Combined Synopsis/Solicitation
Level 1 Silver Brazing Rings
Department of Defense · Defense Logistics Agency
AI summary Beta
To be considered, both the manufacturer and the prime vendor must already hold an ISO 9001 certificate (an international quality system standard) and a quality assurance (QA) manual, and have completed a site visit. Defense Logistics Agency (DLA) Maritime - Portsmouth, for Portsmouth Naval Shipyard, wants 80 Each Level 1 silver brazing rings under solicitation SPMYM327Q5004, delivered to Kittery, Maine within 120 calendar days of award. The response due date is December 1, 2026, 12:00 PM Eastern, though the notice text says 12/01/2025.
Who can bid (5)
- ISO 9001 certificate and a QA manual dated within 3 years, held by both the manufacturer and the prime vendor if they are different
- Both the manufacturer and the prime vendor must have completed a site visit before award
- Quality system in line with ISO-9001, with calibration to ISO-10012 or ANSI-Z540.3 with ISO-17025 (MIL-I-45208 with MIL-STD-45662 is an accepted alternate) From Attachment 1 - TDP LLDAD8077-001.pdf
Show all 5Show fewer
- Current Cybersecurity Maturity Model Certification (CMMC) Level 1 (self-assessment) status, kept for the life of the contract From Solicitation - SPMYM327Q5004.pdf
- Material certifications that are positive and unqualified, with full traceability for Level I material From Attachment 1 - TDP LLDAD8077-001.pdf
How to submit: Email to robert.s.dowdle.civ@us.navy.mil and also to PNSYSupplyQuotations@us.navy.mil, due December 1, 2026, 12:00 PM Eastern (SAM.gov); the notice text says 12/01/2025 at 12:00 PM EST. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 10, 2026.
- Serious: Required ISO 9001 certificate, QA manual and completed site visit. A business that lacks the certificate and manual, or whose manufacturer has not had a site visit, can be shut out; the notice gives no date or way to arrange the visit.
- Serious: Level I Special Emphasis material. The rings go into a crucial shipboard system, so expect strict traceability, certified mill test reports and 100 percent checks of certification data. From Attachment 1 - TDP LLDAD8077-001.pdf
- Worth checking: Government supplies the silver. The refined silver comes as Government Furnished Material, which brings handling, inspection and reporting duties; the notice does not say how or when it is provided. From Attachment 1 - TDP LLDAD8077-001.pdf
Show all 10Show fewer
- Worth checking: Set-aside clause versus SAM.gov. SAM.gov says no set-aside was used, yet the clause list includes the notice of a total small business set-aside; ask the contracting officer which applies. From Solicitation - SPMYM327Q5004.pdf
- Worth checking: Inspection and acceptance place differs. One clause says inspection and acceptance are at source, while the technical data package and schedule point to acceptance at destination. From Solicitation - SPMYM327Q5004.pdf
- Worth checking: Certification data before each shipment. Certification data goes to the shipyard for review first, and material may not ship until the Government accepts it. From Exhibit A.pdf
- Worth checking: Acceptance not final for up to 180 days. The higher-level quality clause says acceptance is not final until later inspections finish or 180 days pass, and payment is Net 30 days after acceptance. From Solicitation - SPMYM327Q5004.pdf
- Worth checking: Forms and provisions to return with the offer. Offers must include four completed provisions, country of origin per line, and manufacturer details if you are a reseller.
- Minor: Delivery hours. The shipyard receives shipments only on weekdays during set hours unless arranged in advance. From Solicitation - SPMYM327Q5004.pdf
- Minor: Payment terms. Payment is Net 30 days after the Government accepts the material.
Read from the notice and 3 attachments. Show which files.
- Solicitation - SPMYM327Q5004.pdf (read)
- Attachment 1 - TDP LLDAD8077-001.pdf (read)
- Exhibit A.pdf (read)
Full summary
What they want
- CLIN 0001 (contract line item number, one priced line of the order): 80 Each Level 1 silver brazing rings, grade BCuP-5, National Stock Number (NSN) 3439-LL-DAD-8077, per Technical Data Package LLDAD8077 VER 001
- Rings to federal specification QQ-B-654, Class BCuP-5, pre-formed: O.D .619", width .063" +/- .003", thickness .035" +/- .003", gap .073" - .130"
- CLIN 0002 (1 Set): data under contract data requirements list (CDRL) Exhibit A: A001 inspection and test plan, A002 chemical and mechanical certification data, A003 special emphasis certificate of compliance
- Material must be traceable by heat or lot number to certified chemical and mechanical test reports, with a traceability label on each unit container
- Government Level 1 inspection at source by the Defense Contract Management Agency (DCMA) in Philadelphia, with delivery to Portsmouth Naval Shipyard, Building 170, Kittery, ME 03904-5000, free on board (F.o.b.) destination, meaning you deliver and pay shipping
- No mercury or mercury-containing compounds added to or touching the supplies
- Send certification data to the shipyard for review and acceptance before each shipment
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing)
- Period of performance
- Delivery within 120 Calendar Days from date of award; no options stated
- Place of performance
- Kittery, ME, USA
- Estimated value
- Not stated
- How they'll choose
- Low price technically acceptable (LPTA): quotes that meet the technical requirements are compared on price, and the firm is screened for responsibility under FAR 9.104
- Offers due
- December 1, 2026, 12:00 PM Eastern (SAM.gov); the notice text says 12/01/2025 at 12:00 PM EST
- How to submit
- Email to robert.s.dowdle.civ@us.navy.mil and also to PNSYSupplyQuotations@us.navy.mil
What they'll judge offers on
- Technical (pass or fail): quote must clearly show it meets the specifications and offer the exact items in Section B; exceptions may make it technically unacceptable
- Price: quotes that pass technical are evaluated on price
- Contractor responsibility screening under FAR 9.104
What to include when you submit
- Include price(s), F.o.b. point, CAGE Code (Commercial and Government Entity code), a point of contact with name and phone number, GSA contract number if applicable, and business size under the NAICS code
- State whether you prefer payment by Government Commercial Purchase Card (GCPC) or Wide Area WorkFlow (WAWF, the DoD online invoicing system)
- List the country of origin for each line item; if you are not the actual manufacturer, give the manufacturer's name, location and business size
- Complete the provisions 52.204-24, 52.204-26, 252.204-7016 and 252.204-7019 and include them with the offer
- Show clearly that you can meet all specifications and requirements
- Complete the Section K forms: certification of whether you are the actual manufacturer, and the place-of-performance form naming the producing facility
- Send your current documented quality system procedures to the contracting officer before award, as the technical data package requires of Level I suppliers
- Do not offer parts made by additive manufacturing (3D printing); such offers are not evaluated
After award, you must have
- Carrier drivers entering the shipyard must be U.S. citizens by birth or carry evidence of naturalization From Solicitation - SPMYM327Q5004.pdf:
CARRIER'S DRIVERS ENTERING PORTSMOUTH NAVAL SHIPYARD MUST BE UNITED STATES CITIZENS BY BIRTH OR…
Not in the notice text
- How, when and where the required site visit is arranged, and what counts as completed, is not stated in the notice or attachments
- The provisions 52.204-24, 52.204-26, 252.204-7016 and 252.204-7019 that the notice says are attached were not found in the solicitation text; check the files on SAM.gov
- How the Government furnished silver is delivered, and how much, is not stated
- Whether these rings are designated a critical safety item (the sourcing clause is included but no item is named) is not stated
- Whether an award will be a DX or DO rated priority order is not stated
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- DLA Maritime - Portsmouth, NH
- Product/service code
- 3439 · Miscellaneous Welding, Soldering, and Brazing Supplies and Accessories
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 333992)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Braze Wire 1/16"NAVSUP Weapon Systems Support Mechanicsburg (the Navy's supply command) wants silver brazing wire, grade V, 0.0625 x 18 inches, made to specification QQ-B-654: QTY 1,000, Each.
- Insert, WeldingThe Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH, the Navy supply command in Mechanicsburg) wants welding inserts (filler material) built to MIL-I-23413, QTY 12, unit of issue not…
- Rod, WeldingThe Navy's NAVSUP (Naval Supply Systems Command) Weapon Systems Support wants QTY 16, unit not stated, of welding rod (Type 120S-1, size .045, spool weight 25) for a crucial…
- Rod, WeldingThe Navy's supply office at NAVSUP Weapon Systems Support Mechanicsburg wants welding rod (type MIL-120S-1, size 1/16) for crucial shipboard systems.
- Electrode, WeldingThe Navy's NAVSUP Weapon Systems Support (the Navy's supply and parts buying office) wants welding electrode (copper-nickel-aluminum alloy welding wire on spools) built to…