Solicitation
GRTE 237343 - Rehab 4 Lazy F Ranch
Department of the Interior · National Park Service · Sol. 140P2026R0098
Track this notice by email. We'll email you if it's amended or awarded, and a week and two days before responses are due.
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
The National Park Service (Denver Service Center) wants a contractor to rehabilitate historic buildings at the former 4 Lazy F Ranch in Grand Teton National Park, near Moose, Wyoming, so they can be used as seasonal employee housing, along with new water, sewer, buried power and fiber sitework. It is a total small business set-aside, and the solicitation puts the size of the construction at greater than $10 million, with a 540 calendar day performance period shown on the subcontracting form. Proposals are due November 20, 2026, and the solicitation says funds are not yet available.
Watch out for
- Funds not yet available. No award will be made until money is available, and the Government can cancel before or after the closing date, with no reimbursement of your proposal costs.
Funds are not presently available for this effort
- Large project, over $10 million. The bonding, financing and project-management capacity needed for a project this size is a stretch for many small businesses, and past projects of similar scope and size are scored.
Magnitude of Construction: Greater than $10M
- Bid bond, then performance and payment bonds. You need a bid guarantee with the proposal and full bonds before notice to proceed, so you need a surety lined up before you bid.
Submit Standard Form 24, Bid Bond duly executed between the Offeror and the bonding
- Asbestos, lead paint and bat droppings in the buildings. The surveys found asbestos-containing materials (for example chrysotile in beam caulk and transite panels), lead-based paint has its own spec section, and large amounts of bat guano were found in the Main Lodge, so you need abatement-qualified crews or subs and a safety plan.
Large amounts of bat guano was observed on the floors and walls in all of the
- Historic preservation work. Logs, wood, masonry, doors and windows must be treated to historic standards, with hand tooling and matching of original materials, which needs specialized skills.
Log expert is required for this work.
- Remote, floodplain site in a national park. The site is in a FEMA flood zone and a test pit hit a buried septic line, and national park rules add logistics, environmental and work-window constraints.
The 4LF site is within the Special Flood Hazard Area (SFHA) Zone A
- Pre-solicitation meeting on site. An on-site meeting and tour is scheduled for October 29, 2026 at 9:00 am in Moose, Wyoming, and you must RSVP by email to attend. The base solicitation said a site visit would be scheduled later.
A presolicitation meeting has been scheduled for 10/29 at GRTE.
- Limit on how much you can subcontract. A small business prime on a set-aside has to keep a share of the work in-house or with similarly situated firms, which limits how much you can hand to subs.
52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)
- Many priced options evaluated together. Prices for all 15 options are added to the base price for evaluation, and the Government will check for unbalanced pricing across line items.
- Key personnel and liquidated damages clauses. The contract names key personnel and includes a liquidated damages clause for late completion, which add schedule and staffing risk.
SPECIAL REQUIREMENT 6: KEY PERSONNEL
Read from the notice and 12 attachments. 1 not read in full.
- Sol_140P2026R0098_Amd_0001.pdf
- Sol_140P2026R0098.pdf
- B08_140P2026R0098_GRTE_4LazyF.pdf
- B08_Attachment_02_GRTE_237343_Specifications.pdf
- B08_Attachment_10_Proposal_Submission_Package_GRTE.docx
- B08_Attachment_08_GRTE_237343_-_WY_DEQ_Permit_Application_4-Lazy_F_NPS_signed_07_29_2026.pdf
- B08_Attachment_09_DOL_Wage_Determination_WY20260041.pdf
- B08_Attachment_04_GRTE_237343_-_Combined_Histoplasma_Report_999-5237.pdf
- B08_Attachment_05_GRTE_237343_-_Combined_Lead_Based_Paint_Report_999-5237.pdf
- B08_Attachment_06_GRTE_237343_-_Geotechnical_Engineering_Report_09_19_25.pdf
- B08_Attachment_07_GRTE_237343_-_Water_Sewer_Design_Report.pdf
- B08_Attachment_03_GRTE_237343_-_Combined_Asbestos_Report_999-5237.pdf
- B08_Attachment_01_GRTE_4_Lazy_F_Rehab_Final_CD_Drawings_-_REDUCED_SIZE.pdf: too large
Full brief
What they want
- Base work: new sitework for the sewer system (the design report describes a lift station and force main), water system, buried power and fiber optic communications (CLINs 001A to 001D)
- Priced options: rehabilitate the Main Lodge and eight cabins (Options 1 to 9), plus the Ice House, Mouse House, 3-Bay Garage and Well House (Options 12 to 15)
- Priced options for sitework: parking lot (Option 10) and roadway and staging area restoration (Option 11)
- Historic preservation treatment of logs, wood, masonry, doors and windows, with a log expert required for log replacement and repair
- Abatement or control of asbestos-containing materials, lead-based paint and bat, bird and rodent droppings
- Building systems work listed in the specifications: fire sprinklers, plumbing, HVAC, electrical, communications and fire alarm
- Connect the buildings to park water and sewer mains and abandon the existing on-site well and septic
- Closeout items: operation and maintenance data and training
- Contract type
- Construction contract solicited by negotiated request for proposals, priced as lump-sum line items: 4 base items plus 15 priced options
- Period of performance
- 540 calendar days (as shown on the limitations on subcontracting form in the proposal package)
- Place of performance
- 4 Lazy F Ranch, Grand Teton National Park, near Moose, Teton County, Wyoming
- Estimated value
- Magnitude of construction stated as greater than $10 million
- How they'll choose
- Best value tradeoff (FAR Part 15.1). The Government may pay more than the lowest price when the benefits justify it, and intends to award without discussions.
- Offers due
- November 20, 2026, 1700 ET (extended by Amendment 0001; NPS says it does not intend to extend further)
What they'll judge offers on
- Factor 1: Technical Approach
- Factor 2: Project Experience
- Factor 3: Schedule
- Factor 4: Past Performance
- Price (all non-price factors combined are equally important to price)
What to include when you submit
- Volume I is the non-price proposal (technical approach, project experience, schedule, past performance); Volume II is the business and price proposal, one electronic copy only
- Volume II contents: SF 1442 (blocks 14 through 20C), amendment acknowledgments, Section B price schedule with every option priced, SF 24 bid bond or other suitable bid guarantee, Section K representations and certifications, General References form, Subcontracting Percentage Worksheet, and any proposed substitutions or equals
- Complete the Project Experience Questionnaire in the Proposal Submission Package for each referenced project
- Disclose in a narrative any past performance that may be less than fully satisfactory
- Acknowledge Amendment 0001 and any later amendments before the deadline
- Send questions only to the Contracting Officer
- To attend the pre-solicitation meeting, email the Contracting Officer (anthony_jasper@ios.doi.gov) with your firm name and the number of people attending
You must have
- Must qualify as a small business under NAICS 237110 (total small business set-aside). The size standard is in a clause in Section K that was not in the text provided.
This solicitation is being issued as a Total Small Business Set Aside.
- Active SAM.gov registration at the time the offer is submitted
Your firm must maintain current, active registration
- Bid guarantee with the proposal (SF 24 bid bond or other suitable guarantee)
Submit Standard Form 24, Bid Bond duly executed between the Offeror and the bonding
- Performance and payment bonds after award; notice to proceed is issued after the bonds are received
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN 2020)
- Limitations on subcontracting clause applies: the prime must perform a minimum share of the work with its own or similarly situated small business forces, and a worksheet is submitted with the proposal
52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)
- A log expert is required for the log replacement and repair work
Log expert is required for this work.
- Named key personnel are required under the contract (Special Requirement 6)
SPECIAL REQUIREMENT 6: KEY PERSONNEL
Not in the notice text
- Where and how to submit the proposal, and any page limits (Section L, instructions to offerors, was mostly not in the text provided)
- The NAICS size standard and the Section K representations (not in the text provided)
- The bid guarantee amount, liquidated damages amount and bond amounts
- Exactly how the SF 1442 performance period items are filled in (the form text is garbled); the 540 calendar days comes from the subcontracting form
- Which options the Government will actually exercise, and when funds will be available
- The drawings (too large to read) and most of the specifications, which are only partly included
- The Davis-Bacon wage determination (WY20260041) could not be read because the text was garbled
- Full text of the lead-based paint, asbestos, geotechnical and design reports (only parts included)
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Nov 20, 2026, 10:00 PM UTC
- Posted
- Oct 5, 2026
- Notice type
- Solicitation
- Solicitation
- 140P2026R0098
- Agency
- Department of the Interior · National Park Service
- Office
- DSC Contracting Services Division
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237110
- Product/service code
- Y1NZ
- Business type
- Energy, fuel & utilities
- Contracting contact
- Jasper, Tonytony_jasper@nps.gov3039692789
What similar contracts paid
11 contracts at this agency for the same NAICS and product/service codes had activity in the last 5 years, according to USAspending.gov. Small businesses won 25% of the dollars in this market over the last 3 fiscal years.
Before you respond
Full notice text from SAM.gov
Similar open opportunities
- Upgrade Water Tanks - FCI Texarkana, TxThe Federal Bureau of Prisons wants a contractor to rebuild the water storage and distribution system at the Federal Correctional Institution in Texarkana, Texas.
- Construction of the new Regional Storm Water Retention Basin at Detroit Arsenal, Warren, MIThe U.S. Army Corps of Engineers (Louisville District) is running a market survey (Sources Sought) to find out which firms could build a new regional storm water retention basin…
- Nemo Domestic Well Northern Hills Ranger District, Black Hills NF, South DakotaThe USDA Forest Service wants a contractor to drill and develop a new domestic water well (about 170 feet deep) and build a roughly 280-foot water line near Nemo, South Dakota…
- Bill Parkin (MAK)The Indian Health Service (IHS) wants quotes from small businesses to install a septic system (septic tank, pump tank and sand mound drainfield) and a water service connection at…
- 9-Mile Pump StationThe U.S. Army Corps of Engineers Detroit District, with Macomb County Public Works, wants a contractor to build a new 9-Mile Pump Station in St.