Solicitation
Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025
Department of Defense · Department of the Army
AI summary Beta
The notice looks incomplete: The bid opening date and time (to be set by a future amendment). Check the attachments on SAM.gov.
The Army Corps of Engineers New Orleans District wants a contractor to supply one fully crewed hydraulic pipeline cutterhead dredge to dredge the New Orleans Harbor reach of the Mississippi River and the lock forebays of the Algiers, Harvey and Inner Harbor Navigation Canal locks (Orleans and Jefferson Parishes, Louisiana). It is a sealed-bid (IFB) construction contract with no set-aside, estimated between $5 million and $10 million, and the lowest-priced responsive bid from a responsible bidder wins. The bid opening date has not been set yet.
Who can bid (8)
- Active SAM registration, and the Section 00600 representations and certifications completed with the bid (or your full SAM online representations and certifications) From W912P825BA010 Solicitation.pdf
- Dredge that meets the equipment rules in the Hydraulic Dredging section, shown on the completed data sheet, and passes a pre-award survey From W912P825BA010 Solicitation.pdf
- Proof the proposed dredge performed at or above the listed production rate for at least 30 days on one contract within 3 years before bid opening From W912P825BA010 Solicitation.pdf
Show all 8Show fewer
- Dredge able to work in high river stages (above 12 feet at the New Orleans Carrollton gage) From W912P825BA010 Solicitation.pdf
- Current DQM (National Dredging Quality Management Program) certification for the dredge's instrumentation system From W912P825BA010 Solicitation.pdf
- Performance and payment bonds after award, due within the number of days set in block 12B of SF 1442 (not shown in the text provided) From W912P825BA010 Solicitation.pdf
- Show the capital, experience and equipment to do the work, and show the dredge is not committed to other work that would delay this job From W912P825BA010 Solicitation.pdf
- NIST SP 800-171 DoD assessment notice (DFARS 252.204-7019) is part of the solicitation; if you must implement NIST SP 800-171, expect to need a current assessment score in SPRS From W912P825BA010 Solicitation.pdf
How to submit: Sealed bid (IFB) to the U.S. Army Corps of Engineers, New Orleans District, 7400 Leake Avenue, New Orleans. Delivery details and the opening date were not in the text provided and will come by amendment. Questions go to the contract specialists named in the notice.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Apr 22, 2025.
- Serious: Requires owning a qualifying cutterhead dredge. You must supply a crewed hydraulic cutterhead dredge in one of 5 size classes, so this suits only dredging companies (or teams with one) and is a poor fit for most small businesses.
- Serious: Strict responsibility test for the low bidder. A dredge that does not meet the equipment rules, or lacks a 30-day record at the required production rate within 3 years, gets the low bidder declared non-responsible and the next bidder is tested. From W912P825BA010 Solicitation.pdf
- Worth checking: Bond requirements and amounts unclear. The packet includes a bid bond form and says performance and payment bonds are due after award, but the bid guarantee amount and the bond deadline are not in the text provided, and bonding can be hard for a small business to get. From W912P825BA010 Solicitation.pdf
Show all 11Show fewer
- Worth checking: Bid opening date not set. The documents say the bid opening will come by amendment, but SAM.gov lists a 2027 response date, so check for amendments before planning around any date. From W912P825BA010 Solicitation.pdf
- Worth checking: Must bid every item, including options. Leaving out any item makes your bid non-responsive, and the Government does not have to use the option items, so option pricing is a risk. Prices that are materially unbalanced can also be rejected. From W912P825BA010 Solicitation.pdf
- Worth checking: Fast start after Notice to Proceed. The dredge must be on site and dredging within 120 hours of the Notice to Proceed, so it cannot be tied up on other work. From W912P825BA010 Solicitation.pdf
- Worth checking: Payment withheld if monitoring data is late. Failing to send the required DQM dredge data on time can mean up to 10% of a progress payment is held back. From W912P825BA010 Solicitation.pdf
- Worth checking: Davis-Bacon wages likely apply (a general rule). This is the general rule, not something the notice says: federal construction over $2,000 in the U.S. pays at least the Davis-Bacon wage rates in the wage determination attached to the solicitation. This summary doesn't name one: find it on SAM.gov and price your labor from it.
- Minor: Rock and bank-stability limits in the IHNC lock forebay. Rock from a 2009 bank slide may still be in the channel and box cutting is banned near the west bank, which raises the risk of dredge damage and work restrictions. From W912P825BA010 Solicitation.pdf
- Minor: Large part of the solicitation was not provided. About 315,000 characters from the middle of the solicitation (including the main Hydraulic Dredging section and the New Orleans Harbor region section) were not available, so some requirements may be missing from this brief.
- Minor: Solicitation numbers do not match. The bid schedule refers to solicitation W912P825B0031 and the cover to OM25031, while SAM.gov lists W912P825BA010, so confirm you are bidding on the right package. From W912P825BA010 Solicitation.pdf
Read from the notice and 1 attachment. Show which files.
- W912P825BA010 Solicitation.pdf (read)
Full summary
What they want
- Supply one fully crewed and equipped hydraulic pipeline cutterhead dredge and attendant plant
- Pick one of 5 bid lots that matches your dredge's discharge size (24, 27 or 30+ inch) and whether it has a submerged pump
- Dredge for a set number of paid hours (343 to 860 depending on the lot), plus an equal block of option dredging hours the Government may or may not use
- Mobilize and demobilize the dredge (lump sum "job") and provide dredge towing service (30 miles)
- Provide floating discharge pipeline (about 3,000 feet in the lock forebays) to place material beyond the -55 foot contour in the river
- Provide a landing barge for personnel access at the work site
- Start dredging within 120 hours after Notice to Proceed and keep to the required minimum production rate
- Run a certified National Dredging Quality Management (DQM) monitoring system and send required dredge data
- Contract type
- Firm-fixed-price, sealed bid (IFB), construction; award as a whole to one bidder
- Period of performance
- Base dredging item runs about 56, 40, 53, 41 or 31 calendar days for lots 1 to 5. If Option Item 0003 is fully used, the same number of days is added. Dredge must start within 120 hours of Notice to Proceed.
- Place of performance
- New Orleans Harbor reach of the Mississippi River and the adjacent lock forebays of the Gulf Intracoastal Waterway (Algiers, Harvey and IHNC locks), Orleans and Jefferson Parishes, Louisiana
- Estimated value
- Between $5,000,000 and $10,000,000 (magnitude of construction stated in the notice)
- How they'll choose
- Lowest price: award goes to the responsible bidder with the lowest-priced responsive bid, whichever bid lot is used. The low bidder must also pass a pre-award survey of its dredge against special responsibility standards.
- Offers due
- Not set yet. The bid opening date will be set by a future amendment. SAM.gov currently lists Apr 21, 2027 11:00 AM (UTC-05:00).
- How to submit
- Sealed bid (IFB) to the U.S. Army Corps of Engineers, New Orleans District, 7400 Leake Avenue, New Orleans. Delivery details and the opening date were not in the text provided and will come by amendment. Questions go to the contract specialists named in the notice.
What they'll judge offers on
- Lowest total price (base plus option items) among responsive bids
- Responsibility: completed dredge data sheet showing the dredge meets the equipment requirements
- Responsibility: proof the dredge hit the required production rate for 30 days on one contract in the last 3 years
- Pre-award inspection of the dredge and attendant plant
What to include when you submit
- Complete the bid schedule with unit prices for every item, including option items
- Bid on only one lot, matching your dredge class; a bid on the wrong lot is non-responsive
- Include a completed Cutterhead Dredge and Attendant Plant Data Sheet in the bid package (the apparent low bidder gets 24 hours after bid opening if it was left out, or is declared non-responsible)
- Use a bid bond form (SF 24) if a bid guarantee is required; the amount is not in the text provided
- Complete the Section 00600 representations and certifications, or submit your full SAM online representations and certifications
- Certify by bidding that your dredge can operate in river stages above 12 feet at the New Orleans (Carrollton) gage
Current contractor
No named incumbent. The solicitation says dredging happens every year or nearly every year in parts of the forebay region and that previous contract information is available from the contract specialist.
Not in the notice text
- The bid opening date and time (to be set by a future amendment)
- Whether a bid guarantee is required and how much (the amount is not in the text provided)
- How many days after award performance and payment bonds are due
- Equipment rules in the Size and Equipment of Dredge Plant paragraph and the minimum production rates for the New Orleans Harbor region (these were in the omitted middle of the PDF; only the forebay region chart was provided)
- Main Hydraulic Dredging section details: payment rules, non-standard conditions, required production and tolerances, and discharge pipeline specs
- Safety (EM 385-1-1), Resident Management System and environmental requirements
- Whether there's a site visit: this summary doesn't say. Check the solicitation and its amendments on SAM.gov.
Notice details
Notice type, codes, versions and files
- Posted
- Apr 22, 2025
- Notice type
- Solicitation
- Office
- W07V ENDIST New Orleans, LA
- Product/service code
- Y1KF · Construction of Dredging Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 2-2025 (OM25276)The Army Corps of Engineers New Orleans District plans to solicit a fully crewed cutterhead dredge to do maintenance dredging in the Mississippi River Southwest Pass.
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)The U.S. Army Corps of Engineers New Orleans District wants one fully crewed cutterhead dredge for maintenance dredging of the Mississippi River Southwest Pass in Plaquemines…
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)The Army Corps of Engineers New Orleans District wants one fully crewed cutterhead dredge (30 inch or larger discharge) to maintenance-dredge the Mississippi River at Southwest…
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)The U.S. Army Corps of Engineers New Orleans District wants a contractor to supply one fully crewed cutterhead dredge for maintenance dredging of the Mississippi River Southwest…
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 2-2025 (OM25002)The Army Corps of Engineers New Orleans District plans to buy one fully crewed, self-propelled trailing suction hopper dredge to work in the Mississippi River Southwest Pass and…