Presolicitation
Aviation and Missile R&D BAA
Department of Defense · Department of the Army
Response date Jul 3, 2029 · VA
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Army's list before the solicitation is posted. See the contact
A newer version of this notice was posted Nov 10, 2026. It moves the due date from Jul 3, 2026 to Jul 3, 2029, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. The notice looks incomplete: The text read here is partial: the middle of the Master BAA and of every amendment was left out, so the one-step proposal instructions, Attachment 3 proposal format and later evaluation details were not read. Check them on SAM.gov. Check the attachments on SAM.gov.
Solicitation W911W625R0006 (now also numbered W911W626RA002) is an open broad agency announcement (BAA: a standing call for research ideas) from Army Contracting Command, Redstone, for the Army's aviation and missile research center. It runs in steps: a short concept paper first, and only papers rated "Of interest" get a request for a full proposal. Each funding opportunity under it has its own topics, budget and dates.
Who can bid (4)
- U.S. firms as prime contractors; foreign-owned entities may take part only as subcontractors or recipients under a U.S. prime From W911W6-25-R-0006 Master BAA.pdf
- Active System for Award Management (SAM) registration and a Unique Entity Identifier (UEI); failure to comply disqualifies a submission From W911W6-25-R-0006 Master BAA.pdf
- Principal investigator must be a U.S. Person, except for basic research From W911W6-25-R-0006 Master BAA.pdf
Show all 4Show fewer
- Commit to required cost sharing where an award type calls for it; not committing makes the submission ineligible From W911W6-25-R-0006 Master BAA.pdf
How to submit: Concept papers go through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at piee.eb.mil. Keep uploading under W911W625R0006 even though the number changed., due Jul 3, 2026, 3:00 PM EDT (the notice text says July 3, 2029, 2:30 PM Eastern). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 10, 2026.
- Serious: Multi-step process: concept paper first, proposal by invitation. This is a master announcement. Step One is a concept paper; only papers rated Of interest are asked for a full proposal in Step Two, so skipping Step One shuts a business out. From AMD 0004 Released.pdf
- Serious: Process changed to three steps in newer amendments. A later amendment adds a Collaboration Step to Attachment 2 for new funding opportunities, and CATO uses its own 3-step process with down-selects. The step details were not readable here; check them on SAM.gov. From AMD 0004_26RA002.pdf
- Serious: U.S. prime contractors only. Foreign-owned firms can take part only as subcontractors under a U.S. prime, and the prime stays responsible for export control compliance. From W911W6-25-R-0006 Master BAA.pdf
Show all 8Show fewer
- Worth checking: Funding is not assured. Budget figures are planning numbers only, and the Government does not pay for the cost of preparing a response. From W911W6-25-R-0006 Master BAA.pdf
- Worth checking: Cost sharing may be required. Some award types require you to commit your own funds, and a missing commitment makes a submission ineligible. From W911W6-25-R-0006 Master BAA.pdf
- Worth checking: Research security disclosures. All current and pending research support must be disclosed for each covered individual when you submit, and false or missing reporting can violate federal law. From W911W6-25-R-0006 Master BAA.pdf
- Worth checking: SPEED work involves controlled unclassified information. The SPEED topics are not fundamental research and need handling and generating controlled unclassified information (CUI), which calls for secure systems and procedures. From AMD 0002 Released.pdf
- Minor: Annual concept paper timing for SPEED. Concept papers sent before 1 October of each year are better positioned, as selection starts in the first quarter of each fiscal year. From AMD 0002 Released.pdf
Read from the notice and 10 attachments. Show which files.
- W911W6-25-R-0006 Master BAA.pdf (read)
- AMD 0004_26RA002.pdf (read)
- AMD 0003_26RA002.pdf (read)
- AMD 0002_26RA002.pdf (read)
- AMD 0001_26RA002 Attach 5-C CATO.pdf (read)
- AMD 0005 Released.pdf (read)
- AMD 0004 Released.pdf (read)
- AMD 0003 Released.pdf (read)
- AMD 0002 Released.pdf (read)
- W911W626RA002 w Attachments.pdf (read)
Full summary
What they want
- Research concept papers and proposals on aviation and missile technology topics, such as Design & Assessment, Launched Effects, Missile Seekers, Guidance, Navigation & Control, and Air Defense Sensors
- Autonomy Technologies for Complex Advanced Teaming Operations (CATO): software for autonomous mission planning, teaming and human-autonomy interface for uncrewed aircraft, including AI and machine learning approaches
- Supplemental Power, Efficient Engines, and Drives (SPEED): rotorcraft drive system topics (such as ceramic bearings and gearbox housings) and engine topics (compressor materials, aerodynamics, combustors, turbine materials and airfoils)
- Hybrid VTOL to Enable Operational Capability: a mainly analytical study of hybrid-electric vertical take-off and landing aircraft for Army missions
- Typical research tasks on CATO: requirements analysis, software drops to a third-party test site, update and retest, and reports, in six-month cycles
- Contract type
- Not fixed by the BAA: the award type depends on each funding opportunity (the text mentions procurement contracts and assistance awards)
- Period of performance
- The BAA is effective for five years beginning July 3, 2025. SPEED awards are anticipated at 12-24 months each; hybrid VTOL awards at 12-24 months, with the project schedule anticipated to conclude at the end of FY27.
- Place of performance
- VA, USA per SAM.gov; the issuing office is at Fort Eustis, Virginia. Where the research is done is not stated.
- Estimated value
- Varies by funding opportunity (Government budgets, not promises): CATO $29M total; SPEED $11,400K total over FY26 to FY30; hybrid VTOL $3,200K total (approximate planning numbers)
- How they'll choose
- Concept papers are rated Of interest, Of interest but currently not affordable, or Not of interest, against three review criteria of equal importance. Full proposals are requested only for papers rated Of interest.
- Offers due
- Jul 3, 2026, 3:00 PM EDT (the notice text says July 3, 2029, 2:30 PM Eastern)
- How to submit
- Concept papers go through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at piee.eb.mil. Keep uploading under W911W625R0006 even though the number changed.
- Page limits
- Concept paper: cover page 1 page; research project description 5 pages (extra pages are not read); ROM cost 1 page
What they'll judge offers on
- Technical merit of the concept, with emphasis on feasible, achievable and innovative solutions
- Transition path: the degree to which a defined path or strategy to a capability exists
- Schedule and affordability: how achievable the schedule is, judged against the rough order of magnitude (ROM) cost estimate
What to include when you submit
- Concept paper Section A, cover page only: BAA number, project title from the funding opportunity, company name, business size, Commercial and Government Entity (CAGE) code, Unique Entity Identifier (UEI), and contracting and technical points of contact
- Section B, research project description: nature and scope of the work, technical approach, major technical risks with ways to reduce them, and any proposed deliverables
- Section C: a rough order of magnitude (ROM) cost estimate, a quick broad cost estimate for when few details exist
- For SPEED topics, offerors are asked to send concept papers before 1 October of each year to be better positioned
- CATO summary offers can be sent at any time before the funding opportunity closes, 36 months after it was published in SAM.gov
- CATO video submissions: request a DoD SAFE drop-off from the Government contact, upload the video there, and also upload a one-page Word document with video details to the PIEE Solicitation module
- Include all current and pending research support for each covered individual with the proposal, and the signed Privacy Act Statement from each covered individual
Not in the notice text
- The text read here is partial: the middle of the Master BAA and of every amendment was left out, so the one-step proposal instructions, Attachment 3 proposal format and later evaluation details were not read. Check them on SAM.gov.
- The current Attachment 2 process after the Collaboration Step was added, and the updated SPEED budget and topic text from Amendment 0004, were not readable here
- Which response due date applies: July 3, 2029 on SAM.gov or July 3, 2027 in Amendment 0005
- Per-topic closing dates other than CATO's 36 months after publication are not stated
- Which award type (contract, other agreement or assistance award) each funding opportunity will use is not stated
Notice details
Notice type, codes, versions and files
- Posted
- Jul 19, 2025
- Notice type
- Presolicitation
- Office
- W6QK Aatd Contr Off, Fort Eustis, VA
- Product/service code
- AC12 · National Defense R&D Services; Department of Defense – Military; Applied Research
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Versions
11 versions have been posted, newest first.
- Nov 10, 2026 · AmendmentSAM.gov date Jul 3, 2029
- Nov 10, 2026 · AmendmentSAM.gov date Jul 3, 2029
- Jun 24, 2026 · AmendmentSAM.gov date Jul 3, 2029
- May 14, 2026 · AmendmentSAM.gov date Jul 3, 2029
- Apr 20, 2026 · AmendmentSAM.gov date Jul 3, 2029 (changed)
- Nov 5, 2025 · AmendmentDate Jul 3, 2027 (changed)
- Sep 24, 2025 · AmendmentDate Jul 3, 2026
- Sep 3, 2025 · AmendmentDate Jul 3, 2026
- Jul 29, 2025 · AmendmentDate Jul 3, 2026
- Jul 19, 2025 · Amendment 0005 (this version)Date Jul 3, 2026
- Jul 3, 2025 · PresolicitationDate Jul 3, 2026
- Attachments
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Aviation & Missile Technology Consortium (AMTC) Other Transaction Agreement (OTA) Request for Enhanced Whitepapers (RWP): AMTC-27-01
- Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)Solicitation FA240126R0003: the Space Development Agency (SDA), under the Department of the Air Force, wants one company to build ground entry points (GEPs), meaning ground sites…
- Missile Defense Agency - Nimble Options for Buying Layered Effects (NOBLE) AnnouncementMissile Defense Agency (MDA) umbrella announcement HQ0860-25-S-0001, Nimble Options for Buying Layered Effects (NOBLE), is not a bid opportunity itself: no white papers,…
- SYSTEM DELTA 84 (SYD 84/MT) MEDIUM EARTH ORBIT MISSILE WARNING / MISSILE TRACKING EPOCH 3 and EPOCH 4, REQUEST FOR INFORMATION (RFI)A sources sought request for information (RFI) from Space Systems Command (SSC), Space Force, on building the Medium Earth Orbit Missile Warning/Missile Tracking Epochs 3 and 4…
- NSWC-PHD MATAC OTA Special Notice: MK 341 ITS Advanced Missile Integration