants are small businesses or nontraditional contractors, or at least one third of project cost comes from non-Government sources From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Active SAM.gov registration kept current through final payment From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
- Able to handle Controlled Unclassified Information (CUI) marked Distribution D (DoD and DoD contractors only) under U.S. export control laws
- End products must be made in the United States or a listed qualifying country, unless the Agreements Officer grants a waiver
How to submit: Email to the Agreements Officer, Greggory C. Jones, at greggory.jones.4@us.af.mil, due Neodora, LLC (named as the only known capable source): 21 May 2026, Close of Business. Any other vendor: may submit at any time while the request stays open. SAM.gov response date: Apr 20, 2031, 5:00 PM CDT · 6:00 PM Eastern.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Apr 21, 2026.
- Serious: Technical documents are locked behind vetting. The Statement of Objectives, drawings and parts projection are not public; you must first pass JCP and CMMC/SPRS checks or you cannot take part further, and they were not available to this brief. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Serious: Date passed (Nov 10, 2026): CMMC Level 2 third-party certification is required by 10 November 2026. A small shop without a C3PAO certification must show a credible roadmap, and missing the date can be a material breach and grounds for termination for default. From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
- Serious: Multi-step process; a proof of concept may be required. Step 1 is the whitepaper (business process prototype); a new vendor the Government finds credible may then be asked to make and deliver a representative component that must conform exactly to the drawings before it can compete for production orders. From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
Show all 10Show fewer
- Serious: Another vendor is the only named capable source. The Government says one company already meets all the requirements; others may submit but the Government decides whether to validate and onboard them. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Worth checking: No guaranteed orders. The ten-year agreement is only a framework; each order needs a signed modification, and work must not start before then. From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
- Worth checking: Five-year fixed prices for all listed parts. You must commit firm-fixed prices for the first five years in the whitepaper, before years 6 through 10 are negotiated, and the Agreements Officer must find them fair and reasonable. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Worth checking: Supporting documents needed or you may be dropped. The statutory eligibility explanation needs documentation, and missing documents can remove a company from consideration. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Worth checking: Risk and cost on the vendor side. The vendor bears risk of loss and delivery costs until acceptance, gives a one-year warranty on each article, and payment is firm-fixed-price only after Government acceptance; this is a rated order (DPAS). From Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf
- Worth checking: Unmarked data is treated as unlimited rights. The Government gets at least Government Purpose Rights in everything first produced under the agreement, and technical data you fail to mark is given away with unlimited rights. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
- Minor: Document inconsistency on number of whitepaper parts. The instructions say the whitepaper addresses three parts but then list four (business process, IP, 4022(d) authority, cybersecurity), so plan to cover all four. From Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf
Read from the notice and 2 attachments. Show which files.
- Atch 4 - Arc Heater Component Manufacturing and Supply-Articles.pdf (read)
- Request for Whitepaper-Arc Heater Component Manufacturing and Supply.pdf (read)
Full summary
What they want
- Manufacture and/or refurbish critical Arc Heater components to the Government-owned Technical Data Package (drawings and specifications)
- Describe an end-to-end manufacturing and quality process in the whitepaper
- Firm-fixed prices for all listed parts for years 1 through 5; years 6 through 10 to be negotiated before the end of year 5
- Explain intellectual property (IP) assertions, how the company meets the 10 U.S.C. 4022(d) eligibility test, and a cybersecurity compliance plan
- Deliver parts to Arnold AFB, TN and keep the supply chain and quality system reliable for ten years
- Possibly build a proof-of-concept component first if you are a new vendor
- Contract type
- Other Transaction (OT) agreement for prototype projects under 10 U.S.C. 4022; firm-fixed-price payment for components ordered by bilateral modification. Not subject to the FAR.
- Period of performance
- Ten one-year milestones (Year 1 through Year 10). Orders are added as sub-milestones by modification; the Government is not obligated to place any orders.
- Place of performance
- Arnold AFB, TN, USA
- Estimated value
- Not stated
- How they'll choose
- The Government reviews each whitepaper to confirm it is suitable for setting up the long-term agreement. No price-versus-quality scoring is described; first-5-year prices must be found fair and reasonable by the Agreements Officer before award.
- Offers due
- Neodora, LLC (named as the only known capable source): 21 May 2026, Close of Business. Any other vendor: may submit at any time while the request stays open. SAM.gov response date: Apr 20, 2031, 5:00 PM CDT · 6:00 PM Eastern.
- How to submit
- Email to the Agreements Officer, Greggory C. Jones, at greggory.jones.4@us.af.mil
- Page limits
- Whitepaper: 10 pages maximum
What they'll judge offers on
- Clarity and Suitability of the Proposed Business Process Prototype: clear and comprehensive manufacturing/quality processes and 5-year pricing structure
- Acceptance of IP Terms: acknowledging the IP framework and justifying any asserted restrictions
- Compliance with 10 U.S.C. 4022(d): clear explanation with supporting documentation of how you meet the statutory participation requirement
- Cybersecurity Compliance Approach: Joint Certification Program (JCP) status and either current CMMC Level 2 C3PAO certification or the alternative path (SPRS NIST SP 800-171 assessment plus a credible CMMC roadmap)
What to include when you submit
- Part 1 Business Process Prototype: manufacturing and quality process plus firm-fixed pricing for all parts in the Statement of Objectives for years 1-5
- Part 2 Intellectual Property: acknowledge the Background/Foreground IP framework and attach a document listing any assertions of restrictions on technical data, with rationale
- Part 3 10 U.S.C. 4022(d): choose one option (nontraditional defense contractor participation, small business participation, or one-third cost sharing) and attach supporting documentation
- Part 4 Cybersecurity Compliance Plan: state your current JCP certification and address CMMC Criterion 2 (C3PAO certification, or SPRS assessment plus a roadmap to certification by 10 November 2026)
- To get the controlled documents first, the Government must verify your JCP certification (DD Form 2345 status) and your CMMC or SPRS status
- Mark any technical data given with less than unlimited rights; unmarked data is treated as unlimited rights
Current contractor
Neodora, LLC is named as the only known and proven vendor with the capabilities for this requirement; the text does not call it the incumbent or give a contract number.
Not in the notice text
- The Statement of Objectives, the Technical Data Package drawings and the FY26-FY30 parts projection (Atch 1 to 3) are not provided; they are Distribution D export-controlled and released only to vetted vendors
- Part names, quantities, order sizes and total agreement value (the agreement articles show a blank placeholder for total estimated value)
- How the Government will pick which vendor gets each order once several vendors are on the agreement
- What the possible technical and manufacturing audit of additional vendors involves
- Invoice type, payment office and other agreement-specific attachments referenced in the articles
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval; CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Apr 21, 2026
- Notice type
- Solicitation
- Office
- FA9101 Aedc PKP Procrmnt BR, Arnold AFB, TN
- Product/service code
- 5340 · Hardware, Commercial
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 332710)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- TAHEF 542 System ComponentsNaval Undersea Warfare Center Division, Newport (NUWC Division Newport) wants 52 build-to-print machined and welded metal parts (TAHEF 542 system components), under solicitation…
- CAAA Rapid Acquisition Sustainment Program (RASP) BOAThis is Step One of three for solicitation W519TC-26-R-RASP: a one-time qualification round, due December 7, 2026, 1:00 PM Central, to join a pool of suppliers; only firms that…
- Circuit Card AssembSolicitation SPRPA127QYA26 from the Defense Logistics Agency (DLA) Aviation at Philadelphia, PA is for the item titled "CIRCUIT CARD ASSEMB". Only government-approved sources of…
- Torque Adapter AsseThe Navy's NAVSUP Weapon Systems Support has posted a solicitation for an item titled TORQUE ADAPTER ASSE. The text has almost no description of the item, quantity or work, only…
- O2 Carts Trailer FrameRequest for quote N6134026Q1029 from the Navy's Naval Air Warfare Center Training Systems Division (NAWCTSD) for three custom oxygen servicing carts with trailer frames, built by…