Presolicitation
Elec Hull Fitting
Department of Defense · Department of the Navy
Response due Dec 11, 2026 · Small business set-aside · Place not listed
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Navy's list before the solicitation is posted. See the contact
A newer version of this notice was posted Nov 20, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. SAM.gov's data cuts this notice's text off, and this summary didn't read the attachments, so it may miss requirements. Check the attachments on SAM.gov.
The Navy's NAVSUP Weapon Systems Support (the Navy supply office in Mechanicsburg) wants an electrical hull fitting assembly, part number 3786/1-100, built to NAVSEA drawing 401-6658973. First article testing is required before production. The response due date is December 11, 2026, 4:30 PM UTC-4; the text shown is cut off.
Who can bid
- Quality system that follows ISO 9001 (the international quality management standard) with calibration to ISO 10012 or ANSI Z540.3 with ISO 17025; a MIL-I-45208 system is an accepted alternate
- First article approval: the Government tests sample units and the contractor does its own first article test before production is approved
- If welding or brazing is needed, personnel and procedures must be qualified to the listed Navy standards, and procedures and qualification data approved before any welding
Things to watch (9)
From the version posted Nov 20, 2026.
- Serious: Quantity and unit of issue unclear. The time-of-delivery table lists lines 0001AA with 1, 0001AB with 1 lot and 0001AC with 2, with no clear unit; a quote is priced per unit, so confirm in the solicitation documents.
- Serious: First article test required. Sample units must pass Government testing before production, which adds time and cost; the test samples do not count toward the contract quantity.
- Worth checking: Delivery time differs between places. The time-of-delivery table shows 600 beside line 0001AA, while a note says final delivery is due 550 days after the effective date; ask the contracting officer which governs.
Show all 9Show fewer
- Worth checking: Named laboratories for a material test. The slow strain rate tensile test of the nickel-copper material must be done by one of a short list of laboratories, one of them in Germany.
- Worth checking: Drawings need an access request. Drawings are not in the text; you must ask for access on the solicitation page on SAM.gov.
- Worth checking: Emergency acquisition rules and no Government financing. The buy runs under emergency acquisition flexibilities, so no financing help is available and the award is bilateral.
- Worth checking: Quality procedures due to the contracting officer before award. Suppliers of Level I/SUBSAFE material must send their written quality procedures before award unless the Navy waives it.
- Minor: Earlier closing dates appear in the text. Amendment notes in the text mention earlier closing dates; SAM.gov's response due date is December 11, 2026, so use that and ask the contracting officer if unsure.
- Minor: Priority-rated order. An award would be a rated order under the Defense Priorities and Allocations System (DPAS), which means the Government expects it to be filled ahead of other work.
Read from the notice text only.
Full summary
What they want
- Build the electrical hull fitting assembly, part number 3786/1-100, to NAVSEA drawing 401-6658973
- Pass Government first article testing (the Navy tests early samples first) and do your own non-destructive first article test
- Use certified nickel-copper (K-monel) and other listed materials, with chemical and mechanical analysis
- Do dye penetrant, ultrasonic and other listed tests and send test certifications
- Run an ISO 9001 quality system and allow Government inspection at source
- Send certification data lists (CDRLs, contract data requirements lists) before delivery
- Contract type
- Fixed-price supply order (the clause list includes the fixed-price inspection of supplies clause); the award will be bilateral, needing the contractor's written acceptance
- Period of performance
- Final delivery on or before 550 days after the effective date of the contract
- Estimated value
- Not stated
- Offers due
- December 11, 2026, 4:30 PM UTC-4
What to include when you submit
- Vendors submitting quality manuals send them to jill.sabol@navy.mil
- Send a copy of your current documented quality system procedures to the Procurement Contracting Officer (PCO) before award; you may ask the PCO to waive this if the procedures are already on file
- Request access to any drawings on the solicitation's own page on SAM.gov
Not in the notice text
- The notice text is cut off. The clear quantity and unit, evaluation method, how to submit a quote and the full terms are not in the text shown; check the solicitation on SAM.gov and its attachments
- Drawing 401-6658973 and the other referenced documents are not in the text; drawings need an access request on SAM.gov
- SAM.gov shows no set-aside; an amendment note in the text says the small business set-aside was dissolved
- Place of performance is not stated; delivery is FOB destination (the buyer takes over at the delivery point)
More to check before you bid
- The notice names requirements:
- The notice mentions an approved or qualified source list. Only listed sources may be eligible, so check that your company or product is on it.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Presolicitation
- Office
- NAVSUP Weapon Systems Support Mech, Mechanicsburg, PA
- Product/service code
- 5935 · Connectors, Electrical
- Business type
- Electronic parts & equipment (supplies) (FedReady's grouping, from product/service code 5935)
- Versions
13 versions have been posted, newest first.
- Nov 20, 2026 · SolicitationDue Dec 11, 2026
- Nov 20, 2026 · Presolicitation (this version)Date Dec 11, 2026
- Nov 20, 2026 · Amendment 0001Due Dec 11, 2026 (changed)
- Aug 31, 2024 · SolicitationDue Sep 6, 2024
- Aug 28, 2024 · PresolicitationDate Sep 6, 2024
- Aug 27, 2024 · Amendment 0002Due Sep 6, 2024 (changed)
- Sep 25, 2023 · Amendment 0001Due Oct 11, 2023
- Sep 25, 2023 · SolicitationDue Oct 11, 2023
- Sep 25, 2023 · PresolicitationDate Oct 11, 2023 (changed)
- Jun 30, 2023 · Amendment 0001Due Jul 20, 2023 (changed)
- Jun 5, 2023 · SolicitationDue Jun 21, 2023 (changed)
- May 31, 2023 · PresolicitationDate Jun 19, 2023 (changed)
- May 31, 2023 · SolicitationDue Jun 21, 2023
- Attachments
Before you respond
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
- Limitations on subcontracting
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Hull PenetratorThe Navy's supply office in Mechanicsburg (NAVSUP Weapon Systems Support) wants Hull Penetrators made to Teledyne Drawing 1080495 and EB specification EB-4749.
- Connector, Thru-HullThe Navy's NAVSUP Weapon Systems Support (Mechanicsburg) wants 15 EA of a thru-hull connector (a Penetrator Assembly built to Naval Sea Systems Command Drawing 8212306) for a…
- Connector, Plug, ElecNavy NAVSUP Weapon Systems Support Mechanicsburg wants quotes under solicitation N0010427QBC51 for an electrical plug connector (CONNECTOR,PLUG,ELEC), Eaton Corporation part…
- Procurement of Manual Bus Transfer CablesThe Navy's Supervisor of Shipbuilding Groton wants quotes from small businesses to make 30 short power cables and supply 24 male receptacles, all with named brands (Leviton and…
- Connector Spares for the ICBM Minuteman III