Solicitation
Fire Alarm Control Panel Replacement Project (FACPR)
Department of Energy
AI summary Beta
The notice looks incomplete: Parts of the RFP and attachments were attached but not read in full (the middle of the RFP, the statement of work, the subcontract, the general provisions and the representations form). Check them on SAM.gov for the relative importance of the evaluation factors, the full proposal submittal rules and the minimum requirements. Check the attachments on SAM.gov.
Solicitation 2026-PTG-FACPR: the University of California, which runs Lawrence Berkeley National Laboratory for the Department of Energy, wants one design-build firm to replace fire alarm control panels in Buildings 2, 26, 33 and 76 in Berkeley, California. Attendance at the pre-proposal conference and site inspection on December 3, 2026 is mandatory. The response due date is January 8, 2027, 5:00 PM Pacific.
Who can bid (7)
- Hold an active California Contractors State License Board license, and list its classification and number From C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
- Attend the mandatory pre-proposal conference and on-site inspection on December 3, 2026 From _FACPR_RFP (11.12.26).pdf
- An experience modification rate above 1.00 in any of the three most recent premium years gets an Unacceptable rating on the Safety factor From B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf
Show all 7Show fewer
- Three past-performance references for similar projects of about $500,000 or more completed in the past ten years From B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf
- Named licensed professionals (engineer of record, fire protection engineer, electrical engineer) must hold a current California license From B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf
- Propose a Siemens Desigo qualified lead fire alarm technician From B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf
- Provide an onsite health and safety representative (Option C: part-time, at least two years of construction health and safety experience, 30-hour OSHA training) From A_Statement of Work for Subcontract 7889840 (10.12.26).pdf
How to submit: Email to the University Procurement Representative, Peter Gajda, ptgajda@lbl.gov (or another secure electronic method). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 17, 2026.
- Serious: Mandatory pre-proposal conference and site inspection on December 3, 2026. Attendance is required at the Berkeley site, 9:30 AM to 11:30 AM Pacific, and a firm that does not attend gets no evaluation. From _FACPR_RFP (11.12.26).pdf
- Serious: California contractor's license needed. The price form has the offeror state its active California Contractors State License Board license and classification. From C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
- Serious: Performance and payment bonds at 100% of the price. A surety bond for the full subcontract price, both kinds, is due after award and before work starts, and its cost is built into your prices. From C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
Show all 11Show fewer
- Serious: Safety record can remove an offer. An experience modification rate above 1.00 in any of three years rates the Safety factor Unacceptable, and an undisclosed serious, willful or repeat citation makes a proposal non-responsive. From B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf
- Worth checking: Wage rule: construction wage rates (formerly Davis-Bacon). Workers must be paid at least General Wage Decision No. CA20260018 Mod 8, with weekly payroll reports in LCPtracker; federal or California wages, whichever is higher, must be priced in. From D_Subcontract_FACRP (11.12.26).pdf
- Worth checking: Questions due December 10, 2026. Questions go by email to the University Procurement Representative only; contacting other Lab staff may disqualify a firm. From _FACPR_RFP (11.12.26).pdf
- Worth checking: Siemens Desigo required, but the text also allows brand name or equal. The RFP says no substitutions will be considered for Siemens Desigo, while its brand name or equal provision says equal items may be offered; ask the procurement representative which governs. From _FACPR_RFP (11.12.26).pdf
- Worth checking: Fixed price with records that may not match the field. Drawings are only a general baseline, so you carry the risk of what you find, though a revised proposal is allowed at the 95% design. From _FACPR_RFP (11.12.26).pdf
- Worth checking: Work in occupied research buildings with asbestos and lead possible. Asbestos and lead may be present, fire alarm outages must be managed with the Lab fire watch, and occupants need six months written notice before cutover. From _FACPR_RFP (11.12.26).pdf
- Minor: Bond due date given two ways. The price form says bonds are due within ten working days after award, while the subcontract says documents are due no later than 10 days after award. From C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
- Minor: Size standard period given two ways. The RFP bases the $19.0 million size standard on five fiscal years and the subcontract on three; this is not a set-aside, so it matters little for eligibility. From _FACPR_RFP (11.12.26).pdf
Read from the notice and 9 attachments. Show which files.
- F_Insurance Certificate Instructions (10.09.26).pdf (read)
- _FACPR_RFP (11.12.26).pdf (read)
- A_Statement of Work for Subcontract 7889840 (10.12.26).pdf (read)
- D_Subcontract_FACRP (11.12.26).pdf (read)
- E_GPs for Fixed Price Design-Build (10.9.26).pdf (read)
- H_Small Business Subcontracting Plan (9.29.26).pdf (read)
- B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf (read)
- C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf (read)
- G_Representations and Certifications Form.pdf (read)
Full summary
What they want
- Inspect each building and check what is actually installed, since drawings from 1993 may not match
- Act as engineer of record and produce stamped design packages at 50%, 75%, 95% and 100% for Lab review
- Buy and install new Siemens Desigo fire alarm control panels, conduit, conductors and backup batteries; remove the old panels and batteries
- Reconnect the system to the existing StarLink communication cabinets, the central monitoring station, the Energy Management Control System and lighting controls
- Manage each fire alarm outage with the Lab-provided fire watch, and cut over one building at a time
- Test, commission and document the systems for the Lab Fire Marshal, and deliver record drawings
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) design-build subcontract, with separate fixed-price lines for the design and construction of each building
- Period of performance
- From subcontract signature through March 7, 2028
- Place of performance
- Lawrence Berkeley National Laboratory, Buildings 2, 26, 33 and 76, One Cyclotron Road, Berkeley, CA 94720
- Estimated value
- The University's estimate is approximately $700,000-1,400,000, for planning only; it is not a floor, a ceiling or a commitment
- How they'll choose
- Tradeoff best value: technical factors are weighed together with price, and the award may go to a firm that is not the lowest priced
- Offers due
- January 8, 2027, 5:00 PM Pacific
- How to submit
- Email to the University Procurement Representative, Peter Gajda, ptgajda@lbl.gov (or another secure electronic method)
- Page limits
- Resumes: 1 page each
What they'll judge offers on
- Safety: experience modification rate, injury and illness record, OSHA and Cal-OSHA citations, injury and illness prevention program, project safety approach, lower-tier subcontractor safety, onsite health and safety representative
- Relevant Past Performance: three references for similar projects, with emphasis on design-build fire alarm work in occupied facilities
- Technical Approach, Schedule, and Management: understanding, field verification, design approach, hazardous materials, critical path schedule, outages and cutover, submittals and procurement, commissioning, quality management
- Key Personnel and Organizational Capability: organization chart, named key team members with one-page resumes, self-performed versus subcontracted work
- Price: the Total Lump Sum Price in Table A of the price proposal form is the evaluated price
What to include when you submit
- Attend the mandatory pre-proposal conference and on-site inspection; each firm may send up to three key team members
- Send a Technical Volume answering Attachment B, with each answer clearly tied to its evaluation factor, and no pricing in it
- Send a price proposal on Attachment C: Table A prices for each building, Table B cost breakdown, design and construction calendar days (finishing by March 7, 2028), a fixed per-day amount for suspension of work, lower-tier subcontractors, and a signature
- Do not add exclusions, qualifications or conditions to the price form; an offer that conditions its price may be found non-responsive
- Give three references for similar projects valued at approximately $500,000 or more and completed within the past ten years, with the client contact, contract value, dates, whether design-build, and whether on schedule and on budget
- Safety: experience modification rate for the three most recent premium years with carrier documentation, OSHA 300A summaries with recordable and days-away rates for three years, a citation disclosure, and a copy of your injury and illness prevention program
- Send a critical path method schedule showing the 50%, 75%, 95% and 100% design submittals, construction, outage windows and record drawings, allowing two weeks for each design review and ten business days for each safety review
- Send an organization chart and a one-page resume for each key team member: project manager, engineer of record, fire protection engineer, electrical engineer, construction superintendent, lead fire alarm technician and onsite health and safety representative
- Complete the Representations and Certifications form (Attachment G) and acknowledge all addenda on the price form
- Include a list of any hazardous material to be delivered or used on site
- State that the offer stays valid for 180 calendar days after the proposal due date
After award, you must have
- Furnish performance and payment bonds, each at 100% of the subcontract price, from a surety listed in U.S. Treasury Circular 570 From C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf:
The Offeror will furnish performance and payment bonds, each at 100% of the subcontract price…
- Submit insurance certificates and endorsements, a site-specific safety plan and job hazard analyses within 10 days after award, before any work at the site From D_Subcontract_FACRP (11.12.26).pdf:
Insurance Certificate and Endorsements…
- Enroll in E-Verify and send proof of enrollment within 10 days of award From D_Subcontract_FACRP (11.12.26).pdf:
Enroll as a Federal contractor in the online E-Verify System at: https://everify.uscis.gov…
Current contractor
No incumbent is named. An architecture and engineering firm, Enercon, prepared a conceptual design report in August 2024 that is given as reference information; no earlier fire alarm replacement contractor is named.
Not in the notice text
- Parts of the RFP and attachments were attached but not read in full (the middle of the RFP, the statement of work, the subcontract, the general provisions and the representations form). Check them on SAM.gov for the relative importance of the evaluation factors, the full proposal submittal rules and the minimum requirements.
- The relative importance of the evaluation factors (RFP section 2.9) was not in the text that was read.
- The RFP says to meet the minimum requirements in section 3.6, but its table of contents lists section 3.6 as construction wage rates; ask the procurement representative what the minimum requirements are.
- Insurance coverage amounts and the full list of required forms are in the subcontract and general provisions, which were only partly read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- Berkeley Natl Lab - DOE Contractor, CA
- Product/service code
- 1230 · Fire Control Systems, Complete
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238210)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- SACN Replace Fire Alarms and Intrusions SystemsThe National Park Service (Interior Department) wants small businesses to send sealed bids to replace the fire alarm and intrusion alarm systems in buildings at Saint Croix…
- Upgrade Fire Alarm System Construction 676-22-110Solicitation 36C25226B0014-1: the Department of Veterans Affairs (VA) wants a new campus-wide fire alarm system at the Tomah VA Medical Center in Tomah, Wisconsin, and only…
- Annual REC Solar Panel MaintenanceOnly service-disabled veteran-owned small businesses (SDVOSBs) listed in VA's Vendor Information Pages (VIP) can bid on solicitation 36C26227Q0119, a firm-fixed-price contract…
- Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.Only certified service-disabled veteran-owned small business (SDVOSB) or veteran-owned small business (VOSB) firms can bid on solicitation 36C25027B0002_1 from the Department of…
- Commercial Gear Backup Power (CGBP) and Control System Improvements at Fish BarrierThe U.S. Army Corps of Engineers (USACE) Chicago District issued sources sought notice W912P627MR027755, a market research request, for upgrading backup power and control systems…